Extracted images: Appendix D: Model Stormwater Control Ordinance for Municipalities (Simplified Version)¶
Printed revision: January 2026.
Back to source | Original PDF | Image metadata
Original Mistral crops are preserved byte for byte. A crop can be a figure, table, equation, or other visual; no visual content is inferred as a numerical rule. Record and table associations use the same PDF page unless a direct image placeholder is identified. Nearby OCR excerpts are context, not verified captions.
PDF page 6, image 1¶
Mistral ID: img-0.jpeg. Extraction bundle(s): nj-swbmp-appendix-d-simplified-model-sco-january-2026_OCR. Original page | Image file

Surrounding OCR excerpt:
ies to any new stormwater management basin. Safety standards for stormwater management measures shall comply with last amended N.J.A.C. 7:8-6, incorporated herein by reference.
B. Safety Ledge Illustration
[OCR image]
Elevation View –Basin Safety Ledge Configuration
# Section VI. Requirements for a Site Development Stormwater Plan:
A. Submission of Site Development Stormwater Plan
1. Whenever an applicant seeks municipal approval of a development subject to this ordinance, the applicant shall submit all of the required components of the Checklist for the Site Development Stormwater Plan at Section VI.C below as pa