| Gallons | Penalty |
|---|---|
| >0-9 | $ 1,000 |
| 10-55 | $ 2,000 |
| 56-499 | $ 4,000 |
| 500-999 | $ 6,000 |
| 1,000-4,999 | $ 10,000 |
| 5,000-9,999 | $ 15,000 |
| 10,000-19,999 | $ 20,000 |
| 20,000-29,999 | $ 30,000 |
| 30,000-39,999 | $ 40,000 |
| 40,000-49,999 | $ 50,000 |
| 50,000-59,999 | $ 50,000 |
| 60,000-69,999 | $ 50,000 |
| 70,000-79,999 | $ 50,000 |
| 80,000-89,999 | $ 50,000 |
| 90,000-99,999 | $50,000 |
| 100,000-149,999 | $ 150,000 |
| 150,000-199,999 | $ 200,000 |
Source context and notes
limit. | Gallons | Penalty | | --- | --- | | >0-9 | $ 1,000 | | 10-55 | $ 2,000 | | 56-499 | $ 4,000 | | 500-999 | $ 6,000 | | 1,000-4,999 | $ 10,000 | | 5,000-9,999 | $ 15,000 | | 10,000-19,999 | $ 20,000 | | 20,000-29,999 | $ 30,000 | | 30,000-39,999 | $ 40,000 | | 40,000-49,999 | $ 50,000 | | 50,000-59,999 | $ 50,000 | | 60,000-69,999 | $ 50,000 | | 70,000-79,999 | $ 50,000 | | 80,000-89,999 | $ 50,000 | | 90,000-99,999 | $50,000 | | 100,000-149,999 | $ 150,000 | | 150,000-199,999 | $ 200,000 |2. Table 2¶
N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 107
| 200,000-299,999 | $ 400,000 |
|---|---|
| 300,000-399,999 | $ 800,000 |
| 400,000-499,999 | $ 1,600,000 |
| 500,000-599,999 | $ 2,000,000 |
| 600,000-699,999 | $ 4,000,000 |
| 700,000-799,999 | $ 6,000,000 |
| 800,000-899,999 | $ 8,000,000 |
| 900,000 or greater | $ 10,000,000 |
Source context and notes
| 200,000-299,999 | $ 400,000 | | --- | --- | | 300,000-399,999 | $ 800,000 | | 400,000-499,999 | $ 1,600,000 | | 500,000-599,999 | $ 2,000,000 | | 600,000-699,999 | $ 4,000,000 | | 700,000-799,999 | $ 6,000,000 | | 800,000-899,999 | $ 8,000,000 | | 900,000 or greater | $ 10,000,000 | The base penalty shall be reduced or increased by applying the following factors¹: Area of Impact: Into waters of the State - 30% increase from base3. Table 3¶
N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 109
| Category of Offense^{2} | Citation | First Offense | Second Offense | Third or Subsequent Offense | Minor^{3} | Minor Days^{4} |
|---|---|---|---|---|---|---|
| No secondary containment for an above- ground storage tank | 2.2(a)1 | $20,000 | $40,000 | $50,000 | NM | |
| Failure to surface the base underlying a storage tank with impermeable material | 2.2(a)2 | $10,000 | $20,000 | $30,000 | NM | |
| Failure to equip a pipe with remotely activated or readily accessible valves | 2.2(a)3i | $4,000 | $8,000 | $20,000 | NM | |
| Impairing secondary containment | 2.2(a)3ii | $10,000 | $20,000 | $50,000 | NM | |
| Improper design of heating coil system | 2.2(c) | $4,000 | $8,000 | $20,000 | NM | |
| Failure to equip storage tanks with devices capable of detecting overfills and initiating shutdown mechanisms | 2.2(d) | $10,000 | $20,000 | $50,000 | NM |
Source context and notes
2. The violations of N.J.A.C. 7:1E-2, Prevention and Control of Discharges at Major Facilities, and the civil administrative penalty amounts for each violation set forth in the following table, unless revised pursuant to (d) below: | Category of Offense^{2} | Citation | First Offense | Second Offense | Third or Subsequent Offense | Minor^{3} | Minor Days^{4} | | --- | --- | --- | --- | --- | --- | --- | | No secondary containment for an above- ground storage tank | 2.2(a)1 | $20,000 | $40,000 | $50,000 | NM | | | Failure to surface the base underlying a storage tank with impermeable material | 2.2(a)2 | $10,000 | $20,000 | $30,000 | NM | | | Failure to equip a pipe with remotely activated or readily accessible valves | 2.2(a)3i | $4,000 | $8,000 | $20,000 | NM | | | Impairing secondary containment | 2.2(a)3ii | $10,000 | $20,000 | $50,000 | NM | | | Improper design of heating coil system | 2.2(c) | $4,000 | $8,000 | $20,000 | NM | | | Failure to equip storage tanks with devices capable of detecting overfills and initiating shutdown mechanisms | 2.2(d) | $10,000 | $20,000 | $50,000 | NM | |4. Table 4¶
N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 110
| Failure to equip storage tanks with a high high liquid level cutoff device | 2.2(d)1 | $10,000 | $20,000 | $50,000 | NM |
|---|---|---|---|---|---|
| Failure to equip storage tanks with direct communication | 2.2(d)2 | $10,000 | $20,000 | $50,000 | NM |
| Failure to attend storage tanks of 2,000 gallons or less during filling | 2.2(e) | $4,000 | $8,000 | $20,000 | NM |
| Failure to direct overfill or vent lines into appropriate holding areas | 2.2(f) | $10,000 | $20,000 | $50,000 | NM |
| Failure to locate mobile or portable storage tanks in areas protected by secondary containment | 2.2(g) | $20,000 | $40,000 | $50,000 | NM |
Source context and notes
| Failure to equip storage tanks with a high high liquid level cutoff device | 2.2(d)1 | $10,000 | $20,000 | $50,000 | NM | | --- | --- | --- | --- | --- | --- | | Failure to equip storage tanks with direct communication | 2.2(d)2 | $10,000 | $20,000 | $50,000 | NM | | Failure to attend storage tanks of 2,000 gallons or less during filling | 2.2(e) | $4,000 | $8,000 | $20,000 | NM | | Failure to direct overfill or vent lines into appropriate holding areas | 2.2(f) | $10,000 | $20,000 | $50,000 | NM | | Failure to locate mobile or portable storage tanks in areas protected by secondary containment | 2.2(g) | $20,000 | $40,000 | $50,000 | NM | 1105. Table 5¶
N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 111
| Failure to equip tote, drum, bag, or other storage areas with secondary containment | 2.2(h) | $20,000 | $40,000 | $50,000 | NM |
|---|---|---|---|---|---|
| Failure to equip a tank car or tank truck loading/unloading area with secondary containment | 2.3(a) | $20,000 | $40,000 | $50,000 | NM |
| Failure to inspect the lowermost drain and all outlets of a tank car or tank truck prior to filling | 2.3(c) | $2,000 | $4,000 | $10,000 | NM |
| Failure to examine for leakage and secure valves on all manifolds of a tank car or tank truck prior to departure | 2.3(d) | $2,000 | $4,000 | $10,000 | NM |
| Failure to utilize a system to prevent premature departure | 2.3(e) | $5,000 | $10,000 | $25,000 | NM |
| Failure to attend a tank car | 2.3(f) | $10,000 | $20,000 | $50,000 | NM |
| Failure to attend a tank truck | 2.3(g) | $5,000 | $10,000 | $25,000 | NM |
| Failure to properly mark in-facility pipes | 2.4(a) | $10,000 | $20,000 | $50,000 | M |
Source context and notes
| Failure to equip tote, drum, bag, or other storage areas with secondary containment | 2.2(h) | $20,000 | $40,000 | $50,000 | NM | | --- | --- | --- | --- | --- | --- | | Failure to equip a tank car or tank truck loading/unloading area with secondary containment | 2.3(a) | $20,000 | $40,000 | $50,000 | NM | | Failure to inspect the lowermost drain and all outlets of a tank car or tank truck prior to filling | 2.3(c) | $2,000 | $4,000 | $10,000 | NM | | Failure to examine for leakage and secure valves on all manifolds of a tank car or tank truck prior to departure | 2.3(d) | $2,000 | $4,000 | $10,000 | NM | | Failure to utilize a system to prevent premature departure | 2.3(e) | $5,000 | $10,000 | $25,000 | NM | | Failure to attend a tank car | 2.3(f) | $10,000 | $20,000 | $50,000 | NM | | Failure to attend a tank truck | 2.3(g) | $5,000 | $10,000 | $25,000 | NM | | Failure to properly mark in-facility pipes | 2.4(a) | $10,000 | $20,000 | $50,000 | M |6. Table 6¶
N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 112
| Failure to have double walls or secondary containment and a leak detection device for new buried in-facility pipes | 2.4(b) | $10,000 | $20,000 | $50,000 | NM |
|---|---|---|---|---|---|
| Failure to equip existing in-facility buried pipe with leak detection devices | 2.4(c)1 | $10,000 | $20,000 | $50,000 | NM |
| Failure to implement a maintenance and repair program for existing in-facility buried pipes | 2.4(c)2 | $10,000 | $20,000 | $50,000 | NM |
| Failure to make necessary repairs, upgrades, or replacements to exposed in-facility pipe | 2.4(d) | $20,000 | $40,000 | $50,000 | NM |
| Failure to cap, blank-flange, or physically remove out-of-service in-facility pipe | 2.4(e) | $20,000 | $40,000 | $50,000 | NM |
