Tables: Stormwater Pollutant Removal Criteria

Back to source | Source PDF | Structured table records

Table fragments retain their source context. Refer to the original page for layout, figures, merged headings and notes.

1. Table 4-1: TSS Removal Rates for BMPs

BMP 2004, Ch 4, p. 2

Best Management Practice (BMP) Adopted TSS Removal Rate (%)
Bioretention System 90
Constructed Stormwater Wetland 90
Dry Well Volume Reduction Only^{1}
Extended Detention Basin 40 to 60^{2}
Infiltration Structure 80
Manufactured Treatment Device See N.J.A.C. 7:8-5.7(d)^{3}
Pervious Paving System Volume Reduction
Or
80^{4}
Sand Filter 80
Vegetative Filter 60-80
Wet Pond 50-90^{5}
Source context and notes # TSS Removal Rates for Individual BMPs As noted above, the Stormwater Management Rules require an 80 percent TSS reduction in the post-construction runoff from a land development site that increases impervious surface by 0.25 acres or more. This reduction is to be achieved by conveying the site's runoff through one or more onsite BMPs that have the ability to remove a portion of the TSS load. To demonstrate compliance with this requirement, the NJDEP has adopted official TSS removal rates for each of the BMPs described in detail in Chapter 9. These BMPs and their adopted TSS removal rates are presented below in Table 4-1. Different removal rates and BMPs may be utilized if supporting information is provided and accepted by the applicable review agencies. It is important to note that the TSS removal rates shown in Table 4-1 have been based upon several sources of BMP research and monitoring data as well as consultation with numerous stormwater management experts. As demonstrated by that research, actual TSS removals at specific BMPs during specific storm events will depend upon a number of site factors and can be highly variable. As such, the TSS removal rates presented in Table 4-1 are considered representative values that are based upon a recognition of this variability and the state's need to develop and implement a statewide stormwater management program. Furthermore, the TSS removal rates are also considered to accurately represent the relative TSS removal efficiencies of the various BMPs listed in the table. Table 4-1: TSS Removal Rates for BMPs | Best Management Practice (BMP) | Adopted TSS Removal Rate (%) | | --- | --- | | Bioretention System | 90 | | Constructed Stormwater Wetland | 90 | | Dry Well | Volume Reduction Only^{1} | | Extended Detention Basin | 40 to 60^{2} | | Infiltration Structure | 80 | | Manufactured Treatment Device | See N.J.A.C. 7:8-5.7(d)^{3} | | Pervious Paving System | Volume Reduction
Or
80^{4} | | Sand Filter | 80 | | Vegetative Filter | 60-80 | | Wet Pond | 50-90^{5} | 1 See text below. 2 Final rate based upon detention time. See Chapter 9. 3 To be determined through testing on a case-by-case basis. See text below. 4 If system includes a runoff storage bed that functions as an infiltration basin. See Chapter 9. 5 Final rate based upon pool volume and detention time. See Chapter 9.

2. Table 4.2 – Typical Phosphorous and Nitrogen Removal Rates for BMPs

BMP 2004, Ch 4, p. 8

Best Management Practice (BMP) Total Phosphorous Removal Rate (%) Total Nitrogen Removal Rate (%)
Bioretention Basin 60 30
Constructed Stormwater Wetland 50 30
Extended Detention Basin 20 20
Infiltration Basin 60 50
Manufactured Treatment Devices See N.J.A.C. 7:8-5.7(d) See N.J.A.C. 7:8-5.7(d)
Pervious Paving² 60 50
Sand Filter 50 35
Vegetative Filter 30 30
Wet Pond 50 30
Source context and notes # Stormwater Pollutant Removal Criteria Source revision: February 2004. Table 4.2 – Typical Phosphorous and Nitrogen Removal Rates for BMPs | Best Management Practice (BMP) | Total Phosphorous Removal Rate (%) | Total Nitrogen Removal Rate (%) | | --- | --- | --- | | Bioretention Basin | 60 | 30 | | Constructed Stormwater Wetland | 50 | 30 | | Extended Detention Basin | 20 | 20 | | Infiltration Basin | 60 | 50 | | Manufactured Treatment Devices | See N.J.A.C. 7:8-5.7(d) | See N.J.A.C. 7:8-5.7(d) | | Pervious Paving² | 60 | 50 | | Sand Filter | 50 | 35 | | Vegetative Filter | 30 | 30 | | Wet Pond | 50 | 30 | The nutrient removal rates presented in Table 4-2 should be considered typical values based upon data from a range of research studies. Due to the multiple forms and complex behavior of nutrients in stormwater runoff and the similarly complex processes by which nutrient loading is altered by BMPs, actual removal rates for specific BMPs and development sites may vary. The nutrient removal data in Table 4-2 is intended to assist designers in the selection of appropriate BMPs to meet both the 80 percent TSS and maximum feasible nutrient removal requirements in the NJDEP Stormwater Management Rules. During this selection process, primary consideration should be given to achieving the Rules' 80 percent TSS removal requirement with one or more BMPs that are compatible with and responsive to site conditions and constraints, maintenance needs, and safety concerns. The selection process should then be further refined to achieve the Rules' maximum feasible nutrient requirement utilizing the structural BMP data in Figure 4.2 and, as necessary, other appropriate resources. In doing so, it should be remembered that many nonstructural BMPs can also help achieve the nutrient removal requirement, and must be considered prior to the use of structural BMPs. The nutrient removal data in Table 4-2 can also be used to optimize existing BMP retrofits.