1. Table 5-1 Green Infrastructure BMPs for Groundwater Recharge, Stormwater Runoff Quality, and/or Stormwater Runoff Quantity

NJAC 7.8-5.2(f)

Best
Management
Practice
Stormwater
Runoff Quality
TSS removal
rate (percent)
Stormwater
Runoff Quantity
Groundwater
Recharge
Minimum
separation from
seasonal high-
water table
(feet)
Cistern 0 Yes No -
Dry Well(a) 0 No Yes 2
Grass Swale 50 or less No No 2(e)
1(f)
Green Roof 0 Yes No -
Manufactured
Treatment
Device(a) (g)
50 or 80 No No Dependent upon
the device
Pervious Paving
System(a)
80 Yes Yes(b)
No(c)
2(b)
1(c)
Small-Scale
Bioretention
Basin(a)
80 or 90 Yes Yes(b)
No(c)
2(b)
1(c)
Small-Scale
Infiltration
Basin(a)
80 Yes Yes 2
Small-Scale
Sand Filter(a) (b)
80 Yes Yes 2
Vegetative Filter
Strip
60-80 No No -
Source context and notes Source revision: Last amended September 21, 2026. (f) The tables below summarize the ability of stormwater best management practices identified and described in the New Jersey Stormwater Best Management Practices Manual to satisfy the green infrastructure, groundwater recharge, stormwater runoff quality, and stormwater runoff quantity standards specified in this chapter. When designed in accordance with the New Jersey Stormwater Best Management Practices Manual and this chapter, the stormwater management measures listed in Tables 5-1, 5-2, and 5-3 shall be presumed to be capable of providing stormwater controls for the design and performance standards as outlined in the tables below. Upon amendment of the New Jersey Stormwater Best Management Practices Manual to reflect additions or deletions of BMPs meeting these standards, or changes in the presumed performance of BMPs designed in accordance with the New Jersey Stormwater BMP Manual, the Department shall publish in the New Jersey Register a notice of administrative change revising the applicable table. Table 5-1 Green Infrastructure BMPs for Groundwater Recharge, Stormwater Runoff Quality, and/or Stormwater Runoff Quantity | Best
Management
Practice | Stormwater
Runoff Quality
TSS removal
rate (percent) | Stormwater
Runoff Quantity | Groundwater
Recharge | Minimum
separation from
seasonal high-
water table
(feet) | | --- | --- | --- | --- | --- | | Cistern | 0 | Yes | No | - | | Dry Well(a) | 0 | No | Yes | 2 | | Grass Swale | 50 or less | No | No | 2(e)
1(f) | | Green Roof | 0 | Yes | No | - | | Manufactured
Treatment
Device(a) (g) | 50 or 80 | No | No | Dependent upon
the device | | Pervious Paving
System(a) | 80 | Yes | Yes(b)
No(c) | 2(b)
1(c) | | Small-Scale
Bioretention
Basin(a) | 80 or 90 | Yes | Yes(b)
No(c) | 2(b)
1(c) | | Small-Scale
Infiltration
Basin(a) | 80 | Yes | Yes | 2 | | Small-Scale
Sand Filter(a) (b) | 80 | Yes | Yes | 2 | | Vegetative Filter
Strip | 60-80 | No | No | - | Table 5-2 Green Infrastructure BMPs for Stormwater Runoff Quantity (or for Groundwater Recharge and/or Stormwater Runoff Quality with a Waiver or Variance from N.J.A.C. 7:8-5.3) | Best Management Practice | Stormwater
Runoff
Quality TSS
removal rate
(percent) | Stormwater
Runoff
Quantity | Groundwater
Recharge | Minimum
separation
from seasonal
high-water
table (feet) | | --- | --- | --- | --- | --- | | Bioretention System | 80 or 90 | Yes | Yes(b)
No(c) | 2(b)
1(c) | | Infiltration Basin | 80 | Yes | Yes | 2 | | Sand Filter(b) | 80 | Yes | Yes | 2 | | Standard Constructed
Wetland | 90 | Yes | No | N/A | | Wet Pond(d) | 50-90 | Yes | No | N/A | | Table 5-3
BMPs for Groundwater Recharge, Stormwater Runoff Quality, and/or Stormwater Runoff
Quantity only with a Waiver or Variance from N.J.A.C. 7:8-5.3 | | | | | | --- | --- | --- | --- | --- | | Best Management Practice | Stormwater
Runoff
Quality
TSS removal
rate (percent) | Stormwater
Runoff
Quantity | Groundwater
Recharge | Minimum
separation
from seasonal
high-water
table
(feet) | | Blue Roof | 0 | Yes | No | N/A | | Extended Detention Basin | 40-60 | Yes | No | 1 | | Manufactured Treatment
Device(h) | 50 or 80 | No | No | Dependent
upon the
device | | Sand Filter(c) | 80 | Yes | No | 1 | | Subsurface Gravel Wetland | 90 | No | No | 1 | | Wet pond | 50-90 | Yes | No | N/A | Table notes: (a) subject to the applicable contributory drainage area limitation specified at N.J.A.C. 7:8-5.3(b); (b) designed to infiltrate into the subsoil; (c) designed with underdrains; (d) designed to maintain at least a 10-foot wide area of native vegetation along at least 50 percent of the shoreline and to include a stormwater runoff retention component designed to capture stormwater runoff for beneficial reuse, such as irrigation; (e) designed with a slope of less than two percent; (f) designed with a slope of equal to or greater than two percent; (g) manufactured treatment devices that meet the definition of green infrastructure at N.J.A.C. 7:8-1.2; (h) manufactured treatment devices that do not meet the definition of green infrastructure at N.J.A.C. 7:8-1.2.