| Improper design of pipe supports | 2.4(f) | $4,000 | $8,000 | $20,000 | M |
Source context and notes
| Failure to have double walls or secondary containment and a leak detection device for new buried in-facility pipes | 2.4(b) | $10,000 | $20,000 | $50,000 | NM | | --- | --- | --- | --- | --- | --- | | Failure to equip existing in-facility buried pipe with leak detection devices | 2.4(c)1 | $10,000 | $20,000 | $50,000 | NM | | Failure to implement a maintenance and repair program for existing in-facility buried pipes | 2.4(c)2 | $10,000 | $20,000 | $50,000 | NM | | Failure to make necessary repairs, upgrades, or replacements to exposed in-facility pipe | 2.4(d) | $20,000 | $40,000 | $50,000 | NM | | Failure to cap, blank-flange, or physically remove out-of-service in-facility pipe | 2.4(e) | $20,000 | $40,000 | $50,000 | NM | | Improper design of pipe supports | 2.4(f) | $4,000 | $8,000 | $20,000 | M |7. Table 7¶
N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 113
| Failure to minimize the chance of vehicular collision with in-facility pipe | 2.4(g) | $4,000 | $8,000 | $20,000 | NM |
|---|---|---|---|---|---|
| Failure to provide secondary containment for process areas | 2.5(a) | $20,000 | $40,000 | $50,000 | NM |
| Failure to provide for a hazardous substance which drained into process wastewater lines | 2.5(b) | $4,000 | $8,000 | $20,000 | NM |
| Leaks are not prevented from becoming discharges | 2.6(a) | $10,000 | $20,000 | $50,000 | NM |
| Secondary containment does not block all probable discharge routes | 2.6(c)1 | $10,000 | $20,000 | $50,000 | NM |
| Secondary containment does not allow for six inches of rainwater | 2.6(c)2 | $10,000 | $20,000 | $50,000 | NM |
| Secondary containment for storage area has insufficient capacity | 2.6(c)2i | $10,000 | $20,000 | $50,000 | NM |
Source context and notes
| Failure to minimize the chance of vehicular collision with in-facility pipe | 2.4(g) | $4,000 | $8,000 | $20,000 | NM | | --- | --- | --- | --- | --- | --- | | Failure to provide secondary containment for process areas | 2.5(a) | $20,000 | $40,000 | $50,000 | NM | | Failure to provide for a hazardous substance which drained into process wastewater lines | 2.5(b) | $4,000 | $8,000 | $20,000 | NM | | Leaks are not prevented from becoming discharges | 2.6(a) | $10,000 | $20,000 | $50,000 | NM | | Secondary containment does not block all probable discharge routes | 2.6(c)1 | $10,000 | $20,000 | $50,000 | NM | | Secondary containment does not allow for six inches of rainwater | 2.6(c)2 | $10,000 | $20,000 | $50,000 | NM | | Secondary containment for storage area has insufficient capacity | 2.6(c)2i | $10,000 | $20,000 | $50,000 | NM | 1138. Table 8¶
N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 114
| Secondary containment for loading/unloading area has insufficient capacity | 2.6(c)2ii | $10,000 | $20,000 | $50,000 | NM |
|---|---|---|---|---|---|
| Secondary containment for buried pipes has insufficient capacity | 2.6(c)2iii | $10,000 | $20,000 | $50,000 | NM |
| Secondary containment for process area has insufficient capacity | 2.6(c)2iv | $10,000 | $20,000 | $50,000 | NM |
| Secondary containment is not impermeable | 2.6(c)3 | $10,000 | $20,000 | $50,000 | NM |
| Hazardous substances can escape to the environment | 2.6(c)4 | $10,000 | $20,000 | $50,000 | NM |
| Diversion system cannot handle flow rate | 2.6(c)5 | $10,000 | $20,000 | $50,000 | NM |
| Incompatible materials stored in the same secondary containment | 2.6(c)6 | $10,000 | $20,000 | $50,000 | NM |
| Secondary containment capacity impaired | 2.6(c)7 | $10,000 | $20,000 | $50,000 | NM |
Source context and notes
| Secondary containment for loading/unloading area has insufficient capacity | 2.6(c)2ii | $10,000 | $20,000 | $50,000 | NM | | --- | --- | --- | --- | --- | --- | | Secondary containment for buried pipes has insufficient capacity | 2.6(c)2iii | $10,000 | $20,000 | $50,000 | NM | | Secondary containment for process area has insufficient capacity | 2.6(c)2iv | $10,000 | $20,000 | $50,000 | NM | | Secondary containment is not impermeable | 2.6(c)3 | $10,000 | $20,000 | $50,000 | NM | | Hazardous substances can escape to the environment | 2.6(c)4 | $10,000 | $20,000 | $50,000 | NM | | Diversion system cannot handle flow rate | 2.6(c)5 | $10,000 | $20,000 | $50,000 | NM | | Incompatible materials stored in the same secondary containment | 2.6(c)6 | $10,000 | $20,000 | $50,000 | NM | | Secondary containment capacity impaired | 2.6(c)7 | $10,000 | $20,000 | $50,000 | NM | 1149. Table 9¶
N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 115
| Failure to maintain adequate length of containment devices | 2.7(b) | $20,000 | $40,000 | $50,000 | NM |
|---|---|---|---|---|---|
| Failure to deploy a containment device when required | 2.7(c) | $20,000 | $40,000 | $50,000 | NM |
| Failure to maintain a containment device on standby when required | 2.7(d) | $20,000 | $40,000 | $50,000 | NM |
| Failure to properly deploy a containment device | 2.7(e) | $10,000 | $20,000 | $50,000 | NM |
| Failure to properly deploy a containment device | 2.7(f) | $10,000 | $20,000 | $50,000 | NM |
| Commencement or continuation of transfer operations during storm | 2.7(g)1 | $30,000 | $50,000 | $50,000 | NM |
| Commencement or continuation of transfer operations during fires | 2.7(g)2 | $30,000 | $50,000 | $50,000 | NM |
| Commencement or continuation of transfer | 2.7(g)3 | $30,000 | $50,000 | $50,000 | NM |
Source context and notes
| Failure to maintain adequate length of containment devices | 2.7(b) | $20,000 | $40,000 | $50,000 | NM | | --- | --- | --- | --- | --- | --- | | Failure to deploy a containment device when required | 2.7(c) | $20,000 | $40,000 | $50,000 | NM | | Failure to maintain a containment device on standby when required | 2.7(d) | $20,000 | $40,000 | $50,000 | NM | | Failure to properly deploy a containment device | 2.7(e) | $10,000 | $20,000 | $50,000 | NM | | Failure to properly deploy a containment device | 2.7(f) | $10,000 | $20,000 | $50,000 | NM | | Commencement or continuation of transfer operations during storm | 2.7(g)1 | $30,000 | $50,000 | $50,000 | NM | | Commencement or continuation of transfer operations during fires | 2.7(g)2 | $30,000 | $50,000 | $50,000 | NM | | Commencement or continuation of transfer | 2.7(g)3 | $30,000 | $50,000 | $50,000 | NM | 11510. Table 10¶
N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 116
| Commencement or continuation of transfer operations during transfer system break | 2.7(g)4 | $30,000 | $50,000 | $50,000 | NM |
|---|---|---|---|---|---|
| Commencement or continuation of transfer operations when there is an apparent discrepancy | 2.7(g)5 | $30,000 | $50,000 | $50,000 | NM |
| Commencement or continuation of transfer operations during communications breakdown | 2.7(g)6 | $30,000 | $50,000 | $50,000 | NM |
| Commencement or continuation of transfer operations when hazardous substances are observed in the water | 2.7(g)7 | $30,000 | $50,000 | $50,000 | NM |
| Commencement or continuation of transfer operations during a discharge | 2.7(g)8 | $30,000 | $50,000 | $50,000 | NM |
Source context and notes
operations during transfer system malfunction | Commencement or continuation of transfer operations during transfer system break | 2.7(g)4 | $30,000 | $50,000 | $50,000 | NM | | --- | --- | --- | --- | --- | --- | | Commencement or continuation of transfer operations when there is an apparent discrepancy | 2.7(g)5 | $30,000 | $50,000 | $50,000 | NM | | Commencement or continuation of transfer operations during communications breakdown | 2.7(g)6 | $30,000 | $50,000 | $50,000 | NM | | Commencement or continuation of transfer operations when hazardous substances are observed in the water | 2.7(g)7 | $30,000 | $50,000 | $50,000 | NM | | Commencement or continuation of transfer operations during a discharge | 2.7(g)8 | $30,000 | $50,000 | $50,000 | NM |11. Table 11¶
N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 117
