Skip to content

Tables: N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules

Back to source | Source PDF | Structured table records

Table fragments retain their source context. Refer to the original page for layout, figures, merged headings and notes.

1. Table 1

N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 106

Gallons Penalty
>0-9 $ 1,000
10-55 $ 2,000
56-499 $ 4,000
500-999 $ 6,000
1,000-4,999 $ 10,000
5,000-9,999 $ 15,000
10,000-19,999 $ 20,000
20,000-29,999 $ 30,000
30,000-39,999 $ 40,000
40,000-49,999 $ 50,000
50,000-59,999 $ 50,000
60,000-69,999 $ 50,000
70,000-79,999 $ 50,000
80,000-89,999 $ 50,000
90,000-99,999 $50,000
100,000-149,999 $ 150,000
150,000-199,999 $ 200,000
Source context and notes limit. | Gallons | Penalty | | --- | --- | | >0-9 | $ 1,000 | | 10-55 | $ 2,000 | | 56-499 | $ 4,000 | | 500-999 | $ 6,000 | | 1,000-4,999 | $ 10,000 | | 5,000-9,999 | $ 15,000 | | 10,000-19,999 | $ 20,000 | | 20,000-29,999 | $ 30,000 | | 30,000-39,999 | $ 40,000 | | 40,000-49,999 | $ 50,000 | | 50,000-59,999 | $ 50,000 | | 60,000-69,999 | $ 50,000 | | 70,000-79,999 | $ 50,000 | | 80,000-89,999 | $ 50,000 | | 90,000-99,999 | $50,000 | | 100,000-149,999 | $ 150,000 | | 150,000-199,999 | $ 200,000 |

2. Table 2

N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 107

200,000-299,999 $ 400,000
300,000-399,999 $ 800,000
400,000-499,999 $ 1,600,000
500,000-599,999 $ 2,000,000
600,000-699,999 $ 4,000,000
700,000-799,999 $ 6,000,000
800,000-899,999 $ 8,000,000
900,000 or greater $ 10,000,000
Source context and notes | 200,000-299,999 | $ 400,000 | | --- | --- | | 300,000-399,999 | $ 800,000 | | 400,000-499,999 | $ 1,600,000 | | 500,000-599,999 | $ 2,000,000 | | 600,000-699,999 | $ 4,000,000 | | 700,000-799,999 | $ 6,000,000 | | 800,000-899,999 | $ 8,000,000 | | 900,000 or greater | $ 10,000,000 | The base penalty shall be reduced or increased by applying the following factors¹: Area of Impact: Into waters of the State - 30% increase from base

3. Table 3

N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 109

Category of Offense^{2} Citation First Offense Second Offense Third or Subsequent Offense Minor^{3} Minor Days^{4}
No secondary containment for an above- ground storage tank 2.2(a)1 $20,000 $40,000 $50,000 NM
Failure to surface the base underlying a storage tank with impermeable material 2.2(a)2 $10,000 $20,000 $30,000 NM
Failure to equip a pipe with remotely activated or readily accessible valves 2.2(a)3i $4,000 $8,000 $20,000 NM
Impairing secondary containment 2.2(a)3ii $10,000 $20,000 $50,000 NM
Improper design of heating coil system 2.2(c) $4,000 $8,000 $20,000 NM
Failure to equip storage tanks with devices capable of detecting overfills and initiating shutdown mechanisms 2.2(d) $10,000 $20,000 $50,000 NM
Source context and notes 2. The violations of N.J.A.C. 7:1E-2, Prevention and Control of Discharges at Major Facilities, and the civil administrative penalty amounts for each violation set forth in the following table, unless revised pursuant to (d) below: | Category of Offense^{2} | Citation | First Offense | Second Offense | Third or Subsequent Offense | Minor^{3} | Minor Days^{4} | | --- | --- | --- | --- | --- | --- | --- | | No secondary containment for an above- ground storage tank | 2.2(a)1 | $20,000 | $40,000 | $50,000 | NM | | | Failure to surface the base underlying a storage tank with impermeable material | 2.2(a)2 | $10,000 | $20,000 | $30,000 | NM | | | Failure to equip a pipe with remotely activated or readily accessible valves | 2.2(a)3i | $4,000 | $8,000 | $20,000 | NM | | | Impairing secondary containment | 2.2(a)3ii | $10,000 | $20,000 | $50,000 | NM | | | Improper design of heating coil system | 2.2(c) | $4,000 | $8,000 | $20,000 | NM | | | Failure to equip storage tanks with devices capable of detecting overfills and initiating shutdown mechanisms | 2.2(d) | $10,000 | $20,000 | $50,000 | NM | |

4. Table 4

N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 110

Failure to equip storage tanks with a high high liquid level cutoff device 2.2(d)1 $10,000 $20,000 $50,000 NM
Failure to equip storage tanks with direct communication 2.2(d)2 $10,000 $20,000 $50,000 NM
Failure to attend storage tanks of 2,000 gallons or less during filling 2.2(e) $4,000 $8,000 $20,000 NM
Failure to direct overfill or vent lines into appropriate holding areas 2.2(f) $10,000 $20,000 $50,000 NM
Failure to locate mobile or portable storage tanks in areas protected by secondary containment 2.2(g) $20,000 $40,000 $50,000 NM
Source context and notes | Failure to equip storage tanks with a high high liquid level cutoff device | 2.2(d)1 | $10,000 | $20,000 | $50,000 | NM | | --- | --- | --- | --- | --- | --- | | Failure to equip storage tanks with direct communication | 2.2(d)2 | $10,000 | $20,000 | $50,000 | NM | | Failure to attend storage tanks of 2,000 gallons or less during filling | 2.2(e) | $4,000 | $8,000 | $20,000 | NM | | Failure to direct overfill or vent lines into appropriate holding areas | 2.2(f) | $10,000 | $20,000 | $50,000 | NM | | Failure to locate mobile or portable storage tanks in areas protected by secondary containment | 2.2(g) | $20,000 | $40,000 | $50,000 | NM | 110

5. Table 5

N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 111

Failure to equip tote, drum, bag, or other storage areas with secondary containment 2.2(h) $20,000 $40,000 $50,000 NM
Failure to equip a tank car or tank truck loading/unloading area with secondary containment 2.3(a) $20,000 $40,000 $50,000 NM
Failure to inspect the lowermost drain and all outlets of a tank car or tank truck prior to filling 2.3(c) $2,000 $4,000 $10,000 NM
Failure to examine for leakage and secure valves on all manifolds of a tank car or tank truck prior to departure 2.3(d) $2,000 $4,000 $10,000 NM
Failure to utilize a system to prevent premature departure 2.3(e) $5,000 $10,000 $25,000 NM
Failure to attend a tank car 2.3(f) $10,000 $20,000 $50,000 NM
Failure to attend a tank truck 2.3(g) $5,000 $10,000 $25,000 NM
Failure to properly mark in-facility pipes 2.4(a) $10,000 $20,000 $50,000 M
Source context and notes | Failure to equip tote, drum, bag, or other storage areas with secondary containment | 2.2(h) | $20,000 | $40,000 | $50,000 | NM | | --- | --- | --- | --- | --- | --- | | Failure to equip a tank car or tank truck loading/unloading area with secondary containment | 2.3(a) | $20,000 | $40,000 | $50,000 | NM | | Failure to inspect the lowermost drain and all outlets of a tank car or tank truck prior to filling | 2.3(c) | $2,000 | $4,000 | $10,000 | NM | | Failure to examine for leakage and secure valves on all manifolds of a tank car or tank truck prior to departure | 2.3(d) | $2,000 | $4,000 | $10,000 | NM | | Failure to utilize a system to prevent premature departure | 2.3(e) | $5,000 | $10,000 | $25,000 | NM | | Failure to attend a tank car | 2.3(f) | $10,000 | $20,000 | $50,000 | NM | | Failure to attend a tank truck | 2.3(g) | $5,000 | $10,000 | $25,000 | NM | | Failure to properly mark in-facility pipes | 2.4(a) | $10,000 | $20,000 | $50,000 | M |

6. Table 6

N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 112

Failure to have double walls or secondary containment and a leak detection device for new buried in-facility pipes 2.4(b) $10,000 $20,000 $50,000 NM
Failure to equip existing in-facility buried pipe with leak detection devices 2.4(c)1 $10,000 $20,000 $50,000 NM
Failure to implement a maintenance and repair program for existing in-facility buried pipes 2.4(c)2 $10,000 $20,000 $50,000 NM
Failure to make necessary repairs, upgrades, or replacements to exposed in-facility pipe 2.4(d) $20,000 $40,000 $50,000 NM
Failure to cap, blank-flange, or physically remove out-of-service in-facility pipe 2.4(e) $20,000 $40,000 $50,000 NM
Improper design of pipe supports 2.4(f) $4,000 $8,000 $20,000 M
Source context and notes | Failure to have double walls or secondary containment and a leak detection device for new buried in-facility pipes | 2.4(b) | $10,000 | $20,000 | $50,000 | NM | | --- | --- | --- | --- | --- | --- | | Failure to equip existing in-facility buried pipe with leak detection devices | 2.4(c)1 | $10,000 | $20,000 | $50,000 | NM | | Failure to implement a maintenance and repair program for existing in-facility buried pipes | 2.4(c)2 | $10,000 | $20,000 | $50,000 | NM | | Failure to make necessary repairs, upgrades, or replacements to exposed in-facility pipe | 2.4(d) | $20,000 | $40,000 | $50,000 | NM | | Failure to cap, blank-flange, or physically remove out-of-service in-facility pipe | 2.4(e) | $20,000 | $40,000 | $50,000 | NM | | Improper design of pipe supports | 2.4(f) | $4,000 | $8,000 | $20,000 | M |