2. Table 5-2 Green Infrastructure BMPs for Stormwater Runoff Quantity (or for Groundwater Recharge and/or Stormwater Runoff Quality with a Waiver or Variance from N.J.A.C. 7:8-5.3)

NJAC 7.8-5.2(f)

Best Management Practice Stormwater
Runoff
Quality TSS
removal rate
(percent)
Stormwater
Runoff
Quantity
Groundwater
Recharge
Minimum
separation
from seasonal
high-water
table (feet)
Bioretention System 80 or 90 Yes Yes(b)
No(c)
2(b)
1(c)
Infiltration Basin 80 Yes Yes 2
Sand Filter(b) 80 Yes Yes 2
Standard Constructed
Wetland
90 Yes No N/A
Wet Pond(d) 50-90 Yes No N/A
Source context and notes | Pervious Paving
System(a) | 80 | Yes | Yes(b)
No(c) | 2(b)
1(c) | | Small-Scale
Bioretention
Basin(a) | 80 or 90 | Yes | Yes(b)
No(c) | 2(b)
1(c) | | Small-Scale
Infiltration
Basin(a) | 80 | Yes | Yes | 2 | | Small-Scale
Sand Filter(a) (b) | 80 | Yes | Yes | 2 | | Vegetative Filter
Strip | 60-80 | No | No | - | Table 5-2 Green Infrastructure BMPs for Stormwater Runoff Quantity (or for Groundwater Recharge and/or Stormwater Runoff Quality with a Waiver or Variance from N.J.A.C. 7:8-5.3) | Best Management Practice | Stormwater
Runoff
Quality TSS
removal rate
(percent) | Stormwater
Runoff
Quantity | Groundwater
Recharge | Minimum
separation
from seasonal
high-water
table (feet) | | --- | --- | --- | --- | --- | | Bioretention System | 80 or 90 | Yes | Yes(b)
No(c) | 2(b)
1(c) | | Infiltration Basin | 80 | Yes | Yes | 2 | | Sand Filter(b) | 80 | Yes | Yes | 2 | | Standard Constructed
Wetland | 90 | Yes | No | N/A | | Wet Pond(d) | 50-90 | Yes | No | N/A | | Table 5-3
BMPs for Groundwater Recharge, Stormwater Runoff Quality, and/or Stormwater Runoff
Quantity only with a Waiver or Variance from N.J.A.C. 7:8-5.3 | | | | | | --- | --- | --- | --- | --- | | Best Management Practice | Stormwater
Runoff
Quality
TSS removal
rate (percent) | Stormwater
Runoff
Quantity | Groundwater
Recharge | Minimum
separation
from seasonal
high-water
table
(feet) | | Blue Roof | 0 | Yes | No | N/A | | Extended Detention Basin | 40-60 | Yes | No | 1 | | Manufactured Treatment
Device(h) | 50 or 80 | No | No | Dependent
upon the
device | | Sand Filter(c) | 80 | Yes | No | 1 | | Subsurface Gravel Wetland | 90 | No | No | 1 | | Wet pond | 50-90 | Yes | No | N/A | Notes to Tables 5-1, 5-2, and 5-3: Table notes: Table notes: (a) subject to the applicable contributory drainage area limitation specified at N.J.A.C. 7:8-5.3(b); (b) designed to infiltrate into the subsoil; (c) designed with underdrains; (d) designed to maintain at least a 10-foot wide area of native vegetation along at least 50 percent of the shoreline and to include a stormwater runoff retention component designed to capture stormwater runoff for beneficial reuse, such as irrigation; (e) designed with a slope of less than two percent; (f) designed with a slope of equal to or greater than two percent; (g) manufactured treatment devices that meet the definition of green infrastructure at N.J.A.C. 7:8-1.2; (h) manufactured treatment devices that do not meet the definition of green infrastructure at N.J.A.C. 7:8-1.2.