| Failure to properly clean up or remove a discharge prior to removing a containment device | 2.7(h) | $40,000 | $50,000 | $50,000 | NM | |
|---|---|---|---|---|---|---|
| Failure to secure or retrieve a containment device | 2.7(i) | $10,000 | $20,000 | $50,000 | M | 30 |
| Failure to clean or dispose of a containment device that is contaminated | 2.7(i) | $10,000 | $20,000 | $50,000 | NM | |
| Failure to prominently display notification requirements | 2.7(j) | $1,000 | $2,000 | $5,000 | M | 30 |
| Improper or inadequate illumination of facility transfer connection points | 2.8(a)1 | $10,000 | $20,000 | $50,000 | NM | |
| Improper or inadequate illumination of vessel transfer connection points | 2.8(a)2 | $10,000 | $20,000 | $50,000 | NM | |
| Improper or inadequate illumination of facility work areas | 2.8(a)3 | $10,000 | $20,000 | $50,000 | NM |
Source context and notes
| Failure to properly clean up or remove a discharge prior to removing a containment device | 2.7(h) | $40,000 | $50,000 | $50,000 | NM | | | --- | --- | --- | --- | --- | --- | --- | | Failure to secure or retrieve a containment device | 2.7(i) | $10,000 | $20,000 | $50,000 | M | 30 | | Failure to clean or dispose of a containment device that is contaminated | 2.7(i) | $10,000 | $20,000 | $50,000 | NM | | | Failure to prominently display notification requirements | 2.7(j) | $1,000 | $2,000 | $5,000 | M | 30 | | Improper or inadequate illumination of facility transfer connection points | 2.8(a)1 | $10,000 | $20,000 | $50,000 | NM | | | Improper or inadequate illumination of vessel transfer connection points | 2.8(a)2 | $10,000 | $20,000 | $50,000 | NM | | | Improper or inadequate illumination of facility work areas | 2.8(a)3 | $10,000 | $20,000 | $50,000 | NM | | 11712. Table 12¶
N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 118
| Improper or inadequate illumination of vessel work areas | 2.8(a)4 | $10,000 | $20,000 | $50,000 | NM |
|---|---|---|---|---|---|
| Improper or inadequate illumination of water surface areas | 2.8(b) | $10,000 | $20,000 | $50,000 | NM |
| Failure to protect a hazardous substance from being carried off or discharged into flood waters | 2.9(a),(b) | $20,000 | $40,000 | $50,000 | NM |
| Failure to conduct visual inspections of marine transfer areas | 2.10(a)1 | $4,000 | $8,000 | $20,000 | NM |
| Failure to conduct visual inspections of secondary containment that is not impermeable | 2.10(a)2 | $4,000 | $8,000 | $20,000 | NM |
| Failure to conduct visual inspections of loading or unloading areas | 2.10(a)3 | $4,000 | $8,000 | $20,000 | NM |
| Failure to conduct visual inspections of process areas | 2.10(a)4 | $4,000 | $8,000 | $20,000 | NM |
Source context and notes
| Improper or inadequate illumination of vessel work areas | 2.8(a)4 | $10,000 | $20,000 | $50,000 | NM | | --- | --- | --- | --- | --- | --- | | Improper or inadequate illumination of water surface areas | 2.8(b) | $10,000 | $20,000 | $50,000 | NM | | Failure to protect a hazardous substance from being carried off or discharged into flood waters | 2.9(a),(b) | $20,000 | $40,000 | $50,000 | NM | | Failure to conduct visual inspections of marine transfer areas | 2.10(a)1 | $4,000 | $8,000 | $20,000 | NM | | Failure to conduct visual inspections of secondary containment that is not impermeable | 2.10(a)2 | $4,000 | $8,000 | $20,000 | NM | | Failure to conduct visual inspections of loading or unloading areas | 2.10(a)3 | $4,000 | $8,000 | $20,000 | NM | | Failure to conduct visual inspections of process areas | 2.10(a)4 | $4,000 | $8,000 | $20,000 | NM | 11813. Table 13¶
N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 119
| Failure to conduct visual inspections of storage areas and pipes | 2.10(a)5 | $4,000 | $8,000 | $20,000 | NM |
|---|---|---|---|---|---|
| Failure to conduct visual inspections of equipment | 2.10(a)6i | $4,000 | $8,000 | $20,000 | NM |
| Failure to conduct visual inspections of fences and locks | 2.10(a)6ii | $4,000 | $8,000 | $20,000 | NM |
| Failure to conduct visual inspections of cleanup and removal equipment and supplies | 2.10(a)6iii | $4,000 | $8,000 | $20,000 | NM |
| Failure to keep documentation of visual inspections | 2.10(b) | $1,000 | $2,000 | $5,000 | NM |
| Failure to keep hazardous substances in suitable containers or protect them from the elements and the possibility of leakage | 2.11(a) | $20,000 | $40,000 | $50,000 | NM |
| Failure to repair, replace or take out of service any leaking equipment | 2.11(b) | 10,000 | $20,000 | $50,000 | NM |
Source context and notes
| Failure to conduct visual inspections of storage areas and pipes | 2.10(a)5 | $4,000 | $8,000 | $20,000 | NM | | --- | --- | --- | --- | --- | --- | | Failure to conduct visual inspections of equipment | 2.10(a)6i | $4,000 | $8,000 | $20,000 | NM | | Failure to conduct visual inspections of fences and locks | 2.10(a)6ii | $4,000 | $8,000 | $20,000 | NM | | Failure to conduct visual inspections of cleanup and removal equipment and supplies | 2.10(a)6iii | $4,000 | $8,000 | $20,000 | NM | | Failure to keep documentation of visual inspections | 2.10(b) | $1,000 | $2,000 | $5,000 | NM | | Failure to keep hazardous substances in suitable containers or protect them from the elements and the possibility of leakage | 2.11(a) | $20,000 | $40,000 | $50,000 | NM | | Failure to repair, replace or take out of service any leaking equipment | 2.11(b) | 10,000 | $20,000 | $50,000 | NM | 11914. Table 14¶
N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 120
| Failure to clean up a leak of a hazardous substance | 2.11(c) | $10,000 | $20,000 | $50,000 | NM |
|---|---|---|---|---|---|
| Failure to have adequate quantities of cleanup materials on hand | 2.11(d) | $4,000 | $8,000 | $20,000 | NM |
| Failure to maintain a supply of safety equipment | 2.11(e) | $4,000 | $8,000 | $20,000 | NM |
| Failure to maintain secondary containment or diversion system free of debris | 2.11(f) | $10,000 | $20,000 | $50,000 | NM |
| Failure to implement a training program | 2.12(a) | $20,000 | $40,000 | $50,000 | NM |
| Failure to provide written job descriptions | 2.12(b)1 | $4,000 | $8,000 | $20,000 | M |
| Failure to provide minimum training consisting of time periods for training | 2.12(b)2 | $4,000 | $8,000 | $20,000 | M |
Source context and notes
| Failure to clean up a leak of a hazardous substance | 2.11(c) | $10,000 | $20,000 | $50,000 | NM | | --- | --- | --- | --- | --- | --- | | Failure to have adequate quantities of cleanup materials on hand | 2.11(d) | $4,000 | $8,000 | $20,000 | NM | | Failure to maintain a supply of safety equipment | 2.11(e) | $4,000 | $8,000 | $20,000 | NM | | Failure to maintain secondary containment or diversion system free of debris | 2.11(f) | $10,000 | $20,000 | $50,000 | NM | | Failure to implement a training program | 2.12(a) | $20,000 | $40,000 | $50,000 | NM | | Failure to provide written job descriptions | 2.12(b)1 | $4,000 | $8,000 | $20,000 | M | | Failure to provide minimum training consisting of time periods for training | 2.12(b)2 | $4,000 | $8,000 | $20,000 | M | 12015. Table 15¶
N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 121
| Failure to provide procedures to determine ability | 2.12(b)3 | $4,000 | $8,000 | $20,000 | M | 30 |
|---|---|---|---|---|---|---|
| Failure to provide training consisting of general orientation and initial training | 2.12(c)1 | $4,000 | $8,000 | $20,000 | NM | |
| Failure to provide job-specific training on SOPs | 2.12(c)2i | $4,000 | $8,000 | $20,000 | NM | |
| Failure to provide training on cleanup and removal | 2.12(c)2ii | $4,000 | $8,000 | $20,000 | NM | |
| Failure to provide training on fires, leaks, and discharges | 2.12(c)2iii | $4,000 | $8,000 | $20,000 | NM | |
| Failure to provide training on equipment familiarization | 2.12(c)2iv | $4,000 | $8,000 | $20,000 | NM | |
| Failure to provide training on new or updated SOPs | 2.12(c)3 | $4,000 | $8,000 | $20,000 | NM | |
| Failure to provide refresher training | 2.12(c)4 | $4,000 | $8,000 | $20,000 | NM | |
| Penalty assessed on a per calendar year basis |
Source context and notes