7. Table 7

N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 113

Failure to minimize the chance of vehicular collision with in-facility pipe 2.4(g) $4,000 $8,000 $20,000 NM
Failure to provide secondary containment for process areas 2.5(a) $20,000 $40,000 $50,000 NM
Failure to provide for a hazardous substance which drained into process wastewater lines 2.5(b) $4,000 $8,000 $20,000 NM
Leaks are not prevented from becoming discharges 2.6(a) $10,000 $20,000 $50,000 NM
Secondary containment does not block all probable discharge routes 2.6(c)1 $10,000 $20,000 $50,000 NM
Secondary containment does not allow for six inches of rainwater 2.6(c)2 $10,000 $20,000 $50,000 NM
Secondary containment for storage area has insufficient capacity 2.6(c)2i $10,000 $20,000 $50,000 NM
Source context and notes | Failure to minimize the chance of vehicular collision with in-facility pipe | 2.4(g) | $4,000 | $8,000 | $20,000 | NM | | --- | --- | --- | --- | --- | --- | | Failure to provide secondary containment for process areas | 2.5(a) | $20,000 | $40,000 | $50,000 | NM | | Failure to provide for a hazardous substance which drained into process wastewater lines | 2.5(b) | $4,000 | $8,000 | $20,000 | NM | | Leaks are not prevented from becoming discharges | 2.6(a) | $10,000 | $20,000 | $50,000 | NM | | Secondary containment does not block all probable discharge routes | 2.6(c)1 | $10,000 | $20,000 | $50,000 | NM | | Secondary containment does not allow for six inches of rainwater | 2.6(c)2 | $10,000 | $20,000 | $50,000 | NM | | Secondary containment for storage area has insufficient capacity | 2.6(c)2i | $10,000 | $20,000 | $50,000 | NM | 113

8. Table 8

N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 114

Secondary containment for loading/unloading area has insufficient capacity 2.6(c)2ii $10,000 $20,000 $50,000 NM
Secondary containment for buried pipes has insufficient capacity 2.6(c)2iii $10,000 $20,000 $50,000 NM
Secondary containment for process area has insufficient capacity 2.6(c)2iv $10,000 $20,000 $50,000 NM
Secondary containment is not impermeable 2.6(c)3 $10,000 $20,000 $50,000 NM
Hazardous substances can escape to the environment 2.6(c)4 $10,000 $20,000 $50,000 NM
Diversion system cannot handle flow rate 2.6(c)5 $10,000 $20,000 $50,000 NM
Incompatible materials stored in the same secondary containment 2.6(c)6 $10,000 $20,000 $50,000 NM
Secondary containment capacity impaired 2.6(c)7 $10,000 $20,000 $50,000 NM
Source context and notes | Secondary containment for loading/unloading area has insufficient capacity | 2.6(c)2ii | $10,000 | $20,000 | $50,000 | NM | | --- | --- | --- | --- | --- | --- | | Secondary containment for buried pipes has insufficient capacity | 2.6(c)2iii | $10,000 | $20,000 | $50,000 | NM | | Secondary containment for process area has insufficient capacity | 2.6(c)2iv | $10,000 | $20,000 | $50,000 | NM | | Secondary containment is not impermeable | 2.6(c)3 | $10,000 | $20,000 | $50,000 | NM | | Hazardous substances can escape to the environment | 2.6(c)4 | $10,000 | $20,000 | $50,000 | NM | | Diversion system cannot handle flow rate | 2.6(c)5 | $10,000 | $20,000 | $50,000 | NM | | Incompatible materials stored in the same secondary containment | 2.6(c)6 | $10,000 | $20,000 | $50,000 | NM | | Secondary containment capacity impaired | 2.6(c)7 | $10,000 | $20,000 | $50,000 | NM | 114

9. Table 9

N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 115

Failure to maintain adequate length of containment devices 2.7(b) $20,000 $40,000 $50,000 NM
Failure to deploy a containment device when required 2.7(c) $20,000 $40,000 $50,000 NM
Failure to maintain a containment device on standby when required 2.7(d) $20,000 $40,000 $50,000 NM
Failure to properly deploy a containment device 2.7(e) $10,000 $20,000 $50,000 NM
Failure to properly deploy a containment device 2.7(f) $10,000 $20,000 $50,000 NM
Commencement or continuation of transfer operations during storm 2.7(g)1 $30,000 $50,000 $50,000 NM
Commencement or continuation of transfer operations during fires 2.7(g)2 $30,000 $50,000 $50,000 NM
Commencement or continuation of transfer 2.7(g)3 $30,000 $50,000 $50,000 NM
Source context and notes | Failure to maintain adequate length of containment devices | 2.7(b) | $20,000 | $40,000 | $50,000 | NM | | --- | --- | --- | --- | --- | --- | | Failure to deploy a containment device when required | 2.7(c) | $20,000 | $40,000 | $50,000 | NM | | Failure to maintain a containment device on standby when required | 2.7(d) | $20,000 | $40,000 | $50,000 | NM | | Failure to properly deploy a containment device | 2.7(e) | $10,000 | $20,000 | $50,000 | NM | | Failure to properly deploy a containment device | 2.7(f) | $10,000 | $20,000 | $50,000 | NM | | Commencement or continuation of transfer operations during storm | 2.7(g)1 | $30,000 | $50,000 | $50,000 | NM | | Commencement or continuation of transfer operations during fires | 2.7(g)2 | $30,000 | $50,000 | $50,000 | NM | | Commencement or continuation of transfer | 2.7(g)3 | $30,000 | $50,000 | $50,000 | NM | 115

10. Table 10

N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 116

Commencement or continuation of transfer operations during transfer system break 2.7(g)4 $30,000 $50,000 $50,000 NM
Commencement or continuation of transfer operations when there is an apparent discrepancy 2.7(g)5 $30,000 $50,000 $50,000 NM
Commencement or continuation of transfer operations during communications breakdown 2.7(g)6 $30,000 $50,000 $50,000 NM
Commencement or continuation of transfer operations when hazardous substances are observed in the water 2.7(g)7 $30,000 $50,000 $50,000 NM
Commencement or continuation of transfer operations during a discharge 2.7(g)8 $30,000 $50,000 $50,000 NM
Source context and notes operations during transfer system malfunction | Commencement or continuation of transfer operations during transfer system break | 2.7(g)4 | $30,000 | $50,000 | $50,000 | NM | | --- | --- | --- | --- | --- | --- | | Commencement or continuation of transfer operations when there is an apparent discrepancy | 2.7(g)5 | $30,000 | $50,000 | $50,000 | NM | | Commencement or continuation of transfer operations during communications breakdown | 2.7(g)6 | $30,000 | $50,000 | $50,000 | NM | | Commencement or continuation of transfer operations when hazardous substances are observed in the water | 2.7(g)7 | $30,000 | $50,000 | $50,000 | NM | | Commencement or continuation of transfer operations during a discharge | 2.7(g)8 | $30,000 | $50,000 | $50,000 | NM |

11. Table 11

N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 117

Failure to properly clean up or remove a discharge prior to removing a containment device 2.7(h) $40,000 $50,000 $50,000 NM
Failure to secure or retrieve a containment device 2.7(i) $10,000 $20,000 $50,000 M 30
Failure to clean or dispose of a containment device that is contaminated 2.7(i) $10,000 $20,000 $50,000 NM
Failure to prominently display notification requirements 2.7(j) $1,000 $2,000 $5,000 M 30
Improper or inadequate illumination of facility transfer connection points 2.8(a)1 $10,000 $20,000 $50,000 NM
Improper or inadequate illumination of vessel transfer connection points 2.8(a)2 $10,000 $20,000 $50,000 NM
Improper or inadequate illumination of facility work areas 2.8(a)3 $10,000 $20,000 $50,000 NM
Source context and notes | Failure to properly clean up or remove a discharge prior to removing a containment device | 2.7(h) | $40,000 | $50,000 | $50,000 | NM | | | --- | --- | --- | --- | --- | --- | --- | | Failure to secure or retrieve a containment device | 2.7(i) | $10,000 | $20,000 | $50,000 | M | 30 | | Failure to clean or dispose of a containment device that is contaminated | 2.7(i) | $10,000 | $20,000 | $50,000 | NM | | | Failure to prominently display notification requirements | 2.7(j) | $1,000 | $2,000 | $5,000 | M | 30 | | Improper or inadequate illumination of facility transfer connection points | 2.8(a)1 | $10,000 | $20,000 | $50,000 | NM | | | Improper or inadequate illumination of vessel transfer connection points | 2.8(a)2 | $10,000 | $20,000 | $50,000 | NM | | | Improper or inadequate illumination of facility work areas | 2.8(a)3 | $10,000 | $20,000 | $50,000 | NM | | 117