3. Table 5-3 BMPs for Groundwater Recharge, Stormwater Runoff Quality, and/or Stormwater Runoff Quantity only with a Waiver or Variance from N.J.A.C. 7:8-5.3

NJAC 7.8-5.2(f)

Table 5-3
BMPs for Groundwater Recharge, Stormwater Runoff Quality, and/or Stormwater Runoff
Quantity only with a Waiver or Variance from N.J.A.C. 7:8-5.3
Best Management Practice Stormwater
Runoff
Quality
TSS removal
rate (percent)
Stormwater
Runoff
Quantity
Groundwater
Recharge
Minimum
separation
from seasonal
high-water
table
(feet)
Blue Roof 0 Yes No N/A
Extended Detention Basin 40-60 Yes No 1
Manufactured Treatment
Device(h)
50 or 80 No No Dependent
upon the
device
Sand Filter(c) 80 Yes No 1
Subsurface Gravel Wetland 90 No No 1
Wet pond 50-90 Yes No N/A
Source context and notes | Best Management Practice | Stormwater
Runoff
Quality TSS
removal rate
(percent) | Stormwater
Runoff
Quantity | Groundwater
Recharge | Minimum
separation
from seasonal
high-water
table (feet) | | --- | --- | --- | --- | --- | | Bioretention System | 80 or 90 | Yes | Yes(b)
No(c) | 2(b)
1(c) | | Infiltration Basin | 80 | Yes | Yes | 2 | | Sand Filter(b) | 80 | Yes | Yes | 2 | | Standard Constructed
Wetland | 90 | Yes | No | N/A | | Wet Pond(d) | 50-90 | Yes | No | N/A | | Table 5-3
BMPs for Groundwater Recharge, Stormwater Runoff Quality, and/or Stormwater Runoff
Quantity only with a Waiver or Variance from N.J.A.C. 7:8-5.3 | | | | | | --- | --- | --- | --- | --- | | Best Management Practice | Stormwater
Runoff
Quality
TSS removal
rate (percent) | Stormwater
Runoff
Quantity | Groundwater
Recharge | Minimum
separation
from seasonal
high-water
table
(feet) | | Blue Roof | 0 | Yes | No | N/A | | Extended Detention Basin | 40-60 | Yes | No | 1 | | Manufactured Treatment
Device(h) | 50 or 80 | No | No | Dependent
upon the
device | | Sand Filter(c) | 80 | Yes | No | 1 | | Subsurface Gravel Wetland | 90 | No | No | 1 | | Wet pond | 50-90 | Yes | No | N/A | Notes to Tables 5-1, 5-2, and 5-3: Table notes: (a) subject to the applicable contributory drainage area limitation specified at N.J.A.C. 7:8-5.3(b); Table notes: (a) subject to the applicable contributory drainage area limitation specified at N.J.A.C. 7:8-5.3(b); (b) designed to infiltrate into the subsoil; (c) designed with underdrains; (d) designed to maintain at least a 10-foot wide area of native vegetation along at least 50 percent of the shoreline and to include a stormwater runoff retention component designed to capture stormwater runoff for beneficial reuse, such as irrigation; (e) designed with a slope of less than two percent; (f) designed with a slope of equal to or greater than two percent; (g) manufactured treatment devices that meet the definition of green infrastructure at N.J.A.C. 7:8-1.2; (h) manufactured treatment devices that do not meet the definition of green infrastructure at N.J.A.C. 7:8-1.2.