| Failure to provide procedures to determine ability | 2.12(b)3 | $4,000 | $8,000 | $20,000 | M | 30 | | --- | --- | --- | --- | --- | --- | --- | | Failure to provide training consisting of general orientation and initial training | 2.12(c)1 | $4,000 | $8,000 | $20,000 | NM | | | Failure to provide job-specific training on SOPs | 2.12(c)2i | $4,000 | $8,000 | $20,000 | NM | | | Failure to provide training on cleanup and removal | 2.12(c)2ii | $4,000 | $8,000 | $20,000 | NM | | | Failure to provide training on fires, leaks, and discharges | 2.12(c)2iii | $4,000 | $8,000 | $20,000 | NM | | | Failure to provide training on equipment familiarization | 2.12(c)2iv | $4,000 | $8,000 | $20,000 | NM | | | Failure to provide training on new or updated SOPs | 2.12(c)3 | $4,000 | $8,000 | $20,000 | NM | | | Failure to provide refresher training | 2.12(c)4 | $4,000 | $8,000 | $20,000 | NM | | | | | | Penalty assessed on a per calendar year basis | | | |16. Table 16¶
N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 122
| Failure to specify qualifications of trainers |
2.12(d) | $4,000 | $8,000 | $20,000 | M | 30 |
|---|---|---|---|---|---|---|
| Failure to document training of personnel, subjects covered, and training dates |
2.12(e) | $1,000 | $2,000 | $5,000 | NM | |
| Failure to have procedures to ensure training of employees of outside contractors |
2.12(f) | $2,000 | $4,000 | $10,000 | NM | |
| Failure to provide adequate lighting |
2.13(a) | $10,000 | $20,000 | $50,000 | NM | |
| Failure to provide adequate security or to follow security procedures |
2.13(b) | $10,000 | $20,000 | $50,000 | NM | |
| Failure to establish standard operating procedures (SOPs) |
2.14(a) | $4,000 | $8,000 | $20,000 | NM | |
| Failure have SOPs in all appropriate languages |
2.14(a) | $1,000 | $2,000 | $5,000 | M | 30 |
| Failure to make copies of the SOPs readily available |
2.14(b) | $1,000 | $2,000 | $5,000 | M | 30 |
Source context and notes
| Failure to specifyqualifications of trainers | 2.12(d) | $4,000 | $8,000 | $20,000 | M | 30 | | --- | --- | --- | --- | --- | --- | --- | | Failure to document training of
personnel, subjects covered,
and training dates | 2.12(e) | $1,000 | $2,000 | $5,000 | NM | | | Failure to have procedures to
ensure training of employees
of outside contractors | 2.12(f) | $2,000 | $4,000 | $10,000 | NM | | | Failure to provide adequate
lighting | 2.13(a) | $10,000 | $20,000 | $50,000 | NM | | | Failure to provide adequate
security or to follow security
procedures | 2.13(b) | $10,000 | $20,000 | $50,000 | NM | | | Failure to establish standard
operating procedures (SOPs) | 2.14(a) | $4,000 | $8,000 | $20,000 | NM | | | Failure have SOPs in all
appropriate languages | 2.14(a) | $1,000 | $2,000 | $5,000 | M | 30 | | Failure to make copies of the
SOPs readily available | 2.14(b) | $1,000 | $2,000 | $5,000 | M | 30 | 122
17. Table 17¶
N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 123
| Failure to make copies of the SDS or fact sheets readily available | 2.14(c) | $1,000 | $2,000 | $5,000 | M | 30 |
|---|---|---|---|---|---|---|
| Failure to include a description of the operation in an SOP | 2.14(d)1 | $1,000 | $2,000 Penalty assessed per SOP |
$5,000 | M | 30 |
| Failure to include procedures for visual inspections in an SOP | 2.14(d)2 | $1,000 | $2,000 Penalty assessed per SOP |
$5,000 | M | 30 |
| Failure to include procedures and conditions for normal operation in an SOP | 2.14(d)3 | $1,000 | $2,000 Penalty assessed per SOP |
$5,000 | M | 30 |
| Failure to include a description of equipment or alarms in an SOP | 2.14(d)4 | $1,000 | $2,000 Penalty assessed per SOP |
$5,000 | M | 30 |
| Failure to include a description of leak or discharge conditions in an SOP | 2.14(d)5 | $1,000 | $2,000 Penalty assessed per SOP |
$5,000 | M | 30 |
| Failure to include process flow sheets in an SOP | 2.14(e)1 | $1,000 | $2,000 Penalty assessed per SOP |
$5,000 | M | 30 |
Source context and notes
| Failure to make copies of the SDS or fact sheets readily available | 2.14(c) | $1,000 | $2,000 | $5,000 | M | 30 | | --- | --- | --- | --- | --- | --- | --- | | Failure to include a description of the operation in an SOP | 2.14(d)1 | $1,000 | $2,000Penalty assessed per SOP | $5,000 | M | 30 | | Failure to include procedures for visual inspections in an SOP | 2.14(d)2 | $1,000 | $2,000
Penalty assessed per SOP | $5,000 | M | 30 | | Failure to include procedures and conditions for normal operation in an SOP | 2.14(d)3 | $1,000 | $2,000
Penalty assessed per SOP | $5,000 | M | 30 | | Failure to include a description of equipment or alarms in an SOP | 2.14(d)4 | $1,000 | $2,000
Penalty assessed per SOP | $5,000 | M | 30 | | Failure to include a description of leak or discharge conditions in an SOP | 2.14(d)5 | $1,000 | $2,000
Penalty assessed per SOP | $5,000 | M | 30 | | Failure to include process flow sheets in an SOP | 2.14(e)1 | $1,000 | $2,000
Penalty assessed per SOP | $5,000 | M | 30 | 123
18. Table 18¶
N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 124
| Failure to include a description of abnormal conditions in an SOP | 2.14(e)2 | $1,000 | $2,000 | $5,000 | M | 30 |
|---|---|---|---|---|---|---|
| Penalty assessed per SOP | ||||||
| Failure to include pre-startup procedures in an SOP | 2.14(e)3 | $1,000 | $2,000 | $5,000 | M | 30 |
| Penalty assessed per SOP | ||||||
| Failure to include startup procedures in an SOP | 2.14(e)4 | $1,000 | $2,000 | $5,000 | M | 30 |
| Penalty assessed per SOP | ||||||
| Failure to include shutdown procedures in an SOP | 2.14(e)5 | $1,000 | $2,000 | $5,000 | M | 30 |
| Penalty assessed per SOP | ||||||
| Failure to include procedures on maintenance in an SOP | 2.14(e)6 | $1,000 | $2,000 | $5,000 | M | 30 |
| Penalty assessed per SOP | ||||||
| Failure to include log sheets and checklists in an SOP | 2.14(e)7 | $1,000 | $2,000 | $5,000 | M | 30 |
| Penalty assessed per SOP | ||||||
| Failure to incorporate modifications of procedures into the SOPs prior to implementation | 2.14(g) | $1,000 | $2,000 | $5,000 | NM |
Source context and notes
| Failure to include a description of abnormal conditions in an SOP | 2.14(e)2 | $1,000 | $2,000 | $5,000 | M | 30 | | --- | --- | --- | --- | --- | --- | --- | | | | | Penalty assessed per SOP | | | | | Failure to include pre-startup procedures in an SOP | 2.14(e)3 | $1,000 | $2,000 | $5,000 | M | 30 | | | | | Penalty assessed per SOP | | | | | Failure to include startup procedures in an SOP | 2.14(e)4 | $1,000 | $2,000 | $5,000 | M | 30 | | | | | Penalty assessed per SOP | | | | | Failure to include shutdown procedures in an SOP | 2.14(e)5 | $1,000 | $2,000 | $5,000 | M | 30 | | | | | Penalty assessed per SOP | | | | | Failure to include procedures on maintenance in an SOP | 2.14(e)6 | $1,000 | $2,000 | $5,000 | M | 30 | | | | | Penalty assessed per SOP | | | | | Failure to include log sheets and checklists in an SOP | 2.14(e)7 | $1,000 | $2,000 | $5,000 | M | 30 | | | | | Penalty assessed per SOP | | | | | Failure to incorporate modifications of procedures into the SOPs prior to implementation | 2.14(g) | $1,000 | $2,000 | $5,000 | NM | |19. Table 19¶
N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 125
| Failure to maintain and make available a current index of SOPs | 2.14(h) | $1,000 | $2,000 | $5,000 | M | 30 |
|---|---|---|---|---|---|---|
| Failure to maintain required records for three years for the following: | 2.15(a) | |||||
| Employee training | 2.15(a)1 | $1,000 | $2,000 | $5,000 | NM | |
| Drills for discharge prevention | 2.15(a)2 | $1,000 | $2,000 | $5,000 | NM | |
| Inspection of cleanup and removal equipment and supplies | 2.15(a)3 | $1,000 | $2,000 | $5,000 | NM | |
| Facility inventories | 2.15(a)4 | $1,000 | $2,000 | $5,000 | NM | |
| Failure to maintain required records for 10 years for the following: | 2.15(b) | |||||
| Failure to maintain documentation of discharges | 2.15(b)1 | $1,000 | $2,000 | $5,000 | NM | |
| Failure to maintain documentation of discharge confirmation reports | 2.15(b)2 | $1,000 | $2,000 | $5,000 | NM |