12. Table 12

N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 118

Improper or inadequate illumination of vessel work areas 2.8(a)4 $10,000 $20,000 $50,000 NM
Improper or inadequate illumination of water surface areas 2.8(b) $10,000 $20,000 $50,000 NM
Failure to protect a hazardous substance from being carried off or discharged into flood waters 2.9(a),(b) $20,000 $40,000 $50,000 NM
Failure to conduct visual inspections of marine transfer areas 2.10(a)1 $4,000 $8,000 $20,000 NM
Failure to conduct visual inspections of secondary containment that is not impermeable 2.10(a)2 $4,000 $8,000 $20,000 NM
Failure to conduct visual inspections of loading or unloading areas 2.10(a)3 $4,000 $8,000 $20,000 NM
Failure to conduct visual inspections of process areas 2.10(a)4 $4,000 $8,000 $20,000 NM
Source context and notes | Improper or inadequate illumination of vessel work areas | 2.8(a)4 | $10,000 | $20,000 | $50,000 | NM | | --- | --- | --- | --- | --- | --- | | Improper or inadequate illumination of water surface areas | 2.8(b) | $10,000 | $20,000 | $50,000 | NM | | Failure to protect a hazardous substance from being carried off or discharged into flood waters | 2.9(a),(b) | $20,000 | $40,000 | $50,000 | NM | | Failure to conduct visual inspections of marine transfer areas | 2.10(a)1 | $4,000 | $8,000 | $20,000 | NM | | Failure to conduct visual inspections of secondary containment that is not impermeable | 2.10(a)2 | $4,000 | $8,000 | $20,000 | NM | | Failure to conduct visual inspections of loading or unloading areas | 2.10(a)3 | $4,000 | $8,000 | $20,000 | NM | | Failure to conduct visual inspections of process areas | 2.10(a)4 | $4,000 | $8,000 | $20,000 | NM | 118

13. Table 13

N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 119

Failure to conduct visual inspections of storage areas and pipes 2.10(a)5 $4,000 $8,000 $20,000 NM
Failure to conduct visual inspections of equipment 2.10(a)6i $4,000 $8,000 $20,000 NM
Failure to conduct visual inspections of fences and locks 2.10(a)6ii $4,000 $8,000 $20,000 NM
Failure to conduct visual inspections of cleanup and removal equipment and supplies 2.10(a)6iii $4,000 $8,000 $20,000 NM
Failure to keep documentation of visual inspections 2.10(b) $1,000 $2,000 $5,000 NM
Failure to keep hazardous substances in suitable containers or protect them from the elements and the possibility of leakage 2.11(a) $20,000 $40,000 $50,000 NM
Failure to repair, replace or take out of service any leaking equipment 2.11(b) 10,000 $20,000 $50,000 NM
Source context and notes | Failure to conduct visual inspections of storage areas and pipes | 2.10(a)5 | $4,000 | $8,000 | $20,000 | NM | | --- | --- | --- | --- | --- | --- | | Failure to conduct visual inspections of equipment | 2.10(a)6i | $4,000 | $8,000 | $20,000 | NM | | Failure to conduct visual inspections of fences and locks | 2.10(a)6ii | $4,000 | $8,000 | $20,000 | NM | | Failure to conduct visual inspections of cleanup and removal equipment and supplies | 2.10(a)6iii | $4,000 | $8,000 | $20,000 | NM | | Failure to keep documentation of visual inspections | 2.10(b) | $1,000 | $2,000 | $5,000 | NM | | Failure to keep hazardous substances in suitable containers or protect them from the elements and the possibility of leakage | 2.11(a) | $20,000 | $40,000 | $50,000 | NM | | Failure to repair, replace or take out of service any leaking equipment | 2.11(b) | 10,000 | $20,000 | $50,000 | NM | 119

14. Table 14

N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 120

Failure to clean up a leak of a hazardous substance 2.11(c) $10,000 $20,000 $50,000 NM
Failure to have adequate quantities of cleanup materials on hand 2.11(d) $4,000 $8,000 $20,000 NM
Failure to maintain a supply of safety equipment 2.11(e) $4,000 $8,000 $20,000 NM
Failure to maintain secondary containment or diversion system free of debris 2.11(f) $10,000 $20,000 $50,000 NM
Failure to implement a training program 2.12(a) $20,000 $40,000 $50,000 NM
Failure to provide written job descriptions 2.12(b)1 $4,000 $8,000 $20,000 M
Failure to provide minimum training consisting of time periods for training 2.12(b)2 $4,000 $8,000 $20,000 M
Source context and notes | Failure to clean up a leak of a hazardous substance | 2.11(c) | $10,000 | $20,000 | $50,000 | NM | | --- | --- | --- | --- | --- | --- | | Failure to have adequate quantities of cleanup materials on hand | 2.11(d) | $4,000 | $8,000 | $20,000 | NM | | Failure to maintain a supply of safety equipment | 2.11(e) | $4,000 | $8,000 | $20,000 | NM | | Failure to maintain secondary containment or diversion system free of debris | 2.11(f) | $10,000 | $20,000 | $50,000 | NM | | Failure to implement a training program | 2.12(a) | $20,000 | $40,000 | $50,000 | NM | | Failure to provide written job descriptions | 2.12(b)1 | $4,000 | $8,000 | $20,000 | M | | Failure to provide minimum training consisting of time periods for training | 2.12(b)2 | $4,000 | $8,000 | $20,000 | M | 120

15. Table 15

N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 121

Failure to provide procedures to determine ability 2.12(b)3 $4,000 $8,000 $20,000 M 30
Failure to provide training consisting of general orientation and initial training 2.12(c)1 $4,000 $8,000 $20,000 NM
Failure to provide job-specific training on SOPs 2.12(c)2i $4,000 $8,000 $20,000 NM
Failure to provide training on cleanup and removal 2.12(c)2ii $4,000 $8,000 $20,000 NM
Failure to provide training on fires, leaks, and discharges 2.12(c)2iii $4,000 $8,000 $20,000 NM
Failure to provide training on equipment familiarization 2.12(c)2iv $4,000 $8,000 $20,000 NM
Failure to provide training on new or updated SOPs 2.12(c)3 $4,000 $8,000 $20,000 NM
Failure to provide refresher training 2.12(c)4 $4,000 $8,000 $20,000 NM
Penalty assessed on a per calendar year basis
Source context and notes | Failure to provide procedures to determine ability | 2.12(b)3 | $4,000 | $8,000 | $20,000 | M | 30 | | --- | --- | --- | --- | --- | --- | --- | | Failure to provide training consisting of general orientation and initial training | 2.12(c)1 | $4,000 | $8,000 | $20,000 | NM | | | Failure to provide job-specific training on SOPs | 2.12(c)2i | $4,000 | $8,000 | $20,000 | NM | | | Failure to provide training on cleanup and removal | 2.12(c)2ii | $4,000 | $8,000 | $20,000 | NM | | | Failure to provide training on fires, leaks, and discharges | 2.12(c)2iii | $4,000 | $8,000 | $20,000 | NM | | | Failure to provide training on equipment familiarization | 2.12(c)2iv | $4,000 | $8,000 | $20,000 | NM | | | Failure to provide training on new or updated SOPs | 2.12(c)3 | $4,000 | $8,000 | $20,000 | NM | | | Failure to provide refresher training | 2.12(c)4 | $4,000 | $8,000 | $20,000 | NM | | | | | | Penalty assessed on a per calendar year basis | | | |

16. Table 16

N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 122

Failure to specify
qualifications of trainers
2.12(d) $4,000 $8,000 $20,000 M 30
Failure to document training of
personnel, subjects covered,
and training dates
2.12(e) $1,000 $2,000 $5,000 NM
Failure to have procedures to
ensure training of employees
of outside contractors
2.12(f) $2,000 $4,000 $10,000 NM
Failure to provide adequate
lighting
2.13(a) $10,000 $20,000 $50,000 NM
Failure to provide adequate
security or to follow security
procedures
2.13(b) $10,000 $20,000 $50,000 NM
Failure to establish standard
operating procedures (SOPs)
2.14(a) $4,000 $8,000 $20,000 NM
Failure have SOPs in all
appropriate languages
2.14(a) $1,000 $2,000 $5,000 M 30
Failure to make copies of the
SOPs readily available
2.14(b) $1,000 $2,000 $5,000 M 30
Source context and notes | Failure to specify
qualifications of trainers | 2.12(d) | $4,000 | $8,000 | $20,000 | M | 30 | | --- | --- | --- | --- | --- | --- | --- | | Failure to document training of
personnel, subjects covered,
and training dates | 2.12(e) | $1,000 | $2,000 | $5,000 | NM | | | Failure to have procedures to
ensure training of employees
of outside contractors | 2.12(f) | $2,000 | $4,000 | $10,000 | NM | | | Failure to provide adequate
lighting | 2.13(a) | $10,000 | $20,000 | $50,000 | NM | | | Failure to provide adequate
security or to follow security
procedures | 2.13(b) | $10,000 | $20,000 | $50,000 | NM | | | Failure to establish standard
operating procedures (SOPs) | 2.14(a) | $4,000 | $8,000 | $20,000 | NM | | | Failure have SOPs in all
appropriate languages | 2.14(a) | $1,000 | $2,000 | $5,000 | M | 30 | | Failure to make copies of the
SOPs readily available | 2.14(b) | $1,000 | $2,000 | $5,000 | M | 30 | 122