4. Table 2

NJAC 7.8-5.3(b)

Best Management Practice Maximum Contributory Drainage Area
1. Dry Well 1 acre
2. Manufactured Treatment Device 2.5 acres
3. Pervious Paving Systems Area of additional inflow cannot exceed three times the
area occupied by the BMP
4. Small-scale Bioretention Systems 2.5 acres
5. Small-scale Infiltration Basin 2.5 acres
6. Small-scale Sand Filter 2.5 acres
Source context and notes # N.J.A.C. 7:8 - Stormwater Management Rules (September 21, 2026) Source revision: Last amended September 21, 2026. (b) Except as provided at (f) through (j) below, to satisfy the groundwater recharge and stormwater runoff quality standards at N.J.A.C. 7:8-5.4 and 5.5, the design engineer shall utilize green infrastructure BMPs identified in Table 5-1 at N.J.A.C. 7:8-5.2(f) and/or an alternative stormwater management measure approved in accordance with N.J.A.C. 7:8-5.2(g). The following green infrastructure BMPs are subject to the following maximum contributory drainage area limitations: | Best Management Practice | Maximum Contributory Drainage Area | | --- | --- | | 1. Dry Well | 1 acre | | 2. Manufactured Treatment Device | 2.5 acres | | 3. Pervious Paving Systems | Area of additional inflow cannot exceed three times the
area occupied by the BMP | | 4. Small-scale Bioretention Systems | 2.5 acres | | 5. Small-scale Infiltration Basin | 2.5 acres | | 6. Small-scale Sand Filter | 2.5 acres |

5. Table 5-4: Water Quality Design Storm Distribution

NJAC 7.8-5.5(d)

