Skip to content

Report Claims Register

Updated: 2026-10-26. Stable IDs identify selected maintained report statements. Section summaries identify their relevant starting passage, not verbatim quotations. This is not exhaustive sentence enrollment, project approval or original-download authentication.

RPT01 - Phase 0 Regulatory Audit Report

Source: docs/reports/1_Regulatory_Audit_Report.md

Claim Line Statement Original sources
RPT01-C0009 7 This report compares the July 17, 2023 and January 20, 2026 editions of N.J.A.C. 7:8. The January amendments add a volumetric-reduction standard and change reconstruction, combined-area, water-quality and public-transportation provisions. Several familiar design values remain unchanged. NJAC_2026/njac7_8_OCR.pdf p. 6,35-43,47
RPT01-C0014 13 Both editions contain six subchapters: NJAC_2026/njac7_8_OCR.pdf p. 1-2
RPT01-C0015 15 1. General Provisions NJAC_2026/njac7_8_OCR.pdf p. 1-2
RPT01-C0016 16 2. General Requirements for Stormwater Management Planning NJAC_2026/njac7_8_OCR.pdf p. 1-2
RPT01-C0017 17 3. Regional Stormwater Management Planning NJAC_2026/njac7_8_OCR.pdf p. 1-2
RPT01-C0018 18 4. Municipal Stormwater Management Planning NJAC_2026/njac7_8_OCR.pdf p. 1-2
RPT01-C0019 19 5. Design and Performance Standards for Stormwater Management Measures NJAC_2026/njac7_8_OCR.pdf p. 1-2
RPT01-C0020 22 The subchapter structure is unchanged. January 2026 adds §5.6(d), the volumetric-reduction standard, and §5.10, Departmental variance. Basin safety remains a separate part of the rule, including trash racks, overflow grates and escape provisions. July contents, pp. 2–3; January contents, pp. 1–2. NJAC_2026/njac7_8_OCR.pdf p. 6,35-43,47
RPT01-C0030 32 Both editions define green infrastructure through infiltration, filtration by vegetation or soil, and storage for reuse. They already distinguish GI and non-GI practices. January's volumetric-reduction requirement adds a separate design obligation; it does not turn GI into a new retention-only definition. BMP_2023/2023_BMP_11_3_Manufactured_Treatment_Devices.pdf p. 1, BMP_2026/2026_BMP_14_Volumetric_Reductions_Standards.pdf p. 1
RPT01-C0033 36 The chapter families also predate January 2026: BMP_2023/2023_BMP_11_3_Manufactured_Treatment_Devices.pdf p. 1, BMP_2026/2026_BMP_11_3_Non_GI_Manufactured_Treatment_Devices.pdf p. 1, BMP_2023/2023_BMP_11_6_Wet_Ponds.pdf p. 1
RPT01-C0035 41 | Non-GI manufactured treatment devices | Chapter 11.3 | Chapter 11.3 | BMP_2023/2023_BMP_11_3_Manufactured_Treatment_Devices.pdf p. 1, BMP_2026/2026_BMP_11_3_Non_GI_Manufactured_Treatment_Devices.pdf p. 1
RPT01-C0036 43 | Non-GI wet ponds | Chapter 11.6 | Chapter 11.6 | BMP_2023/2023_BMP_11_6_Wet_Ponds.pdf p. 1, BMP_2026/2026_BMP_11_6_Wet_Ponds_Non_GI.pdf p. 1
RPT01-C0037 40 | Bioretention | Small-scale Chapter 9.7 and Chapter 10.1 | Same split and Bioretention Systems (Large-Scale) title | BMP_2023/2023_BMP_10_1_Bioretention_Systems.pdf p. 1, BMP_2026/2026_BMP_10.1_LargeScale_Bioretention_Systems.pdf p. 1