17. Table 17

N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 123

Failure to make copies of the SDS or fact sheets readily available 2.14(c) $1,000 $2,000 $5,000 M 30
Failure to include a description of the operation in an SOP 2.14(d)1 $1,000 $2,000
Penalty assessed per SOP
$5,000 M 30
Failure to include procedures for visual inspections in an SOP 2.14(d)2 $1,000 $2,000
Penalty assessed per SOP
$5,000 M 30
Failure to include procedures and conditions for normal operation in an SOP 2.14(d)3 $1,000 $2,000
Penalty assessed per SOP
$5,000 M 30
Failure to include a description of equipment or alarms in an SOP 2.14(d)4 $1,000 $2,000
Penalty assessed per SOP
$5,000 M 30
Failure to include a description of leak or discharge conditions in an SOP 2.14(d)5 $1,000 $2,000
Penalty assessed per SOP
$5,000 M 30
Failure to include process flow sheets in an SOP 2.14(e)1 $1,000 $2,000
Penalty assessed per SOP
$5,000 M 30
Source context and notes | Failure to make copies of the SDS or fact sheets readily available | 2.14(c) | $1,000 | $2,000 | $5,000 | M | 30 | | --- | --- | --- | --- | --- | --- | --- | | Failure to include a description of the operation in an SOP | 2.14(d)1 | $1,000 | $2,000
Penalty assessed per SOP | $5,000 | M | 30 | | Failure to include procedures for visual inspections in an SOP | 2.14(d)2 | $1,000 | $2,000
Penalty assessed per SOP | $5,000 | M | 30 | | Failure to include procedures and conditions for normal operation in an SOP | 2.14(d)3 | $1,000 | $2,000
Penalty assessed per SOP | $5,000 | M | 30 | | Failure to include a description of equipment or alarms in an SOP | 2.14(d)4 | $1,000 | $2,000
Penalty assessed per SOP | $5,000 | M | 30 | | Failure to include a description of leak or discharge conditions in an SOP | 2.14(d)5 | $1,000 | $2,000
Penalty assessed per SOP | $5,000 | M | 30 | | Failure to include process flow sheets in an SOP | 2.14(e)1 | $1,000 | $2,000
Penalty assessed per SOP | $5,000 | M | 30 | 123

18. Table 18

N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 124

Failure to include a description of abnormal conditions in an SOP 2.14(e)2 $1,000 $2,000 $5,000 M 30
Penalty assessed per SOP
Failure to include pre-startup procedures in an SOP 2.14(e)3 $1,000 $2,000 $5,000 M 30
Penalty assessed per SOP
Failure to include startup procedures in an SOP 2.14(e)4 $1,000 $2,000 $5,000 M 30
Penalty assessed per SOP
Failure to include shutdown procedures in an SOP 2.14(e)5 $1,000 $2,000 $5,000 M 30
Penalty assessed per SOP
Failure to include procedures on maintenance in an SOP 2.14(e)6 $1,000 $2,000 $5,000 M 30
Penalty assessed per SOP
Failure to include log sheets and checklists in an SOP 2.14(e)7 $1,000 $2,000 $5,000 M 30
Penalty assessed per SOP
Failure to incorporate modifications of procedures into the SOPs prior to implementation 2.14(g) $1,000 $2,000 $5,000 NM
Source context and notes | Failure to include a description of abnormal conditions in an SOP | 2.14(e)2 | $1,000 | $2,000 | $5,000 | M | 30 | | --- | --- | --- | --- | --- | --- | --- | | | | | Penalty assessed per SOP | | | | | Failure to include pre-startup procedures in an SOP | 2.14(e)3 | $1,000 | $2,000 | $5,000 | M | 30 | | | | | Penalty assessed per SOP | | | | | Failure to include startup procedures in an SOP | 2.14(e)4 | $1,000 | $2,000 | $5,000 | M | 30 | | | | | Penalty assessed per SOP | | | | | Failure to include shutdown procedures in an SOP | 2.14(e)5 | $1,000 | $2,000 | $5,000 | M | 30 | | | | | Penalty assessed per SOP | | | | | Failure to include procedures on maintenance in an SOP | 2.14(e)6 | $1,000 | $2,000 | $5,000 | M | 30 | | | | | Penalty assessed per SOP | | | | | Failure to include log sheets and checklists in an SOP | 2.14(e)7 | $1,000 | $2,000 | $5,000 | M | 30 | | | | | Penalty assessed per SOP | | | | | Failure to incorporate modifications of procedures into the SOPs prior to implementation | 2.14(g) | $1,000 | $2,000 | $5,000 | NM | |

19. Table 19

N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 125

Failure to maintain and make available a current index of SOPs 2.14(h) $1,000 $2,000 $5,000 M 30
Failure to maintain required records for three years for the following: 2.15(a)
Employee training 2.15(a)1 $1,000 $2,000 $5,000 NM
Drills for discharge prevention 2.15(a)2 $1,000 $2,000 $5,000 NM
Inspection of cleanup and removal equipment and supplies 2.15(a)3 $1,000 $2,000 $5,000 NM
Facility inventories 2.15(a)4 $1,000 $2,000 $5,000 NM
Failure to maintain required records for 10 years for the following: 2.15(b)
Failure to maintain documentation of discharges 2.15(b)1 $1,000 $2,000 $5,000 NM
Failure to maintain documentation of discharge confirmation reports 2.15(b)2 $1,000 $2,000 $5,000 NM
Source context and notes | Failure to maintain and make available a current index of SOPs | 2.14(h) | $1,000 | $2,000 | $5,000 | M | 30 | | --- | --- | --- | --- | --- | --- | --- | | Failure to maintain required records for three years for the following: | 2.15(a) | | | | | | | Employee training | 2.15(a)1 | $1,000 | $2,000 | $5,000 | NM | | | Drills for discharge prevention | 2.15(a)2 | $1,000 | $2,000 | $5,000 | NM | | | Inspection of cleanup and removal equipment and supplies | 2.15(a)3 | $1,000 | $2,000 | $5,000 | NM | | | Facility inventories | 2.15(a)4 | $1,000 | $2,000 | $5,000 | NM | | | Failure to maintain required records for 10 years for the following: | 2.15(b) | | | | | | | Failure to maintain documentation of discharges | 2.15(b)1 | $1,000 | $2,000 | $5,000 | NM | | | Failure to maintain documentation of discharge confirmation reports | 2.15(b)2 | $1,000 | $2,000 | $5,000 | NM | |

20. Table 20

N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 126

Failure to maintain required records for 10 years or the life of the equipment 2.15(c) $1,000 $2,000 $5,000 NM
Failure to maintain required records 2.15(d)
Failure to maintain for daily visual inspections for 10 years or the life of the tank 2.15(d)1 $1,000 $2,000 $5,000 NM
Penalty assessed on a per tank basis
Failure to maintain for monthly inspections for 10 years or the life of the tank 2.15(d)2 $1,000 $2,000 $5,000 NM
Penalty assessed on a per tank basis
Failure to maintain for all other integrity testing, inspection, and repair for the life of the tank 2.15(d)3 $1,000 $2,000 $5,000 NM
Penalty assessed on a per tank basis
Failure to make required records available for inspection 2.15(e) $1,000 $2,000 $5,000 M
30
Failure to ensure records can be retrieved in event of loss or destruction 2.15(f) $2,000 $4,000 $10,000 NM
Source context and notes | Failure to maintain required records for 10 years or the life of the equipment | 2.15(c) | $1,000 | $2,000 | $5,000 | NM | | --- | --- | --- | --- | --- | --- | | Failure to maintain required records | 2.15(d) | | | | | | Failure to maintain for daily visual inspections for 10 years or the life of the tank | 2.15(d)1 | $1,000 | $2,000 | $5,000 | NM | | | | | Penalty assessed on a per tank basis | | | | Failure to maintain for monthly inspections for 10 years or the life of the tank | 2.15(d)2 | $1,000 | $2,000 | $5,000 | NM | | | | | Penalty assessed on a per tank basis | | | | Failure to maintain for all other integrity testing, inspection, and repair for the life of the tank | 2.15(d)3 | $1,000 | $2,000 | $5,000 | NM | | | | | Penalty assessed on a per tank basis | | | | Failure to make required records available for inspection | 2.15(e) | $1,000 | $2,000 | $5,000 | M | | | | | | | 30 | | Failure to ensure records can be retrieved in event of loss or destruction | 2.15(f) | $2,000 | $4,000 | $10,000 | NM |

21. Table 21

N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 127

Failure to perform initial integrity testing on a new tank 2.16(b) Penalty assessed on a per tank basis NM
SIZE OF TANK (gallons)
2,001-10,000 $500 $1,000 $2,500
10,001-20,000 $1,000 $2,000 $5,000
20,001-50,000 $2,500 $5,000 $12,500
50,001-100,000 $5,000 $10,000 $25,000
100,001-200,000 $10,000 $20,000 $50,000
200,001-300,000 $15,000 $30,000 $50,000
300,001 and greater $20,000 $40,000 $50,000
Failure to follow API 653 for field-erected tank 2.16(d)1 $ 2,000 $ 4,000 $10,000 NM
The above penalties shall apply for other requirements of the API 653 not otherwise specified below. Penalty assessed on a per tank and per testing/inspection component basis, as listed:
Monthly periodic inspection $ 1,000 $ 2,000 $ 4,000 NM
Formal external inspection $ 2,000 $ 4,000 $10,000 NM
Source context and notes | Failure to perform initial integrity testing on a new tank | 2.16(b) | | Penalty assessed on a per tank basis | | NM | | --- | --- | --- | --- | --- | --- | | SIZE OF TANK (gallons) | | | | | | | 2,001-10,000 | | $500 | $1,000 | $2,500 | | | 10,001-20,000 | | $1,000 | $2,000 | $5,000 | | | 20,001-50,000 | | $2,500 | $5,000 | $12,500 | | | 50,001-100,000 | | $5,000 | $10,000 | $25,000 | | | 100,001-200,000 | | $10,000 | $20,000 | $50,000 | | | 200,001-300,000 | | $15,000 | $30,000 | $50,000 | | | 300,001 and greater | | $20,000 | $40,000 | $50,000 | | | Failure to follow API 653 for field-erected tank | 2.16(d)1 | $ 2,000 | $ 4,000 | $10,000 | NM | | | | The above penalties shall apply for other requirements of the API 653 not otherwise specified below. Penalty assessed on a per tank and per testing/inspection component basis, as listed: | | | | | Monthly periodic inspection | | $ 1,000 | $ 2,000 | $ 4,000 | NM | | Formal external inspection | | $ 2,000 | $ 4,000 | $10,000 | NM | 127