Time
(Minutes)
Cumulative
Rainfall
(Inches)
Time
(Minutes)
Cumulative
Rainfall
(Inches)
Time
(Minutes)
Cumulative
Rainfall
(Inches)
1 0.00166 41 0.1728 81 1.0906
2 0.00332 42 0.1796 82 1.0972
3 0.00498 43 0.1864 83 1.1038
4 0.00664 44 0.1932 84 1.1104
5 0.00830 45 0.2000 85 1.1170
6 0.00996 46 0.2117 86 1.1236
7 0.01162 47 0.2233 87 1.1302
8 0.01328 48 0.2350 88 1.1368
9 0.01494 49 0.2466 89 1.1434
10 0.01660 50 0.2583 90 1.1500
11 0.01828 51 0.2783 91 1.1550
12 0.01996 52 0.2983 92 1.1600
13 0.02164 53 0.3183 93 1.1650
14 0.02332 54 0.3383 94 1.1700
15 0.02500 55 0.3583 95 1.1750
16 0.03000 56 0.4116 96 1.1800
17 0.03500 57 0.4650 97 1.1850
18 0.04000 58 0.5183 98 1.1900
19 0.04500 59 0.5717 99 1.1950
20 0.05000 60 0.6250 100 1.2000
21 0.05500 61 0.6783 101 1.2050
22 0.06000 62 0.7317 102 1.2100
23 0.06500 63 0.7850 103 1.2150
24 0.07000 64 0.8384 104 1.2200
25 0.07500 65 0.8917 105 1.2250
26 0.08000 66 0.9117 106 1.2267
27 0.08500 67 0.9317 107 1.2284
28 0.09000 68 0.9517 108 1.2300
29 0.09500 69 0.9717 109 1.2317
30 0.10000 70 0.9917 110 1.2334
31 0.10660 71 1.0034 111 1.2351
32 0.11320 72 1.0150 112 1.2367
33 0.11980 73 1.0267 113 1.2384
34 0.12640 74 1.0383 114 1.2400
35 0.13300 75 1.0500 115 1.2417
36 0.13960 76 1.0568 116 1.2434
37 0.14620 77 1.0636 117 1.2450
38 0.15280 78 1.0704 118 1.2467
39 0.15940 79 1.0772 119 1.2483
40 0.16600 80 1.0840 120 1.2500
Source context and notes (d) The water quality design storm is 1.25 inches of rainfall in two hours. Water quality calculations shall take into account the distribution of rain from the water quality design storm, as reflected in Table 5-4 below. The calculation of the volume of runoff may take into account the implementation of stormwater management measures. Table 5-4: Water Quality Design Storm Distribution | Time
(Minutes) | Cumulative
Rainfall
(Inches) | Time
(Minutes) | Cumulative
Rainfall
(Inches) | Time
(Minutes) | Cumulative
Rainfall
(Inches) | | --- | --- | --- | --- | --- | --- | | 1 | 0.00166 | 41 | 0.1728 | 81 | 1.0906 | | 2 | 0.00332 | 42 | 0.1796 | 82 | 1.0972 | | 3 | 0.00498 | 43 | 0.1864 | 83 | 1.1038 | | 4 | 0.00664 | 44 | 0.1932 | 84 | 1.1104 | | 5 | 0.00830 | 45 | 0.2000 | 85 | 1.1170 | | 6 | 0.00996 | 46 | 0.2117 | 86 | 1.1236 | | 7 | 0.01162 | 47 | 0.2233 | 87 | 1.1302 | | 8 | 0.01328 | 48 | 0.2350 | 88 | 1.1368 | | 9 | 0.01494 | 49 | 0.2466 | 89 | 1.1434 | | 10 | 0.01660 | 50 | 0.2583 | 90 | 1.1500 | | 11 | 0.01828 | 51 | 0.2783 | 91 | 1.1550 | | 12 | 0.01996 | 52 | 0.2983 | 92 | 1.1600 | | 13 | 0.02164 | 53 | 0.3183 | 93 | 1.1650 | | 14 | 0.02332 | 54 | 0.3383 | 94 | 1.1700 | | 15 | 0.02500 | 55 | 0.3583 | 95 | 1.1750 | | 16 | 0.03000 | 56 | 0.4116 | 96 | 1.1800 | | 17 | 0.03500 | 57 | 0.4650 | 97 | 1.1850 | | 18 | 0.04000 | 58 | 0.5183 | 98 | 1.1900 | | 19 | 0.04500 | 59 | 0.5717 | 99 | 1.1950 | | 20 | 0.05000 | 60 | 0.6250 | 100 | 1.2000 | | 21 | 0.05500 | 61 | 0.6783 | 101 | 1.2050 | | 22 | 0.06000 | 62 | 0.7317 | 102 | 1.2100 | | 23 | 0.06500 | 63 | 0.7850 | 103 | 1.2150 | | 24 | 0.07000 | 64 | 0.8384 | 104 | 1.2200 | | 25 | 0.07500 | 65 | 0.8917 | 105 | 1.2250 | | 26 | 0.08000 | 66 | 0.9117 | 106 | 1.2267 | | 27 | 0.08500 | 67 | 0.9317 | 107 | 1.2284 | | 28 | 0.09000 | 68 | 0.9517 | 108 | 1.2300 | | 29 | 0.09500 | 69 | 0.9717 | 109 | 1.2317 | | 30 | 0.10000 | 70 | 0.9917 | 110 | 1.2334 | | 31 | 0.10660 | 71 | 1.0034 | 111 | 1.2351 | | 32 | 0.11320 | 72 | 1.0150 | 112 | 1.2367 | | 33 | 0.11980 | 73 | 1.0267 | 113 | 1.2384 | | 34 | 0.12640 | 74 | 1.0383 | 114 | 1.2400 | | 35 | 0.13300 | 75 | 1.0500 | 115 | 1.2417 | | 36 | 0.13960 | 76 | 1.0568 | 116 | 1.2434 | | 37 | 0.14620 | 77 | 1.0636 | 117 | 1.2450 | | 38 | 0.15280 | 78 | 1.0704 | 118 | 1.2467 | | 39 | 0.15940 | 79 | 1.0772 | 119 | 1.2483 | | 40 | 0.16600 | 80 | 1.0840 | 120 | 1.2500 |