Source context and notes
| Failure to maintain and make available a current index of SOPs | 2.14(h) | $1,000 | $2,000 | $5,000 | M | 30 | | --- | --- | --- | --- | --- | --- | --- | | Failure to maintain required records for three years for the following: | 2.15(a) | | | | | | | Employee training | 2.15(a)1 | $1,000 | $2,000 | $5,000 | NM | | | Drills for discharge prevention | 2.15(a)2 | $1,000 | $2,000 | $5,000 | NM | | | Inspection of cleanup and removal equipment and supplies | 2.15(a)3 | $1,000 | $2,000 | $5,000 | NM | | | Facility inventories | 2.15(a)4 | $1,000 | $2,000 | $5,000 | NM | | | Failure to maintain required records for 10 years for the following: | 2.15(b) | | | | | | | Failure to maintain documentation of discharges | 2.15(b)1 | $1,000 | $2,000 | $5,000 | NM | | | Failure to maintain documentation of discharge confirmation reports | 2.15(b)2 | $1,000 | $2,000 | $5,000 | NM | |20. Table 20¶
N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 126
| Failure to maintain required records for 10 years or the life of the equipment | 2.15(c) | $1,000 | $2,000 | $5,000 | NM |
|---|---|---|---|---|---|
| Failure to maintain required records | 2.15(d) | ||||
| Failure to maintain for daily visual inspections for 10 years or the life of the tank | 2.15(d)1 | $1,000 | $2,000 | $5,000 | NM |
| Penalty assessed on a per tank basis | |||||
| Failure to maintain for monthly inspections for 10 years or the life of the tank | 2.15(d)2 | $1,000 | $2,000 | $5,000 | NM |
| Penalty assessed on a per tank basis | |||||
| Failure to maintain for all other integrity testing, inspection, and repair for the life of the tank | 2.15(d)3 | $1,000 | $2,000 | $5,000 | NM |
| Penalty assessed on a per tank basis | |||||
| Failure to make required records available for inspection | 2.15(e) | $1,000 | $2,000 | $5,000 | M |
| 30 | |||||
| Failure to ensure records can be retrieved in event of loss or destruction | 2.15(f) | $2,000 | $4,000 | $10,000 | NM |
Source context and notes
| Failure to maintain required records for 10 years or the life of the equipment | 2.15(c) | $1,000 | $2,000 | $5,000 | NM | | --- | --- | --- | --- | --- | --- | | Failure to maintain required records | 2.15(d) | | | | | | Failure to maintain for daily visual inspections for 10 years or the life of the tank | 2.15(d)1 | $1,000 | $2,000 | $5,000 | NM | | | | | Penalty assessed on a per tank basis | | | | Failure to maintain for monthly inspections for 10 years or the life of the tank | 2.15(d)2 | $1,000 | $2,000 | $5,000 | NM | | | | | Penalty assessed on a per tank basis | | | | Failure to maintain for all other integrity testing, inspection, and repair for the life of the tank | 2.15(d)3 | $1,000 | $2,000 | $5,000 | NM | | | | | Penalty assessed on a per tank basis | | | | Failure to make required records available for inspection | 2.15(e) | $1,000 | $2,000 | $5,000 | M | | | | | | | 30 | | Failure to ensure records can be retrieved in event of loss or destruction | 2.15(f) | $2,000 | $4,000 | $10,000 | NM |21. Table 21¶
N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 127
| Failure to perform initial integrity testing on a new tank | 2.16(b) | Penalty assessed on a per tank basis | NM | ||
|---|---|---|---|---|---|
| SIZE OF TANK (gallons) | |||||
| 2,001-10,000 | $500 | $1,000 | $2,500 | ||
| 10,001-20,000 | $1,000 | $2,000 | $5,000 | ||
| 20,001-50,000 | $2,500 | $5,000 | $12,500 | ||
| 50,001-100,000 | $5,000 | $10,000 | $25,000 | ||
| 100,001-200,000 | $10,000 | $20,000 | $50,000 | ||
| 200,001-300,000 | $15,000 | $30,000 | $50,000 | ||
| 300,001 and greater | $20,000 | $40,000 | $50,000 | ||
| Failure to follow API 653 for field-erected tank | 2.16(d)1 | $ 2,000 | $ 4,000 | $10,000 | NM |
| The above penalties shall apply for other requirements of the API 653 not otherwise specified below. Penalty assessed on a per tank and per testing/inspection component basis, as listed: | |||||
| Monthly periodic inspection | $ 1,000 | $ 2,000 | $ 4,000 | NM | |
| Formal external inspection | $ 2,000 | $ 4,000 | $10,000 | NM |
Source context and notes
| Failure to perform initial integrity testing on a new tank | 2.16(b) | | Penalty assessed on a per tank basis | | NM | | --- | --- | --- | --- | --- | --- | | SIZE OF TANK (gallons) | | | | | | | 2,001-10,000 | | $500 | $1,000 | $2,500 | | | 10,001-20,000 | | $1,000 | $2,000 | $5,000 | | | 20,001-50,000 | | $2,500 | $5,000 | $12,500 | | | 50,001-100,000 | | $5,000 | $10,000 | $25,000 | | | 100,001-200,000 | | $10,000 | $20,000 | $50,000 | | | 200,001-300,000 | | $15,000 | $30,000 | $50,000 | | | 300,001 and greater | | $20,000 | $40,000 | $50,000 | | | Failure to follow API 653 for field-erected tank | 2.16(d)1 | $ 2,000 | $ 4,000 | $10,000 | NM | | | | The above penalties shall apply for other requirements of the API 653 not otherwise specified below. Penalty assessed on a per tank and per testing/inspection component basis, as listed: | | | | | Monthly periodic inspection | | $ 1,000 | $ 2,000 | $ 4,000 | NM | | Formal external inspection | | $ 2,000 | $ 4,000 | $10,000 | NM | 12722. Table 22¶
N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 128
| Ultrasonic thickness testing | $ 2,000 | $ 4,000 | $10,000 | NM | |
|---|---|---|---|---|---|
| Formal internal inspection | $ 4,000 | $ 8,000 | $20,000 | NM | |
| Failure to follow API 510 or ASME Section VIII for field-erected tank | 2.16(d)2 | $ 2,000 | $ 4,000 | $10,000 | NM |
| The above penalties shall apply for other requirements of the API 510 or ASME Section VIII not otherwise specified below. Penalty assessed on a per tank and per testing/inspection component basis, as listed: | |||||
| Formal external inspection | $2,000 | $4,000 | $10,000 | NM | |
| Formal internal or on-stream inspection | $4,000 | $8,000 | $20,000 | NM | |
| Failure to follow API 653 or SP001 for shop-built tank | 2.16(e)1 | $ 1,000 | $ 2,000 | $ 5,000 | NM |
| The above penalties shall apply for other requirements of the API 653 or SP001 not otherwise specified below. Penalty assessed on a per tank and per testing/inspection component basis, as listed: | |||||
| API 653: | |||||
| Monthly periodic inspection | $ 1,000 | $ 2,000 | $ 4,000 | NM |
Source context and notes
| Ultrasonic thickness testing | | $ 2,000 | $ 4,000 | $10,000 | NM | | --- | --- | --- | --- | --- | --- | | Formal internal inspection | | $ 4,000 | $ 8,000 | $20,000 | NM | | Failure to follow API 510 or ASME Section VIII for field-erected tank | 2.16(d)2 | $ 2,000 | $ 4,000 | $10,000 | NM | | | | The above penalties shall apply for other requirements of the API 510 or ASME Section VIII not otherwise specified below. Penalty assessed on a per tank and per testing/inspection component basis, as listed: | | | | | Formal external inspection | | $2,000 | $4,000 | $10,000 | NM | | Formal internal or on-stream inspection | | $4,000 | $8,000 | $20,000 | NM | | Failure to follow API 653 or SP001 for shop-built tank | 2.16(e)1 | $ 1,000 | $ 2,000 | $ 5,000 | NM | | | | The above penalties shall apply for other requirements of the API 653 or SP001 not otherwise specified below. Penalty assessed on a per tank and per testing/inspection component basis, as listed: | | | | | API 653: | | | | | | | Monthly periodic inspection | | $ 1,000 | $ 2,000 | $ 4,000 | NM |23. Table 23¶
N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 129
| Formal external inspection | $ 2,000 | $ 4,000 | $10,000 | NM |
|---|---|---|---|---|
| Ultrasonic thickness testing | $ 2,000 | $ 4,000 | $10,000 | NM |
| Formal internal inspection | $ 4,000 | $ 8,000 | $20,000 | NM |
| SP001: (All Categories) | ||||
| AST record | $ 1,000 | $ 2,000 | $ 4,000 | NM |
| Periodic (Monthly and Annual Inspections) | $ 1,000 | $ 2,000 | $ 4,000 | NM |
| Formal external inspection | $ 2,000 | $ 4,000 | $10,000 | NM |
| Leak test | $ 2,000 | $ 4,000 | $10,000 | NM |
| Formal internal inspection | $ 4,000 | $ 8,000 | $20,000 | NM |
| Failure to follow API 510 or ASME VIII for shop-built tank | 2.16(e)2 | $ 2,000 | $ 4,000 | NM |