22. Table 22

N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 128

Ultrasonic thickness testing $ 2,000 $ 4,000 $10,000 NM
Formal internal inspection $ 4,000 $ 8,000 $20,000 NM
Failure to follow API 510 or ASME Section VIII for field-erected tank 2.16(d)2 $ 2,000 $ 4,000 $10,000 NM
The above penalties shall apply for other requirements of the API 510 or ASME Section VIII not otherwise specified below. Penalty assessed on a per tank and per testing/inspection component basis, as listed:
Formal external inspection $2,000 $4,000 $10,000 NM
Formal internal or on-stream inspection $4,000 $8,000 $20,000 NM
Failure to follow API 653 or SP001 for shop-built tank 2.16(e)1 $ 1,000 $ 2,000 $ 5,000 NM
The above penalties shall apply for other requirements of the API 653 or SP001 not otherwise specified below. Penalty assessed on a per tank and per testing/inspection component basis, as listed:
API 653:
Monthly periodic inspection $ 1,000 $ 2,000 $ 4,000 NM
Source context and notes | Ultrasonic thickness testing | | $ 2,000 | $ 4,000 | $10,000 | NM | | --- | --- | --- | --- | --- | --- | | Formal internal inspection | | $ 4,000 | $ 8,000 | $20,000 | NM | | Failure to follow API 510 or ASME Section VIII for field-erected tank | 2.16(d)2 | $ 2,000 | $ 4,000 | $10,000 | NM | | | | The above penalties shall apply for other requirements of the API 510 or ASME Section VIII not otherwise specified below. Penalty assessed on a per tank and per testing/inspection component basis, as listed: | | | | | Formal external inspection | | $2,000 | $4,000 | $10,000 | NM | | Formal internal or on-stream inspection | | $4,000 | $8,000 | $20,000 | NM | | Failure to follow API 653 or SP001 for shop-built tank | 2.16(e)1 | $ 1,000 | $ 2,000 | $ 5,000 | NM | | | | The above penalties shall apply for other requirements of the API 653 or SP001 not otherwise specified below. Penalty assessed on a per tank and per testing/inspection component basis, as listed: | | | | | API 653: | | | | | | | Monthly periodic inspection | | $ 1,000 | $ 2,000 | $ 4,000 | NM |

23. Table 23

N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 129

Formal external inspection $ 2,000 $ 4,000 $10,000 NM
Ultrasonic thickness testing $ 2,000 $ 4,000 $10,000 NM
Formal internal inspection $ 4,000 $ 8,000 $20,000 NM
SP001: (All Categories)
AST record $ 1,000 $ 2,000 $ 4,000 NM
Periodic (Monthly and Annual Inspections) $ 1,000 $ 2,000 $ 4,000 NM
Formal external inspection $ 2,000 $ 4,000 $10,000 NM
Leak test $ 2,000 $ 4,000 $10,000 NM
Formal internal inspection $ 4,000 $ 8,000 $20,000 NM
Failure to follow API 510 or ASME VIII for shop-built tank 2.16(e)2 $ 2,000 $ 4,000 NM
The above penalties shall apply for other requirements of the API 510 or ASME VIII not otherwise specified below. Penalty assessed on a per tank and per testing/inspection component basis, as listed:
Formal external inspection $ 2,000 $ 4,000 $10,000 NM
Source context and notes | Formal external inspection | $ 2,000 | $ 4,000 | $10,000 | NM | | --- | --- | --- | --- | --- | | Ultrasonic thickness testing | $ 2,000 | $ 4,000 | $10,000 | NM | | Formal internal inspection | $ 4,000 | $ 8,000 | $20,000 | NM | | SP001: (All Categories) | | | | | | AST record | $ 1,000 | $ 2,000 | $ 4,000 | NM | | Periodic (Monthly and Annual Inspections) | $ 1,000 | $ 2,000 | $ 4,000 | NM | | Formal external inspection | $ 2,000 | $ 4,000 | $10,000 | NM | | Leak test | $ 2,000 | $ 4,000 | $10,000 | NM | | Formal internal inspection | $ 4,000 | $ 8,000 | $20,000 | NM | | Failure to follow API 510 or ASME VIII for shop-built tank | 2.16(e)2 | $ 2,000 | $ 4,000 | NM | | | | The above penalties shall apply for other requirements of the API 510 or ASME VIII not otherwise specified below. Penalty assessed on a per tank and per testing/inspection component basis, as listed: | | | | Formal external inspection | $ 2,000 | $ 4,000 | $10,000 | NM | 129

24. Table 24

N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 130

Formal internal or on-stream inspection $ 4,000 $ 8,000 $20,000 NM
Failure to follow established protocol for FRP tanks 2.16(f)
Penalty assessed on a per tank and per testing/inspection component basis, as listed:
Formal external inspection $2,000 $4,000 $10,000 NM
Acoustic Emission Testing (ASTM E1067) $2,000 $4,000 $10,000 NM
Formal internal inspection $2,000 $4,000 $10,000 NM
Failure to follow established protocol 2.16(g)
Penalty assessed on a per tank and per testing/inspection component basis, as listed:
Formal external inspection $ 2,000 $ 4,000 $10,000 NM
Formal internal inspection $ 2,000 $ 4,000 $10,000 NM
Failure to follow established protocol 2.16(h)
Source context and notes | Formal internal or on-stream inspection | | $ 4,000 | $ 8,000 | $20,000 | NM | | --- | --- | --- | --- | --- | --- | | Failure to follow established protocol for FRP tanks | 2.16(f) | | | | | | | | Penalty assessed on a per tank and per testing/inspection component basis, as listed: | | | | | Formal external inspection | | $2,000 | $4,000 | $10,000 | NM | | Acoustic Emission Testing (ASTM E1067) | | $2,000 | $4,000 | $10,000 | NM | | Formal internal inspection | | $2,000 | $4,000 | $10,000 | NM | | Failure to follow established protocol | 2.16(g) | | | | | | | | Penalty assessed on a per tank and per testing/inspection component basis, as listed: | | | | | Formal external inspection | | $ 2,000 | $ 4,000 | $10,000 | NM | | Formal internal inspection | | $ 2,000 | $ 4,000 | $10,000 | NM | | Failure to follow established protocol | 2.16(h) | | | | | 130

25. Table 25

N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 131

Penalty assessed on a per tank and per testing/inspection component basis, as listed:
Shell thickness test 2.16(h)1 $ 2,000 $ 4,000 $10,000 NM
Bottom thickness test 2.16(h)2 $ 2,000 $ 4,000 $10,000 NM
External visual inspection of tank 2.16(h)3 $ 1,000 $ 2,000 $5,000 NM
Internal visual inspection of tank 2.16(h)4 $ 2,000 $ 4,000 $10,000 NM
External visual inspection of foundation and ancillary equipment 2.16(h)5 $ 1,000 $ 2,000 $ 5,000 NM
Failure to follow approved alternative protocol 2.16(i) $4,000 $8,000 $20,000 NM
Penalty assessed on a per tank and per testing/inspection component basis
Failure to take tank out of service following a failed integrity test or inspection 2.16(j) $20,000 $40,000 $50,000 NM
Failure to meet minimum reporting standard 2.16(k) $ 1,000 $ 2,000 $ 5,000 M
Source context and notes | | | Penalty assessed on a per tank and per testing/inspection component basis, as listed: | | | | | --- | --- | --- | --- | --- | --- | | Shell thickness test | 2.16(h)1 | $ 2,000 | $ 4,000 | $10,000 | NM | | Bottom thickness test | 2.16(h)2 | $ 2,000 | $ 4,000 | $10,000 | NM | | External visual inspection of tank | 2.16(h)3 | $ 1,000 | $ 2,000 | $5,000 | NM | | Internal visual inspection of tank | 2.16(h)4 | $ 2,000 | $ 4,000 | $10,000 | NM | | External visual inspection of foundation and ancillary equipment | 2.16(h)5 | $ 1,000 | $ 2,000 | $ 5,000 | NM | | Failure to follow approved alternative protocol | 2.16(i) | $4,000 | $8,000 | $20,000 | NM | | | | Penalty assessed on a per tank and per testing/inspection component basis | | | | | Failure to take tank out of service following a failed integrity test or inspection | 2.16(j) | $20,000 | $40,000 | $50,000 | NM | | Failure to meet minimum reporting standard | 2.16(k) | $ 1,000 | $ 2,000 | $ 5,000 | M |