6. Table 5-5: Current Precipitation Adjustment Factors

NJAC 7.8-5.7(c)

County Current Precipitation Adjustment Factors
2-year
Design Storm
10-year
Design Storm
100-year
Design Storm
Atlantic 1.01 1.02 1.03
Bergen 1.01 1.03 1.06
Burlington 0.99 1.01 1.04
Camden 1.03 1.04 1.05
Cape May 1.03 1.03 1.04
Cumberland 1.03 1.03 1.01
Essex 1.01 1.03 1.06
Gloucester 1.05 1.06 1.06
Hudson 1.03 1.05 1.09
Hunterdon 1.02 1.05 1.13
Mercer 1.01 1.02 1.04
Middlesex 1.00 1.01 1.03
Monmouth 1.00 1.01 1.02
Morris 1.01 1.03 1.06
Ocean 1.00 1.01 1.03
Passaic 1.00 1.02 1.05
Salem 1.02 1.03 1.03
Somerset 1.00 1.03 1.09
Sussex 1.03 1.04 1.07
Union 1.01 1.03 1.06
Warren 1.02 1.07 1.15
Source context and notes (NOAA), National Weather Service’s Atlas 14 Point Precipitation Frequency Estimates: NJ, in accordance with the location(s) of the drainage area(s) of the site. This data is available at: https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_map_cont.html?bkmrk=nj; and 2. The applicant shall utilize Table 5-5 below, which sets forth the applicable multiplier for the drainage area(s) of the site, in accordance with the county or counties where the drainage area(s) of the site is located. Where the major development lies in more than one county, the precipitation values shall be adjusted according to the percentage of the drainage area in each county. Alternately, separate rainfall totals can be developed for each county using the values in the table below. Table 5-5: Current Precipitation Adjustment Factors | County | Current Precipitation Adjustment Factors | | | | --- | --- | --- | --- | | | 2-year
Design Storm | 10-year
Design Storm | 100-year
Design Storm | | Atlantic | 1.01 | 1.02 | 1.03 | | Bergen | 1.01 | 1.03 | 1.06 | | Burlington | 0.99 | 1.01 | 1.04 | | Camden | 1.03 | 1.04 | 1.05 | | Cape May | 1.03 | 1.03 | 1.04 | | Cumberland | 1.03 | 1.03 | 1.01 | | Essex | 1.01 | 1.03 | 1.06 | | Gloucester | 1.05 | 1.06 | 1.06 | | Hudson | 1.03 | 1.05 | 1.09 | | Hunterdon | 1.02 | 1.05 | 1.13 | | Mercer | 1.01 | 1.02 | 1.04 | | Middlesex | 1.00 | 1.01 | 1.03 | | Monmouth | 1.00 | 1.01 | 1.02 | | Morris | 1.01 | 1.03 | 1.06 | | Ocean | 1.00 | 1.01 | 1.03 | | Passaic | 1.00 | 1.02 | 1.05 | | Salem | 1.02 | 1.03 | 1.03 | | Somerset | 1.00 | 1.03 | 1.09 | | Sussex | 1.03 | 1.04 | 1.07 | | Union | 1.01 | 1.03 | 1.06 | | Warren | 1.02 | 1.07 | 1.15 |