RPT01-C0038 42 | Sand filters with underdrains | Chapter 11.4, non-GI | Chapter 11.4, non-GI | BMP_2023/2023_BMP_11_4_Sand_Filters.pdf p. 1, BMP_2026/2026_BMP_11.4_Sand_Filters_With_Underdrain.pdf p. 1
RPT01-C0041 26 The individual one-acre disturbance and quarter-acre regulated-impervious and regulated-motor-vehicle thresholds continue. January 2026 adds reconstruction of at least 0.25 acre of motor-vehicle or impervious surface and expands the combined-area test to include reconstruction. Apply each definition's stated accrual dates, count overlapping surfaces only once, and aggregate developments that are part of a common plan of development or sale. NJAC_2026/njac7_8_OCR.pdf p. 6
RPT01-C0052 49 The July 2023 rule already uses regulated motor-vehicle surface as its runoff-quality trigger. January 2026 additionally addresses reconstruction of motor-vehicle surface and its associated treatment obligations. The February 2004 Chapter 4 in the older manual collection uses earlier impervious-surface terminology; that chapter does not replace the July 2023 rule. NJAC_2026/njac7_8_OCR.pdf p. 38-39
RPT01-C0061 61 Use the pre-construction assumptions in §5.7 for the selected method. The woods/good presumption may be replaced only by the documented uninterrupted five-year condition allowed by the rule; if multiple qualifying covers existed, use the one producing the lowest runoff. Do not substitute those assumptions for the distinct reference condition used in the volumetric-reduction alternative. January §5.7, pp. 43–44. NJAC_2026/njac7_8_OCR.pdf p. 43-44
RPT01-C0062 63 Design permeability is derived from the governing tested rate with a factor of safety of 2, subject to the applicable practice's minimum and maximum design rates. A tested rate and a design rate are different quantities. Chapter 12 lists recognized in-situ methods, including percolation, tube permeameter, single-ring, basin-flooding and ASTM D3385 double-ring testing. ASTM D5126 is not identified as the governing method in this chapter. The Chapter 12 copy in both collections is printed March 2024, so it does not establish the exact July 2023 historical chapter. Chapter 12, pp. 27–29. BMP_2023/2023_BMP_6_Groundwater_Recharge.pdf p. 17, BMP_2026/2026_BMP_13_Groundwater_Mounding_Analysis.pdf p. 4, BMP_2023/2023_BMP_12_Soil_Testing_Criteria.pdf p. 27, BMP_2023/2023_BMP_12_Soil_Testing_Criteria.pdf p. 29
RPT01-C0063 65 Whenever the design includes infiltration into subsoil, assess hydraulic impacts under §5.2(h) and Chapter 13. There is no standalone 2.99 in/hr rule trigger. Determine whether mounding interferes with the BMP, nearby structures or other protected uses; redesign or relocate where adverse impacts arise. January §5.2(h), p. 33; Chapter 13, pp. 1–5. NJAC_2026/njac7_8_OCR.pdf p. 33, BMP_2023/2023_BMP_9_8_Small_Scale_Infiltration_Basins.pdf p. 24