26. Table 26

N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 132

Failure to prepare repair schedule 2.16(l) $ 5,000 $10,000 $25,000 NM
Penalty assessed on a per tank basis
Failure to implement the repair schedule 2.16(l) $ 5,000 $10,000 $25,000 NM
Penalty assessed on a per tank basis
Failure to document disposition of all recommended repairs and monitoring, including reasons for recommended actions that are delayed or deemed unnecessary 2.16(l) $ 1,000 $ 2,000 $ 5,000 M 30
Penalty assessed on a per tank basis
Source context and notes | Failure to prepare repair schedule | 2.16(l) | $ 5,000 | $10,000 | $25,000 | NM | | --- | --- | --- | --- | --- | --- | | | | | Penalty assessed on a per tank basis | | | | Failure to implement the repair schedule | 2.16(l) | $ 5,000 | $10,000 | $25,000 | NM | | | | | Penalty assessed on a per tank basis | | | | Failure to document disposition of all recommended repairs and monitoring, including reasons for recommended actions that are delayed or deemed unnecessary | 2.16(l) | $ 1,000 | $ 2,000 | $ 5,000 | M 30 | | | | | Penalty assessed on a per tank basis | | | 3. The violations of N.J.A.C 7:1E-3, Transmission Pipelines, and the civil administrative penalty amounts for each violation, are as set forth in the following table, unless modified pursuant to (d) below: | Failure to register | 3.2(a) | $2,000 | $4,000 | $10,000 | NM | | --- | --- | --- | --- | --- | --- | | Failure to include owner/operator information in a registration | 3.2(a)1 | $500 | $1,000 | $2,500 | M 30 | | Failure to include name and contact information in a registration | 3.2(a)2 | $500 | $1,000 | $2,500 | M 30 | 132

27. Table 27

N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 132

Failure to register 3.2(a) $2,000 $4,000 $10,000 NM
Failure to include owner/operator information in a registration 3.2(a)1 $500 $1,000 $2,500 M 30
Failure to include name and contact information in a registration 3.2(a)2 $500 $1,000 $2,500 M 30
Source context and notes | | | | Penalty assessed on a per tank basis | | | | Failure to implement the repair schedule | 2.16(l) | $ 5,000 | $10,000 | $25,000 | NM | | | | | Penalty assessed on a per tank basis | | | | Failure to document disposition of all recommended repairs and monitoring, including reasons for recommended actions that are delayed or deemed unnecessary | 2.16(l) | $ 1,000 | $ 2,000 | $ 5,000 | M 30 | | | | | Penalty assessed on a per tank basis | | | 3. The violations of N.J.A.C 7:1E-3, Transmission Pipelines, and the civil administrative penalty amounts for each violation, are as set forth in the following table, unless modified pursuant to (d) below: | Failure to register | 3.2(a) | $2,000 | $4,000 | $10,000 | NM | | --- | --- | --- | --- | --- | --- | | Failure to include owner/operator information in a registration | 3.2(a)1 | $500 | $1,000 | $2,500 | M 30 | | Failure to include name and contact information in a registration | 3.2(a)2 | $500 | $1,000 | $2,500 | M 30 | 132

28. Table 28

N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 133

Failure to include registered agent information in a registration 3.2(a)3 $500 $1,000 $2,500 M 30
Failure to include storage capacity and location in a registration 3.2(a)4 $500 $1,000 $2,500 M 30
Failure to include a description of hazardous substances in a registration 3.2(a)5 $500 $1,000 $2,500 M 30
Failure to include facilities served by the pipeline in a registration 3.2(a)6 $500 $1,000 $2,500 M 30
Failure to include transfer capacity and average daily throughput in a registration 3.2(a)7 $500 $1,000 $2,500 M 30
Failure to include maps in a registration 3.2(a)8 $500 $1,000 $2,500 M 30
Failure to include a pipe inventory in a registration 3.2(a)9 $500 $1,000 $2,500 M 30
Failure to include a certification in a registration 3.2(a)10 $500 $1,000 $2,500 M 30
Source context and notes | Failure to include registered agent information in a registration | 3.2(a)3 | $500 | $1,000 | $2,500 | M | 30 | | --- | --- | --- | --- | --- | --- | --- | | Failure to include storage capacity and location in a registration | 3.2(a)4 | $500 | $1,000 | $2,500 | M | 30 | | Failure to include a description of hazardous substances in a registration | 3.2(a)5 | $500 | $1,000 | $2,500 | M | 30 | | Failure to include facilities served by the pipeline in a registration | 3.2(a)6 | $500 | $1,000 | $2,500 | M | 30 | | Failure to include transfer capacity and average daily throughput in a registration | 3.2(a)7 | $500 | $1,000 | $2,500 | M | 30 | | Failure to include maps in a registration | 3.2(a)8 | $500 | $1,000 | $2,500 | M | 30 | | Failure to include a pipe inventory in a registration | 3.2(a)9 | $500 | $1,000 | $2,500 | M | 30 | | Failure to include a certification in a registration | 3.2(a)10 | $500 | $1,000 | $2,500 | M | 30 | 133

29. Table 29

N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 134

Failure to conform to 49 CFR 195 3.3 $4,000 $8,000 $20,000 NM
Failure to submit the required information 3.4(a) $2,000 $4,000 $10,000 NM
Failure to submit a summary of the action plan 3.4(a)1 $500 $1,000 $2,500 M 30
Failure to submit a list of containment and removal equipment 3.4(a)2 $500 $1,000 $2,500 M 30
Failure to submit a list of trained personnel 3.4(a)3 $500 $1,000 $2,500 M 30
Failure to submit information about the response coordinator 3.4(a)4 $500 $1,000 $2,500 M 30
Failure to submit procedures for determining recycling or disposal options 3.4(a)5 $500 $1,000 $2,500 M 30
Source context and notes | Failure to conform to 49 CFR 195 | 3.3 | $4,000 | $8,000 | $20,000 | NM | | | --- | --- | --- | --- | --- | --- | --- | | Failure to submit the required information | 3.4(a) | $2,000 | $4,000 | $10,000 | NM | | | Failure to submit a summary of the action plan | 3.4(a)1 | $500 | $1,000 | $2,500 | M | 30 | | Failure to submit a list of containment and removal equipment | 3.4(a)2 | $500 | $1,000 | $2,500 | M | 30 | | Failure to submit a list of trained personnel | 3.4(a)3 | $500 | $1,000 | $2,500 | M | 30 | | Failure to submit information about the response coordinator | 3.4(a)4 | $500 | $1,000 | $2,500 | M | 30 | | Failure to submit procedures for determining recycling or disposal options | 3.4(a)5 | $500 | $1,000 | $2,500 | M | 30 | 134

30. Table 30

N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 135

Failure to report a change in information 3.5(a) $ 1,000 $ 2,000 $ 5,000 M 30
Failure to register a newly installed transmission pipeline 3.5(b) $ 2,000 $ 4,000 $10,000 NM
Source context and notes | Failure to report a change in information | 3.5(a) | $ 1,000 | $ 2,000 | $ 5,000 | M | 30 | | --- | --- | --- | --- | --- | --- | --- | | Failure to register a newly installed transmission pipeline | 3.5(b) | $ 2,000 | $ 4,000 | $10,000 | NM | | 4. The violations of N.J.A.C. 7:1E-4, Plans, and the civil administrative penalty amounts for each violation, are as set forth in the following table, unless modified pursuant to (d) below: | Failure to appoint a facility contact | 4.2(a)2 | $1,000 | $2,000 | $5,000 | M | | --- | --- | --- | --- | --- | --- | | Failure to appoint a response coordinator | 4.3(a) | $2,000 | $4,000 | $10,000 | NM | | Failure to perform an annual emergency response drill | 4.3(b)4 | $4,000 | $8,000 | $20,000 | NM | | | | | Penalty assessed on a per drill basis | | | | Failure to include the required facility personnel | 4.3(b)4i | $1,000 | $2,000 | $5,000 | NM | | Failure to base drill on different scenarios from year to year | 4.3(b)4ii | $1,000 | $2,000 | $5,000 | NM | 135

31. Table 31

N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 135

Failure to appoint a facility contact 4.2(a)2 $1,000 $2,000 $5,000 M
Failure to appoint a response coordinator 4.3(a) $2,000 $4,000 $10,000 NM
Failure to perform an annual emergency response drill 4.3(b)4 $4,000 $8,000 $20,000 NM
Penalty assessed on a per drill basis
Failure to include the required facility personnel 4.3(b)4i $1,000 $2,000 $5,000 NM
Failure to base drill on different scenarios from year to year 4.3(b)4ii $1,000 $2,000 $5,000 NM
Source context and notes | Failure to report a change in information | 3.5(a) | $ 1,000 | $ 2,000 | $ 5,000 | M | 30 | | --- | --- | --- | --- | --- | --- | --- | | Failure to register a newly installed transmission pipeline | 3.5(b) | $ 2,000 | $ 4,000 | $10,000 | NM | | 4. The violations of N.J.A.C. 7:1E-4, Plans, and the civil administrative penalty amounts for each violation, are as set forth in the following table, unless modified pursuant to (d) below: | Failure to appoint a facility contact | 4.2(a)2 | $1,000 | $2,000 | $5,000 | M | | --- | --- | --- | --- | --- | --- | | Failure to appoint a response coordinator | 4.3(a) | $2,000 | $4,000 | $10,000 | NM | | Failure to perform an annual emergency response drill | 4.3(b)4 | $4,000 | $8,000 | $20,000 | NM | | | | | Penalty assessed on a per drill basis | | | | Failure to include the required facility personnel | 4.3(b)4i | $1,000 | $2,000 | $5,000 | NM | | Failure to base drill on different scenarios from year to year | 4.3(b)4ii | $1,000 | $2,000 | $5,000 | NM | 135