7. Table 5-6: Future Precipitation Change Factors

NJAC 7.8-5.7(d)

County Future Precipitation Change Factors
2-year
Design Storm
10-year
Design Storm
100-year
Design Storm
Atlantic 1.22 1.24 1.39
Bergen 1.20 1.23 1.37
Burlington 1.17 1.18 1.32
Camden 1.18 1.22 1.39
Cape May 1.21 1.24 1.32
Cumberland 1.20 1.21 1.39
Essex 1.19 1.22 1.33
Gloucester 1.19 1.23 1.41
Hudson 1.19 1.19 1.23
Hunterdon 1.19 1.23 1.42
Mercer 1.16 1.17 1.36
Middlesex 1.19 1.21 1.33
Monmouth 1.19 1.19 1.26
Morris 1.23 1.28 1.46
Ocean 1.18 1.19 1.24
Passaic 1.21 1.27 1.50
Salem 1.20 1.23 1.32
Somerset 1.19 1.24 1.48
Sussex 1.24 1.29 1.50
Union 1.20 1.23 1.35
Warren 1.20 1.25 1.37
Source context and notes (d) Table 5-6 below sets forth the change factors to be used in determining the projected two-, 10-, and 100-year storm events for use in this chapter, which are organized alphabetically by county. The precipitation depth of the projected two-, 10-, and 100-year storm events of a site shall be determined by multiplying the precipitation depth of the two-, 10-, and 100-year storm events determined from the National Weather Service’s Atlas 14 Point Precipitation Frequency Estimates pursuant to (c)1 above, by the change factor in Table 5-6 below, in accordance with the county or counties where the drainage area(s) of the site is located. Where the major development and/or its drainage area lies in more than one county, the precipitation values shall be adjusted according to the percentage of the drainage area in each county. Alternately, separate rainfall totals can be developed for each county using the values in the table below. Table 5-6: Future Precipitation Change Factors | County | Future Precipitation Change Factors | | | | --- | --- | --- | --- | | | 2-year
Design Storm | 10-year
Design Storm | 100-year
Design Storm | | Atlantic | 1.22 | 1.24 | 1.39 | | Bergen | 1.20 | 1.23 | 1.37 | | Burlington | 1.17 | 1.18 | 1.32 | | Camden | 1.18 | 1.22 | 1.39 | | Cape May | 1.21 | 1.24 | 1.32 | | Cumberland | 1.20 | 1.21 | 1.39 | | Essex | 1.19 | 1.22 | 1.33 | | Gloucester | 1.19 | 1.23 | 1.41 | | Hudson | 1.19 | 1.19 | 1.23 | | Hunterdon | 1.19 | 1.23 | 1.42 | | Mercer | 1.16 | 1.17 | 1.36 | | Middlesex | 1.19 | 1.21 | 1.33 | | Monmouth | 1.19 | 1.19 | 1.26 | | Morris | 1.23 | 1.28 | 1.46 | | Ocean | 1.18 | 1.19 | 1.24 | | Passaic | 1.21 | 1.27 | 1.50 | | Salem | 1.20 | 1.23 | 1.32 | | Somerset | 1.19 | 1.24 | 1.48 | | Sussex | 1.24 | 1.29 | 1.50 | | Union | 1.20 | 1.23 | 1.35 | | Warren | 1.20 | 1.25 | 1.37 |