RPT01-C0065 69 Both editions use current and projected two-, 10- and 100-year storms. One permitted pathway in §5.6(b)3 limits post-construction peak rates to 50%, 75% and 80%, respectively, of pre-construction rates. Apply the pathway's scope and developed-area conditions; the rule also provides other quantity demonstrations. January §5.6(b)2i adds conditioned relief from downstream analysis, not a universal exemption. July §5.6, pp. 42–43; January §5.6, pp. 41–43. NJAC_2026/njac7_8_OCR.pdf p. 41-43
RPT01-C0072 63 Design permeability is derived from the governing tested rate with a factor of safety of 2, subject to the applicable practice's minimum and maximum design rates. A tested rate and a design rate are different quantities. Chapter 12 lists recognized in-situ methods, including percolation, tube permeameter, single-ring, basin-flooding and ASTM D3385 double-ring testing. ASTM D5126 is not identified as the governing method in this chapter. The Chapter 12 copy in both collections is printed March 2024, so it does not establish the exact July 2023 historical chapter. Chapter 12, pp. 27–29. BMP_2023/2023_BMP_6_Groundwater_Recharge.pdf p. 17, BMP_2026/2026_BMP_13_Groundwater_Mounding_Analysis.pdf p. 4, BMP_2023/2023_BMP_12_Soil_Testing_Criteria.pdf p. 27, BMP_2023/2023_BMP_12_Soil_Testing_Criteria.pdf p. 29
RPT01-C0076 71 County rainfall factors are unchanged between these editions. Use NOAA Atlas 14 rainfall with the appropriate current adjustment or future change factor; do not multiply the projected factor by the current factor a second time. Bergen's future factors are 1.20, 1.23 and 1.37 for the two-, 10- and 100-year storms in both editions. July Tables 5-5 and 5-6, pp. 45–46; January tables, pp. 44–46. NJAC_2026/njac7_8_OCR.pdf p. 44-46
RPT01-C0096 45 Small-scale bioretention retains its 2.5-acre contributory drainage-area limit. Neither a new one-acre dividing line nor a newly created large-scale chapter describes this comparison. Earlier Chapter 9.7, p. 1; January Chapter 9.7, p. 1; earlier Chapter 10.1; January Chapter 10.1. BMP_2023/2023_BMP_9_7_Small_Scale_Bioretention_Systems.pdf p. 3, NJAC_2026/njac7_8_OCR.pdf p. 33, BMP_2023/2023_BMP_10_1_Bioretention_Systems.pdf p. 1, BMP_2026/2026_BMP_10.1_LargeScale_Bioretention_Systems.pdf p. 1
RPT01-C0143 97 | Bioretention scale | Existing 2.5-acre small-scale limit and large-scale chapter | Same limit, split and large-scale chapter title | BMP_2023/2023_BMP_9_7_Small_Scale_Bioretention_Systems.pdf p. 3, NJAC_2026/njac7_8_OCR.pdf p. 33, BMP_2023/2023_BMP_10_1_Bioretention_Systems.pdf p. 1, BMP_2026/2026_BMP_10.1_LargeScale_Bioretention_Systems.pdf p. 1
RPT01-C0148 65 Whenever the design includes infiltration into subsoil, assess hydraulic impacts under §5.2(h) and Chapter 13. There is no standalone 2.99 in/hr rule trigger. Determine whether mounding interferes with the BMP, nearby structures or other protected uses; redesign or relocate where adverse impacts arise. January §5.2(h), p. 33; Chapter 13, pp. 1–5. NJAC_2026/njac7_8_OCR.pdf p. 33, BMP_2023/2023_BMP_9_8_Small_Scale_Infiltration_Basins.pdf p. 24