32. Table 32

N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 136

Conducted table top drill in consecutive years 4.3(b)4iii $ 1,000 $ 2,000 $ 5,000 NM
Failure to critique the drill in writing 4.3(b)4iv $ 1,000 $ 2,000 $ 5,000 NM
Failure to have adequate cleanup equipment and personnel available 4.3(b)5, 6 $10,000 $20,000 $50,000 NM
Failure to demonstrate financial responsibility 4.4(a) $ 5,000 $10,000 $25,000 NM
Failure to demonstrate financial responsibility in the full amount 4.4(b) $10,000 $20,000 $50,000 NM
Failure to word the letter as specified 4.4(g) $ 2,000 $ 4,000 $10,000 M
Failure to word the guarantee as specified 4.4(k) $2,000 $4,000 $10,000 M
Failure to word the liability insurance as specified 4.4(l) $2,000 $4,000 $10,000 M
Source context and notes | Conducted table top drill in consecutive years | 4.3(b)4iii | $ 1,000 | $ 2,000 | $ 5,000 | NM | | --- | --- | --- | --- | --- | --- | | Failure to critique the drill in writing | 4.3(b)4iv | $ 1,000 | $ 2,000 | $ 5,000 | NM | | Failure to have adequate cleanup equipment and personnel available | 4.3(b)5, 6 | $10,000 | $20,000 | $50,000 | NM | | Failure to demonstrate financial responsibility | 4.4(a) | $ 5,000 | $10,000 | $25,000 | NM | | Failure to demonstrate financial responsibility in the full amount | 4.4(b) | $10,000 | $20,000 | $50,000 | NM | | Failure to word the letter as specified | 4.4(g) | $ 2,000 | $ 4,000 | $10,000 | M | | Failure to word the guarantee as specified | 4.4(k) | $2,000 | $4,000 | $10,000 | M | | Failure to word the liability insurance as specified | 4.4(l) | $2,000 | $4,000 | $10,000 | M | 136

33. Table 33

N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 137

Failure to word the surety bond as specified 4.4(m) $2,000 $4,000 $10,000 M 30
Failure to word the letter of credit as specified 4.4(n) $2,000 $4,000 $10,000 M 30
Failure to notify of bankruptcy commencement 4.4(o) $500 $1,000 $2,500 M 30
Failure to submit a DPCC and DCR plan 4.5(a) $20,000 $40,000 $50,000 NM
Failure to submit a DPCC and DCR plan for a newly designated major facility 4.5(c) $20,000 $40,000 $50,000 NM
Failure to submit a DPCC and DCR plan for a new major facility 4.5(d) $20,000 $40,000 $50,000 NM
Failure to submit information when requested by the Department 4.5(f) $2,000 $4,000 $10,000 M 30
Failure to submit copy of approved plan 4.5(g) $500 $1,000 $2,500 M 30
Source context and notes | Failure to word the surety bond as specified | 4.4(m) | $2,000 | $4,000 | $10,000 | M | 30 | | --- | --- | --- | --- | --- | --- | --- | | Failure to word the letter of credit as specified | 4.4(n) | $2,000 | $4,000 | $10,000 | M | 30 | | Failure to notify of bankruptcy commencement | 4.4(o) | $500 | $1,000 | $2,500 | M | 30 | | Failure to submit a DPCC and DCR plan | 4.5(a) | $20,000 | $40,000 | $50,000 | NM | | | Failure to submit a DPCC and DCR plan for a newly designated major facility | 4.5(c) | $20,000 | $40,000 | $50,000 | NM | | | Failure to submit a DPCC and DCR plan for a new major facility | 4.5(d) | $20,000 | $40,000 | $50,000 | NM | | | Failure to submit information when requested by the Department | 4.5(f) | $2,000 | $4,000 | $10,000 | M | 30 | | Failure to submit copy of approved plan | 4.5(g) | $500 | $1,000 | $2,500 | M | 30 | 137

34. Table 34

N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 138

Failure to implement an approved DPCC or DCR plan 4.6(f) $4,000 $8,000 $20,000 NM
Failure to maintain copy of the plan on-site 4.6(g) $2,000 $4,000 $10,000 NM
Failure to resubmit an acceptable plan 4.7(c) $10,000 $20,000 $50,000 NM
Failure to provide notice of new construction, installation or modification 4.8(a) $2,000 $4,000 $10,000 NM
Failure to submit an amendment 4.8(b) $4,000 $8,000 $20,000 M 30
Failure to submit copy of an amendment 4.8(d) $500 $1,000 $2,500 M 30
Failure to submit information changes 4.8(e) $1,000 $2,000 $4,000 M 30
Failure to renew DPCC/DCR plans 4.9(a) $4,000 $8,000 $20,000 NM
Failure to submit copy of an approved plan 4.9(c) $500 $1,000 $2,500 M 30
Source context and notes | Failure to implement an approved DPCC or DCR plan | 4.6(f) | $4,000 | $8,000 | $20,000 | NM | | --- | --- | --- | --- | --- | --- | | Failure to maintain copy of the plan on-site | 4.6(g) | $2,000 | $4,000 | $10,000 | NM | | Failure to resubmit an acceptable plan | 4.7(c) | $10,000 | $20,000 | $50,000 | NM | | Failure to provide notice of new construction, installation or modification | 4.8(a) | $2,000 | $4,000 | $10,000 | NM | | Failure to submit an amendment | 4.8(b) | $4,000 | $8,000 | $20,000 | M 30 | | Failure to submit copy of an amendment | 4.8(d) | $500 | $1,000 | $2,500 | M 30 | | Failure to submit information changes | 4.8(e) | $1,000 | $2,000 | $4,000 | M 30 | | Failure to renew DPCC/DCR plans | 4.9(a) | $4,000 | $8,000 | $20,000 | NM | | Failure to submit copy of an approved plan | 4.9(c) | $500 | $1,000 | $2,500 | M 30 | 138

35. Table 35

N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 139

Failure to provide the required certification 4.11(a) $4,000 $8,000 $20,000 NM
Failure to provide the required certification 4.11(b) $4,000 $8,000 $20,000 NM
Failure to provide the required certification 4.11(e) $4,000 $8,000 $20,000 NM
Failure to provide the required certification 4.11(f) $4,000 $8,000 $20,000 NM
Source context and notes | Failure to provide the required certification | 4.11(a) | $4,000 | $8,000 | $20,000 | NM | | --- | --- | --- | --- | --- | --- | | Failure to provide the required certification | 4.11(b) | $4,000 | $8,000 | $20,000 | NM | | Failure to provide the required certification | 4.11(e) | $4,000 | $8,000 | $20,000 | NM | | Failure to provide the required certification | 4.11(f) | $4,000 | $8,000 | $20,000 | NM | 5. The violations of N.J.A.C. 7:1E-5, Notification, Response and Reporting, and the civil administrative penalty amounts for each violation, are as set forth in the following table, unless modified pursuant to (d) below: | Failure to promptly notify the Department of a discharge | 5.2(a) | $10,000 | $20,000 | $50,000 | NM | | --- | --- | --- | --- | --- | --- | | Failure to provide all required information upon notification | 5.2(b) | $500 | $1,000 | $2,500 | M 30 | | Failure to notify the Department of a discharge | 5.3(a) | $10,000 | $20,000 | $50,000 | NM | 139

36. Table 36

N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 139

Failure to promptly notify the Department of a discharge 5.2(a) $10,000 $20,000 $50,000 NM
Failure to provide all required information upon notification 5.2(b) $500 $1,000 $2,500 M 30
Failure to notify the Department of a discharge 5.3(a) $10,000 $20,000 $50,000 NM
Source context and notes | Failure to provide the required certification | 4.11(a) | $4,000 | $8,000 | $20,000 | NM | | --- | --- | --- | --- | --- | --- | | Failure to provide the required certification | 4.11(b) | $4,000 | $8,000 | $20,000 | NM | | Failure to provide the required certification | 4.11(e) | $4,000 | $8,000 | $20,000 | NM | | Failure to provide the required certification | 4.11(f) | $4,000 | $8,000 | $20,000 | NM | 5. The violations of N.J.A.C. 7:1E-5, Notification, Response and Reporting, and the civil administrative penalty amounts for each violation, are as set forth in the following table, unless modified pursuant to (d) below: | Failure to promptly notify the Department of a discharge | 5.2(a) | $10,000 | $20,000 | $50,000 | NM | | --- | --- | --- | --- | --- | --- | | Failure to provide all required information upon notification | 5.2(b) | $500 | $1,000 | $2,500 | M 30 | | Failure to notify the Department of a discharge | 5.3(a) | $10,000 | $20,000 | $50,000 | NM | 139