| The above penalties shall apply for other requirements of the API 510 or ASME VIII not otherwise specified below. Penalty assessed on a per tank and per testing/inspection component basis, as listed: | ||||
| Formal external inspection | $ 2,000 | $ 4,000 | $10,000 | NM |
Source context and notes
| Formal external inspection | $ 2,000 | $ 4,000 | $10,000 | NM | | --- | --- | --- | --- | --- | | Ultrasonic thickness testing | $ 2,000 | $ 4,000 | $10,000 | NM | | Formal internal inspection | $ 4,000 | $ 8,000 | $20,000 | NM | | SP001: (All Categories) | | | | | | AST record | $ 1,000 | $ 2,000 | $ 4,000 | NM | | Periodic (Monthly and Annual Inspections) | $ 1,000 | $ 2,000 | $ 4,000 | NM | | Formal external inspection | $ 2,000 | $ 4,000 | $10,000 | NM | | Leak test | $ 2,000 | $ 4,000 | $10,000 | NM | | Formal internal inspection | $ 4,000 | $ 8,000 | $20,000 | NM | | Failure to follow API 510 or ASME VIII for shop-built tank | 2.16(e)2 | $ 2,000 | $ 4,000 | NM | | | | The above penalties shall apply for other requirements of the API 510 or ASME VIII not otherwise specified below. Penalty assessed on a per tank and per testing/inspection component basis, as listed: | | | | Formal external inspection | $ 2,000 | $ 4,000 | $10,000 | NM | 12924. Table 24¶
N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 130
| Formal internal or on-stream inspection | $ 4,000 | $ 8,000 | $20,000 | NM | |
|---|---|---|---|---|---|
| Failure to follow established protocol for FRP tanks | 2.16(f) | ||||
| Penalty assessed on a per tank and per testing/inspection component basis, as listed: | |||||
| Formal external inspection | $2,000 | $4,000 | $10,000 | NM | |
| Acoustic Emission Testing (ASTM E1067) | $2,000 | $4,000 | $10,000 | NM | |
| Formal internal inspection | $2,000 | $4,000 | $10,000 | NM | |
| Failure to follow established protocol | 2.16(g) | ||||
| Penalty assessed on a per tank and per testing/inspection component basis, as listed: | |||||
| Formal external inspection | $ 2,000 | $ 4,000 | $10,000 | NM | |
| Formal internal inspection | $ 2,000 | $ 4,000 | $10,000 | NM | |
| Failure to follow established protocol | 2.16(h) |
Source context and notes
| Formal internal or on-stream inspection | | $ 4,000 | $ 8,000 | $20,000 | NM | | --- | --- | --- | --- | --- | --- | | Failure to follow established protocol for FRP tanks | 2.16(f) | | | | | | | | Penalty assessed on a per tank and per testing/inspection component basis, as listed: | | | | | Formal external inspection | | $2,000 | $4,000 | $10,000 | NM | | Acoustic Emission Testing (ASTM E1067) | | $2,000 | $4,000 | $10,000 | NM | | Formal internal inspection | | $2,000 | $4,000 | $10,000 | NM | | Failure to follow established protocol | 2.16(g) | | | | | | | | Penalty assessed on a per tank and per testing/inspection component basis, as listed: | | | | | Formal external inspection | | $ 2,000 | $ 4,000 | $10,000 | NM | | Formal internal inspection | | $ 2,000 | $ 4,000 | $10,000 | NM | | Failure to follow established protocol | 2.16(h) | | | | | 13025. Table 25¶
N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 131
| Penalty assessed on a per tank and per testing/inspection component basis, as listed: | |||||
|---|---|---|---|---|---|
| Shell thickness test | 2.16(h)1 | $ 2,000 | $ 4,000 | $10,000 | NM |
| Bottom thickness test | 2.16(h)2 | $ 2,000 | $ 4,000 | $10,000 | NM |
| External visual inspection of tank | 2.16(h)3 | $ 1,000 | $ 2,000 | $5,000 | NM |
| Internal visual inspection of tank | 2.16(h)4 | $ 2,000 | $ 4,000 | $10,000 | NM |
| External visual inspection of foundation and ancillary equipment | 2.16(h)5 | $ 1,000 | $ 2,000 | $ 5,000 | NM |
| Failure to follow approved alternative protocol | 2.16(i) | $4,000 | $8,000 | $20,000 | NM |
| Penalty assessed on a per tank and per testing/inspection component basis | |||||
| Failure to take tank out of service following a failed integrity test or inspection | 2.16(j) | $20,000 | $40,000 | $50,000 | NM |
| Failure to meet minimum reporting standard | 2.16(k) | $ 1,000 | $ 2,000 | $ 5,000 | M |
Source context and notes
| | | Penalty assessed on a per tank and per testing/inspection component basis, as listed: | | | | | --- | --- | --- | --- | --- | --- | | Shell thickness test | 2.16(h)1 | $ 2,000 | $ 4,000 | $10,000 | NM | | Bottom thickness test | 2.16(h)2 | $ 2,000 | $ 4,000 | $10,000 | NM | | External visual inspection of tank | 2.16(h)3 | $ 1,000 | $ 2,000 | $5,000 | NM | | Internal visual inspection of tank | 2.16(h)4 | $ 2,000 | $ 4,000 | $10,000 | NM | | External visual inspection of foundation and ancillary equipment | 2.16(h)5 | $ 1,000 | $ 2,000 | $ 5,000 | NM | | Failure to follow approved alternative protocol | 2.16(i) | $4,000 | $8,000 | $20,000 | NM | | | | Penalty assessed on a per tank and per testing/inspection component basis | | | | | Failure to take tank out of service following a failed integrity test or inspection | 2.16(j) | $20,000 | $40,000 | $50,000 | NM | | Failure to meet minimum reporting standard | 2.16(k) | $ 1,000 | $ 2,000 | $ 5,000 | M |26. Table 26¶
N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 132
| Failure to prepare repair schedule | 2.16(l) | $ 5,000 | $10,000 | $25,000 | NM |
|---|---|---|---|---|---|
| Penalty assessed on a per tank basis | |||||
| Failure to implement the repair schedule | 2.16(l) | $ 5,000 | $10,000 | $25,000 | NM |
| Penalty assessed on a per tank basis | |||||
| Failure to document disposition of all recommended repairs and monitoring, including reasons for recommended actions that are delayed or deemed unnecessary | 2.16(l) | $ 1,000 | $ 2,000 | $ 5,000 | M 30 |
| Penalty assessed on a per tank basis |
Source context and notes
| Failure to prepare repair schedule | 2.16(l) | $ 5,000 | $10,000 | $25,000 | NM | | --- | --- | --- | --- | --- | --- | | | | | Penalty assessed on a per tank basis | | | | Failure to implement the repair schedule | 2.16(l) | $ 5,000 | $10,000 | $25,000 | NM | | | | | Penalty assessed on a per tank basis | | | | Failure to document disposition of all recommended repairs and monitoring, including reasons for recommended actions that are delayed or deemed unnecessary | 2.16(l) | $ 1,000 | $ 2,000 | $ 5,000 | M 30 | | | | | Penalty assessed on a per tank basis | | | 3. The violations of N.J.A.C 7:1E-3, Transmission Pipelines, and the civil administrative penalty amounts for each violation, are as set forth in the following table, unless modified pursuant to (d) below: | Failure to register | 3.2(a) | $2,000 | $4,000 | $10,000 | NM | | --- | --- | --- | --- | --- | --- | | Failure to include owner/operator information in a registration | 3.2(a)1 | $500 | $1,000 | $2,500 | M 30 | | Failure to include name and contact information in a registration | 3.2(a)2 | $500 | $1,000 | $2,500 | M 30 | 13227. Table 27¶
N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 132
| Failure to register | 3.2(a) | $2,000 | $4,000 | $10,000 | NM |
|---|---|---|---|---|---|
| Failure to include owner/operator information in a registration | 3.2(a)1 | $500 | $1,000 | $2,500 | M 30 |
| Failure to include name and contact information in a registration | 3.2(a)2 | $500 | $1,000 | $2,500 | M 30 |
Source context and notes
| | | | Penalty assessed on a per tank basis | | | | Failure to implement the repair schedule | 2.16(l) | $ 5,000 | $10,000 | $25,000 | NM | | | | | Penalty assessed on a per tank basis | | | | Failure to document disposition of all recommended repairs and monitoring, including reasons for recommended actions that are delayed or deemed unnecessary | 2.16(l) | $ 1,000 | $ 2,000 | $ 5,000 | M 30 | | | | | Penalty assessed on a per tank basis | | | 3. The violations of N.J.A.C 7:1E-3, Transmission Pipelines, and the civil administrative penalty amounts for each violation, are as set forth in the following table, unless modified pursuant to (d) below: | Failure to register | 3.2(a) | $2,000 | $4,000 | $10,000 | NM | | --- | --- | --- | --- | --- | --- | | Failure to include owner/operator information in a registration | 3.2(a)1 | $500 | $1,000 | $2,500 | M 30 | | Failure to include name and contact information in a registration | 3.2(a)2 | $500 | $1,000 | $2,500 | M 30 | 13228. Table 28¶