RPT02 - Phase 1C Engineering Content

Source: docs/reports/3_Engineering_Content_Report.md

Claim Line Statement Original sources
RPT02-C0001 140 Both supplied Chapter 6 documents are the July 2023 revision; the NJGRS instructions are unchanged in this comparison. BMP_2023/2023_BMP_6_Groundwater_Recharge.pdf p. 1-30, BMP_2026/2026_BMP_6_Groundwater_Recharge.pdf p. 1-30

RPT03 - Phase 3 - Master 2026 Synthesis: Subsurface Engineering, Volumetric Reduction, and Manual Reorganization

Source: docs/reports/8_Master2026_Content_Report.md

Claim Line Statement Original sources
RPT03-C0001 39 The supplied Chapter 12 documents in both collections are printed March 2024; January 2026 adds both §5.6(d) and Chapter 14. BMP_2023/2023_BMP_12_Soil_Testing_Criteria.pdf p. 1,12-18, BMP_2026/2026_BMP_12_Soil_Testing_Criteria.pdf p. 1,12-18, BMP_2026/2026_BMP_14_Volumetric_Reductions_Standards.pdf p. 1-3, NJAC_2026/njac7_8_OCR.pdf p. 42-43

RPT04 - Phase 1B Planning Report

Source: docs/reports/2_Planning_Content_Report.md

Claim Line Statement Original sources
RPT04-C0001 168 The supplied Chapters 1 and 2 remain materially unchanged; the January 2026 Chapter 3 expands climate-resilience and mitigation planning guidance. BMP_2023/2023_BMP_1_Impacts_of_Development_on_Runoff.pdf p. 1-6, BMP_2023/2023_BMP_2_Low_Impact_Development_Techniques.pdf p. 1-21, BMP_2023/2023_BMP_3_Regional_and_Municipal_SWM_Plans.pdf p. 7-9, BMP_2026/2026_BMP_1_Impacts_of_Development_on_Runoff.pdf p. 1-6, BMP_2026/2026_BMP_2_Low_Impact_Development_Techniques.pdf p. 1-21, BMP_2026/2026_BMP_3_Regional_and_Municipal_SWM_Plans.pdf p. 9,13-16,19-23

RPT05 - Phase 2A Maintenance Content

Source: docs/reports/4_Maintenance_Protocol_Report.md

Claim Line Statement Original sources
RPT05-C0001 65 The maintenance-plan deed recording obligation under 7:8-5.8(d) applies where the responsible party is not a public agency; annual effectiveness review and detailed logs remain required. NJAC_2026/njac7_8_OCR.pdf p. 46-47, NJAC_2023/n.j.a.c.7-8-july-2023_OCR.pdf p. 47

RPT06 - Phase 2B - Small-Scale Green Infrastructure (GI) BMPs

Source: docs/reports/5_SmallScaleGI_Content_Report.md

Claim Line Statement Original sources
RPT06-C0001 81 The small-scale Chapter 9.7 / large-scale Chapter 10.1 bioretention split and Bioretention Systems (Large-Scale) title already exist in both collections. BMP_2023/2023_BMP_9_7_Small_Scale_Bioretention_Systems.pdf p. 1, BMP_2026/2026_BMP_9_7_Small_Scale_Bioretention_Systems.pdf p. 1, BMP_2023/2023_BMP_10_1_Bioretention_Systems.pdf p. 1, BMP_2026/2026_BMP_10.1_LargeScale_Bioretention_Systems.pdf p. 1

RPT07 - Phase 2C - Large-Scale Green Infrastructure (GI) Systems

Source: docs/reports/6_LargeScaleGI_Content_Report.md

Claim Line Statement Original sources
RPT07-C0001 69 GI wet ponds require at least 10 feet of native vegetation along at least 50 percent of shoreline and a beneficial-reuse retention component; 90 percent TSS requires 24 hours of extended detention and a 3:1 pool-to-WQDS volume ratio. BMP_2023/2023_BMP_10_5_Wet_Ponds.pdf p. 1,3,10, BMP_2026/2026_BMP_10_5_Wet_Ponds.pdf p. 1,3,10

RPT08 - Phase 2D - Non-GI Stormwater Practices and Manufactured Treatment Devices (MTDs)

Source: docs/reports/7_NonGI_MTD_Content_Report.md

Claim Line Statement Original sources
RPT08-C0001 83 The Chapter 11 performance framework retains 40–60 percent TSS for extended detention, 50 or 80 percent for certified non-GI MTDs, 90 percent TSS with 90 percent nitrogen in gravel-wetland prose, 50–90 percent wet-pond TSS, and 72-hour blue-roof drainage. BMP_2023/2023_BMP_11_1_Blue_Roofs.pdf p. 4, BMP_2023/2023_BMP_11_2_Extended_Detention_Basins.pdf p. 1, BMP_2023/2023_BMP_11_3_Manufactured_Treatment_Devices.pdf p. 1, BMP_2023/2023_BMP_11_5_Subsurface_Gravel_Wetlands.pdf p. 1, BMP_2023/2023_BMP_11_6_Wet_Ponds.pdf p. 1, BMP_2026/2026_BMP_11_1_Blue_Roofs.pdf p. 4, BMP_2026/2026_BMP_11_2_Extended_Detention_Basins.pdf p. 1, BMP_2026/2026_BMP_11_3_Non_GI_Manufactured_Treatment_Devices.pdf p. 1, BMP_2026/2026_BMP_11_5_Subsurface_Gravel_Wetlands.pdf p. 1, BMP_2026/2026_BMP_11_6_Wet_Ponds_Non_GI.pdf p. 1