37. Table 37

N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 140

Notification not immediate 5.3(b) $2,000 $4,000 $10,000 NM
Failure to provide information on the person reporting the discharge 5.3(c)1 $500 $1,000 $2,500 M 30
Failure to provide the location of the discharge 5.3(c)2 $500 $1,000 $2,500 M 30
Failure to provide the name of the hazardous substance discharged 5.3(c)3 $500 $1,000 $2,500 M 30
Failure to provide an estimated quantity of each hazardous substance discharged 5.3(c)4 $500 $1,000 $2,500 M 30
Failure to provide time and date information 5.3(c)5 $500 $1,000 $2,500 M 30
Failure to provide information on actions taken 5.3(c)6 $500 $1,000 $2,500 M 30
Failure to provide information on person(s) responsible 5.3(c)7 $500 $1,000 $ [1,250] 2,500 M 30
Failure to prominently display notification requirements 5.3(d) $1,000 $2,000 $5,000 M 30
Source context and notes | Notification not immediate | 5.3(b) | $2,000 | $4,000 | $10,000 | NM | | | --- | --- | --- | --- | --- | --- | --- | | Failure to provide information on the person reporting the discharge | 5.3(c)1 | $500 | $1,000 | $2,500 | M | 30 | | Failure to provide the location of the discharge | 5.3(c)2 | $500 | $1,000 | $2,500 | M | 30 | | Failure to provide the name of the hazardous substance discharged | 5.3(c)3 | $500 | $1,000 | $2,500 | M | 30 | | Failure to provide an estimated quantity of each hazardous substance discharged | 5.3(c)4 | $500 | $1,000 | $2,500 | M | 30 | | Failure to provide time and date information | 5.3(c)5 | $500 | $1,000 | $2,500 | M | 30 | | Failure to provide information on actions taken | 5.3(c)6 | $500 | $1,000 | $2,500 | M | 30 | | Failure to provide information on person(s) responsible | 5.3(c)7 | $500 | $1,000 | $ [1,250] 2,500 | M | 30 | | Failure to prominently display notification requirements | 5.3(d) | $1,000 | $2,000 | $5,000 | M | 30 | 140

38. Table 38

N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 141

Failure to maintain documentation 5.3(e) $1,000 $2,000 $5,000 NM 30
Failure to notify the Department of a discharge of aircraft fuel 5.4(a) $6,000 $12,000 $30,000 NM
Failure to provide the person causing the discharge 5.4(b)1 $500 $1,000 $2,500 M 30
Failure to provide the amount of hazardous substance discharged 5.4(b)2 $500 $1,000 $2,500 M 30
Failure to provide the time the discharge occurred 5.4(b)3 $500 $1,000 $2,500 M 30
Failure to provide the location of the discharge 5.4(b)4 $500 $1,000 $2,500 M 30
Failure to provide wind speed and direction 5.4(b)5 $500 $1,000 $2,500 M 30
Failure to provide the area likely to be affected by the discharge 5.4(b)6 $500 $1,000 $2,500 M 30
Source context and notes | Failure to maintain documentation | 5.3(e) | $1,000 | $2,000 | $5,000 | NM | 30 | | --- | --- | --- | --- | --- | --- | --- | | Failure to notify the Department of a discharge of aircraft fuel | 5.4(a) | $6,000 | $12,000 | $30,000 | NM | | | Failure to provide the person causing the discharge | 5.4(b)1 | $500 | $1,000 | $2,500 | M | 30 | | Failure to provide the amount of hazardous substance discharged | 5.4(b)2 | $500 | $1,000 | $2,500 | M | 30 | | Failure to provide the time the discharge occurred | 5.4(b)3 | $500 | $1,000 | $2,500 | M | 30 | | Failure to provide the location of the discharge | 5.4(b)4 | $500 | $1,000 | $2,500 | M | 30 | | Failure to provide wind speed and direction | 5.4(b)5 | $500 | $1,000 | $2,500 | M | 30 | | Failure to provide the area likely to be affected by the discharge | 5.4(b)6 | $500 | $1,000 | $2,500 | M | 30 | 141

39. Table 39

N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 142

Failure to notify the Department of a malfunction in a discharge detection system 5.5(a) $4,000 $8,000 $20,000 NM
Notification not immediate 5.5(b) $2,000 $4,000 $10,000 NM
Failure to notify the Department of the status of a malfunctioning discharge detection system 5.5(c) $2,000 $4,000 $10,000 NM
Failure to take immediate action to stop a discharge 5.7(a)1 $40,000 $50,000 $50,000 NM
Failure to follow the DCR plan 5.7(a)2i $40,000 $50,000 $50,000 NM
Failure to coordinate any remedial action with the Department 5.7(a)3 $4,000 $8,000 $20,000 NM
Failure to submit a confirmation report 5.8(a) $4,000 $8,000 $20,000 NM
Failure to include information on the individual that reported the discharge 5.8(c)1 $500 $1,000 $2,000 M 30
Source context and notes | Failure to notify the Department of a malfunction in a discharge detection system | 5.5(a) | $4,000 | $8,000 | $20,000 | NM | | --- | --- | --- | --- | --- | --- | | Notification not immediate | 5.5(b) | $2,000 | $4,000 | $10,000 | NM | | Failure to notify the Department of the status of a malfunctioning discharge detection system | 5.5(c) | $2,000 | $4,000 | $10,000 | NM | | Failure to take immediate action to stop a discharge | 5.7(a)1 | $40,000 | $50,000 | $50,000 | NM | | Failure to follow the DCR plan | 5.7(a)2i | $40,000 | $50,000 | $50,000 | NM | | Failure to coordinate any remedial action with the Department | 5.7(a)3 | $4,000 | $8,000 | $20,000 | NM | | Failure to submit a confirmation report | 5.8(a) | $4,000 | $8,000 | $20,000 | NM | | Failure to include information on the individual that reported the discharge | 5.8(c)1 | $500 | $1,000 | $2,000 | M 30 | 142

40. Table 40

N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 143

Failure to include information on the individual submitting the report 5.8(c)2 $500 $1,000 $2,000 M 30
Failure to include information on the owner(s) or operator(s) of where the discharge occurred 5.8(c)3 $500 $1,000 $2,000 M 30
Failure to include the Communications Center number 5.8(c)4 $500 $1,000 $2,500 M 30
Failure to include the source of the discharge 5.8(c)5 $500 $1,000 $2,000 M 30
Failure to include the location of the discharge 5.8(c)6 $500 $1,000 $2,000 M 30
Failure to include the name(s) and CAS number(s) of hazardous substance(s) discharged 5.8(c)7 $500 $1,000 $2,000 M 30
Failure to include quantities of hazardous substances discharged 5.8(c)8 $500 $1,000 $2,000 M 30
Source context and notes | Failure to include information on the individual submitting the report | 5.8(c)2 | $500 | $1,000 | $2,000 | M | 30 | | --- | --- | --- | --- | --- | --- | --- | | Failure to include information on the owner(s) or operator(s) of where the discharge occurred | 5.8(c)3 | $500 | $1,000 | $2,000 | M | 30 | | Failure to include the Communications Center number | 5.8(c)4 | $500 | $1,000 | $2,500 | M | 30 | | Failure to include the source of the discharge | 5.8(c)5 | $500 | $1,000 | $2,000 | M | 30 | | Failure to include the location of the discharge | 5.8(c)6 | $500 | $1,000 | $2,000 | M | 30 | | Failure to include the name(s) and CAS number(s) of hazardous substance(s) discharged | 5.8(c)7 | $500 | $1,000 | $2,000 | M | 30 | | Failure to include quantities of hazardous substances discharged | 5.8(c)8 | $500 | $1,000 | $2,000 | M | 30 | 143

41. Table 41

N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 144

Failure to include date and time information individual that reported the discharge 5.8(c)9 $500 $1,000 $2,000 M 30
Failure to include a description of the measures taken and costs 5.8(c)10 $500 $1,000 $2,000 M 30
Failure to include measures taken or proposed 5.8(c)11 $500 $1,000 $2,000 M 30
Failure to include information on the entities involved in the cleanup 5.8(c)12 $500 $1,000 $2,000 M 30
Failure to include supplemental information 5.8(c)13 $500 $1,000 $2,000 M 30
Failure to include requested information 5.8(c)14 $500 $1,000 $2,000 M 30
Failure to include certification 5.8(c)15 $500 $1,000 $2,000 M 30
Failure to provide additional information 5.8(d) $500 $1,000 $2,000 M 30
Failure to file a requested amendment following a discharge 5.11 $4,000 $8,000 $20,000 NM
Source context and notes | Failure to include date and time information individual that reported the discharge | 5.8(c)9 | $500 | $1,000 | $2,000 | M | 30 | | --- | --- | --- | --- | --- | --- | --- | | Failure to include a description of the measures taken and costs | 5.8(c)10 | $500 | $1,000 | $2,000 | M | 30 | | Failure to include measures taken or proposed | 5.8(c)11 | $500 | $1,000 | $2,000 | M | 30 | | Failure to include information on the entities involved in the cleanup | 5.8(c)12 | $500 | $1,000 | $2,000 | M | 30 | | Failure to include supplemental information | 5.8(c)13 | $500 | $1,000 | $2,000 | M | 30 | | Failure to include requested information | 5.8(c)14 | $500 | $1,000 | $2,000 | M | 30 | | Failure to include certification | 5.8(c)15 | $500 | $1,000 | $2,000 | M | 30 | | Failure to provide additional information | 5.8(d) | $500 | $1,000 | $2,000 | M | 30 | | Failure to file a requested amendment following a discharge | 5.11 | $4,000 | $8,000 | $20,000 | NM | | 144