N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 133
| Failure to include registered agent information in a registration | 3.2(a)3 | $500 | $1,000 | $2,500 | M | 30 |
|---|---|---|---|---|---|---|
| Failure to include storage capacity and location in a registration | 3.2(a)4 | $500 | $1,000 | $2,500 | M | 30 |
| Failure to include a description of hazardous substances in a registration | 3.2(a)5 | $500 | $1,000 | $2,500 | M | 30 |
| Failure to include facilities served by the pipeline in a registration | 3.2(a)6 | $500 | $1,000 | $2,500 | M | 30 |
| Failure to include transfer capacity and average daily throughput in a registration | 3.2(a)7 | $500 | $1,000 | $2,500 | M | 30 |
| Failure to include maps in a registration | 3.2(a)8 | $500 | $1,000 | $2,500 | M | 30 |
| Failure to include a pipe inventory in a registration | 3.2(a)9 | $500 | $1,000 | $2,500 | M | 30 |
| Failure to include a certification in a registration | 3.2(a)10 | $500 | $1,000 | $2,500 | M | 30 |
Source context and notes
| Failure to include registered agent information in a registration | 3.2(a)3 | $500 | $1,000 | $2,500 | M | 30 | | --- | --- | --- | --- | --- | --- | --- | | Failure to include storage capacity and location in a registration | 3.2(a)4 | $500 | $1,000 | $2,500 | M | 30 | | Failure to include a description of hazardous substances in a registration | 3.2(a)5 | $500 | $1,000 | $2,500 | M | 30 | | Failure to include facilities served by the pipeline in a registration | 3.2(a)6 | $500 | $1,000 | $2,500 | M | 30 | | Failure to include transfer capacity and average daily throughput in a registration | 3.2(a)7 | $500 | $1,000 | $2,500 | M | 30 | | Failure to include maps in a registration | 3.2(a)8 | $500 | $1,000 | $2,500 | M | 30 | | Failure to include a pipe inventory in a registration | 3.2(a)9 | $500 | $1,000 | $2,500 | M | 30 | | Failure to include a certification in a registration | 3.2(a)10 | $500 | $1,000 | $2,500 | M | 30 | 13329. Table 29¶
N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 134
| Failure to conform to 49 CFR 195 | 3.3 | $4,000 | $8,000 | $20,000 | NM | |
|---|---|---|---|---|---|---|
| Failure to submit the required information | 3.4(a) | $2,000 | $4,000 | $10,000 | NM | |
| Failure to submit a summary of the action plan | 3.4(a)1 | $500 | $1,000 | $2,500 | M | 30 |
| Failure to submit a list of containment and removal equipment | 3.4(a)2 | $500 | $1,000 | $2,500 | M | 30 |
| Failure to submit a list of trained personnel | 3.4(a)3 | $500 | $1,000 | $2,500 | M | 30 |
| Failure to submit information about the response coordinator | 3.4(a)4 | $500 | $1,000 | $2,500 | M | 30 |
| Failure to submit procedures for determining recycling or disposal options | 3.4(a)5 | $500 | $1,000 | $2,500 | M | 30 |
Source context and notes
| Failure to conform to 49 CFR 195 | 3.3 | $4,000 | $8,000 | $20,000 | NM | | | --- | --- | --- | --- | --- | --- | --- | | Failure to submit the required information | 3.4(a) | $2,000 | $4,000 | $10,000 | NM | | | Failure to submit a summary of the action plan | 3.4(a)1 | $500 | $1,000 | $2,500 | M | 30 | | Failure to submit a list of containment and removal equipment | 3.4(a)2 | $500 | $1,000 | $2,500 | M | 30 | | Failure to submit a list of trained personnel | 3.4(a)3 | $500 | $1,000 | $2,500 | M | 30 | | Failure to submit information about the response coordinator | 3.4(a)4 | $500 | $1,000 | $2,500 | M | 30 | | Failure to submit procedures for determining recycling or disposal options | 3.4(a)5 | $500 | $1,000 | $2,500 | M | 30 | 13430. Table 30¶
N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 135
| Failure to report a change in information | 3.5(a) | $ 1,000 | $ 2,000 | $ 5,000 | M | 30 |
|---|---|---|---|---|---|---|
| Failure to register a newly installed transmission pipeline | 3.5(b) | $ 2,000 | $ 4,000 | $10,000 | NM |
Source context and notes
| Failure to report a change in information | 3.5(a) | $ 1,000 | $ 2,000 | $ 5,000 | M | 30 | | --- | --- | --- | --- | --- | --- | --- | | Failure to register a newly installed transmission pipeline | 3.5(b) | $ 2,000 | $ 4,000 | $10,000 | NM | | 4. The violations of N.J.A.C. 7:1E-4, Plans, and the civil administrative penalty amounts for each violation, are as set forth in the following table, unless modified pursuant to (d) below: | Failure to appoint a facility contact | 4.2(a)2 | $1,000 | $2,000 | $5,000 | M | | --- | --- | --- | --- | --- | --- | | Failure to appoint a response coordinator | 4.3(a) | $2,000 | $4,000 | $10,000 | NM | | Failure to perform an annual emergency response drill | 4.3(b)4 | $4,000 | $8,000 | $20,000 | NM | | | | | Penalty assessed on a per drill basis | | | | Failure to include the required facility personnel | 4.3(b)4i | $1,000 | $2,000 | $5,000 | NM | | Failure to base drill on different scenarios from year to year | 4.3(b)4ii | $1,000 | $2,000 | $5,000 | NM | 13531. Table 31¶
N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 135
| Failure to appoint a facility contact | 4.2(a)2 | $1,000 | $2,000 | $5,000 | M |
|---|---|---|---|---|---|
| Failure to appoint a response coordinator | 4.3(a) | $2,000 | $4,000 | $10,000 | NM |
| Failure to perform an annual emergency response drill | 4.3(b)4 | $4,000 | $8,000 | $20,000 | NM |
| Penalty assessed on a per drill basis | |||||
| Failure to include the required facility personnel | 4.3(b)4i | $1,000 | $2,000 | $5,000 | NM |
| Failure to base drill on different scenarios from year to year | 4.3(b)4ii | $1,000 | $2,000 | $5,000 | NM |
Source context and notes
| Failure to report a change in information | 3.5(a) | $ 1,000 | $ 2,000 | $ 5,000 | M | 30 | | --- | --- | --- | --- | --- | --- | --- | | Failure to register a newly installed transmission pipeline | 3.5(b) | $ 2,000 | $ 4,000 | $10,000 | NM | | 4. The violations of N.J.A.C. 7:1E-4, Plans, and the civil administrative penalty amounts for each violation, are as set forth in the following table, unless modified pursuant to (d) below: | Failure to appoint a facility contact | 4.2(a)2 | $1,000 | $2,000 | $5,000 | M | | --- | --- | --- | --- | --- | --- | | Failure to appoint a response coordinator | 4.3(a) | $2,000 | $4,000 | $10,000 | NM | | Failure to perform an annual emergency response drill | 4.3(b)4 | $4,000 | $8,000 | $20,000 | NM | | | | | Penalty assessed on a per drill basis | | | | Failure to include the required facility personnel | 4.3(b)4i | $1,000 | $2,000 | $5,000 | NM | | Failure to base drill on different scenarios from year to year | 4.3(b)4ii | $1,000 | $2,000 | $5,000 | NM | 13532. Table 32¶
N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 136
| Conducted table top drill in consecutive years | 4.3(b)4iii | $ 1,000 | $ 2,000 | $ 5,000 | NM |
|---|---|---|---|---|---|
| Failure to critique the drill in writing | 4.3(b)4iv | $ 1,000 | $ 2,000 | $ 5,000 | NM |
| Failure to have adequate cleanup equipment and personnel available | 4.3(b)5, 6 | $10,000 | $20,000 | $50,000 | NM |
| Failure to demonstrate financial responsibility | 4.4(a) | $ 5,000 | $10,000 | $25,000 | NM |
| Failure to demonstrate financial responsibility in the full amount | 4.4(b) | $10,000 | $20,000 | $50,000 | NM |
| Failure to word the letter as specified | 4.4(g) | $ 2,000 | $ 4,000 | $10,000 | M |
| Failure to word the guarantee as specified | 4.4(k) | $2,000 | $4,000 | $10,000 | M |
| Failure to word the liability insurance as specified | 4.4(l) | $2,000 | $4,000 | $10,000 | M |
Source context and notes
| Conducted table top drill in consecutive years | 4.3(b)4iii | $ 1,000 | $ 2,000 | $ 5,000 | NM | | --- | --- | --- | --- | --- | --- | | Failure to critique the drill in writing | 4.3(b)4iv | $ 1,000 | $ 2,000 | $ 5,000 | NM | | Failure to have adequate cleanup equipment and personnel available | 4.3(b)5, 6 | $10,000 | $20,000 | $50,000 | NM | | Failure to demonstrate financial responsibility | 4.4(a) | $ 5,000 | $10,000 | $25,000 | NM | | Failure to demonstrate financial responsibility in the full amount | 4.4(b) | $10,000 | $20,000 | $50,000 | NM | | Failure to word the letter as specified | 4.4(g) | $ 2,000 | $ 4,000 | $10,000 | M | | Failure to word the guarantee as specified | 4.4(k) | $2,000 | $4,000 | $10,000 | M | | Failure to word the liability insurance as specified | 4.4(l) | $2,000 | $4,000 | $10,000 | M | 13633. Table 33¶
N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 137
| Failure to word the surety bond as specified | 4.4(m) | $2,000 | $4,000 | $10,000 | M | 30 |
|---|---|---|---|---|---|---|
| Failure to word the letter of credit as specified | 4.4(n) | $2,000 | $4,000 | $10,000 | M | 30 |
| Failure to notify of bankruptcy commencement | 4.4(o) | $500 | $1,000 | $2,500 | M | 30 |
| Failure to submit a DPCC and DCR plan | 4.5(a) | $20,000 | $40,000 | $50,000 | NM | |
| Failure to submit a DPCC and DCR plan for a newly designated major facility | 4.5(c) | $20,000 | $40,000 | $50,000 | NM | |
| Failure to submit a DPCC and DCR plan for a new major facility | 4.5(d) | $20,000 | $40,000 | $50,000 | NM | |
| Failure to submit information when requested by the Department | 4.5(f) | $2,000 | $4,000 | $10,000 | M | 30 |
| Failure to submit copy of approved plan | 4.5(g) | $500 | $1,000 | $2,500 | M | 30 |
Source context and notes
| Failure to word the surety bond as specified | 4.4(m) | $2,000 | $4,000 | $10,000 | M | 30 | | --- | --- | --- | --- | --- | --- | --- | | Failure to word the letter of credit as specified | 4.4(n) | $2,000 | $4,000 | $10,000 | M | 30 | | Failure to notify of bankruptcy commencement | 4.4(o) | $500 | $1,000 | $2,500 | M | 30 | | Failure to submit a DPCC and DCR plan | 4.5(a) | $20,000 | $40,000 | $50,000 | NM | | | Failure to submit a DPCC and DCR plan for a newly designated major facility | 4.5(c) | $20,000 | $40,000 | $50,000 | NM | | | Failure to submit a DPCC and DCR plan for a new major facility | 4.5(d) | $20,000 | $40,000 | $50,000 | NM | | | Failure to submit information when requested by the Department | 4.5(f) | $2,000 | $4,000 | $10,000 | M | 30 | | Failure to submit copy of approved plan | 4.5(g) | $500 | $1,000 | $2,500 | M | 30 | 13734. Table 34¶
N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 138
| Failure to implement an approved DPCC or DCR plan | 4.6(f) | $4,000 | $8,000 | $20,000 | NM |
|---|---|---|---|---|---|
| Failure to maintain copy of the plan on-site | 4.6(g) | $2,000 | $4,000 | $10,000 | NM |
| Failure to resubmit an acceptable plan | 4.7(c) | $10,000 | $20,000 | $50,000 | NM |
| Failure to provide notice of new construction, installation or modification | 4.8(a) | $2,000 | $4,000 | $10,000 | NM |
| Failure to submit an amendment | 4.8(b) | $4,000 | $8,000 | $20,000 | M 30 |
| Failure to submit copy of an amendment | 4.8(d) | $500 | $1,000 | $2,500 | M 30 |
| Failure to submit information changes | 4.8(e) | $1,000 | $2,000 | $4,000 | M 30 |
| Failure to renew DPCC/DCR plans | 4.9(a) | $4,000 | $8,000 | $20,000 | NM |
| Failure to submit copy of an approved plan | 4.9(c) | $500 | $1,000 | $2,500 | M 30 |
Source context and notes
| Failure to implement an approved DPCC or DCR plan | 4.6(f) | $4,000 | $8,000 | $20,000 | NM | | --- | --- | --- | --- | --- | --- | | Failure to maintain copy of the plan on-site | 4.6(g) | $2,000 | $4,000 | $10,000 | NM | | Failure to resubmit an acceptable plan | 4.7(c) | $10,000 | $20,000 | $50,000 | NM | | Failure to provide notice of new construction, installation or modification | 4.8(a) | $2,000 | $4,000 | $10,000 | NM | | Failure to submit an amendment | 4.8(b) | $4,000 | $8,000 | $20,000 | M 30 | | Failure to submit copy of an amendment | 4.8(d) | $500 | $1,000 | $2,500 | M 30 | | Failure to submit information changes | 4.8(e) | $1,000 | $2,000 | $4,000 | M 30 | | Failure to renew DPCC/DCR plans | 4.9(a) | $4,000 | $8,000 | $20,000 | NM | | Failure to submit copy of an approved plan | 4.9(c) | $500 | $1,000 | $2,500 | M 30 | 13835. Table 35¶
N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 139
| Failure to provide the required certification | 4.11(a) | $4,000 | $8,000 | $20,000 | NM |
|---|---|---|---|---|---|
| Failure to provide the required certification | 4.11(b) | $4,000 | $8,000 | $20,000 | NM |
| Failure to provide the required certification | 4.11(e) | $4,000 | $8,000 | $20,000 | NM |
| Failure to provide the required certification | 4.11(f) | $4,000 | $8,000 | $20,000 | NM |
Source context and notes
| Failure to provide the required certification | 4.11(a) | $4,000 | $8,000 | $20,000 | NM | | --- | --- | --- | --- | --- | --- | | Failure to provide the required certification | 4.11(b) | $4,000 | $8,000 | $20,000 | NM | | Failure to provide the required certification | 4.11(e) | $4,000 | $8,000 | $20,000 | NM | | Failure to provide the required certification | 4.11(f) | $4,000 | $8,000 | $20,000 | NM | 5. The violations of N.J.A.C. 7:1E-5, Notification, Response and Reporting, and the civil administrative penalty amounts for each violation, are as set forth in the following table, unless modified pursuant to (d) below: | Failure to promptly notify the Department of a discharge | 5.2(a) | $10,000 | $20,000 | $50,000 | NM | | --- | --- | --- | --- | --- | --- | | Failure to provide all required information upon notification | 5.2(b) | $500 | $1,000 | $2,500 | M 30 | | Failure to notify the Department of a discharge | 5.3(a) | $10,000 | $20,000 | $50,000 | NM | 13936. Table 36¶
N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 139
| Failure to promptly notify the Department of a discharge | 5.2(a) | $10,000 | $20,000 | $50,000 | NM |
|---|---|---|---|---|---|
| Failure to provide all required information upon notification | 5.2(b) | $500 | $1,000 | $2,500 | M 30 |
| Failure to notify the Department of a discharge | 5.3(a) | $10,000 | $20,000 | $50,000 | NM |
Source context and notes
| Failure to provide the required certification | 4.11(a) | $4,000 | $8,000 | $20,000 | NM | | --- | --- | --- | --- | --- | --- | | Failure to provide the required certification | 4.11(b) | $4,000 | $8,000 | $20,000 | NM | | Failure to provide the required certification | 4.11(e) | $4,000 | $8,000 | $20,000 | NM | | Failure to provide the required certification | 4.11(f) | $4,000 | $8,000 | $20,000 | NM | 5. The violations of N.J.A.C. 7:1E-5, Notification, Response and Reporting, and the civil administrative penalty amounts for each violation, are as set forth in the following table, unless modified pursuant to (d) below: | Failure to promptly notify the Department of a discharge | 5.2(a) | $10,000 | $20,000 | $50,000 | NM | | --- | --- | --- | --- | --- | --- | | Failure to provide all required information upon notification | 5.2(b) | $500 | $1,000 | $2,500 | M 30 | | Failure to notify the Department of a discharge | 5.3(a) | $10,000 | $20,000 | $50,000 | NM | 13937. Table 37¶
N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 140
| Notification not immediate | 5.3(b) | $2,000 | $4,000 | $10,000 | NM | |
|---|---|---|---|---|---|---|
| Failure to provide information on the person reporting the discharge | 5.3(c)1 | $500 | $1,000 | $2,500 | M | 30 |
| Failure to provide the location of the discharge | 5.3(c)2 | $500 | $1,000 | $2,500 | M | 30 |
| Failure to provide the name of the hazardous substance discharged | 5.3(c)3 | $500 | $1,000 | $2,500 | M | 30 |
| Failure to provide an estimated quantity of each hazardous substance discharged | 5.3(c)4 | $500 | $1,000 | $2,500 | M | 30 |
| Failure to provide time and date information | 5.3(c)5 | $500 | $1,000 | $2,500 | M | 30 |
| Failure to provide information on actions taken | 5.3(c)6 | $500 | $1,000 | $2,500 | M | 30 |
| Failure to provide information on person(s) responsible | 5.3(c)7 | $500 | $1,000 | $ [1,250] 2,500 | M | 30 |
| Failure to prominently display notification requirements | 5.3(d) | $1,000 | $2,000 | $5,000 | M | 30 |
Source context and notes
| Notification not immediate | 5.3(b) | $2,000 | $4,000 | $10,000 | NM | | | --- | --- | --- | --- | --- | --- | --- | | Failure to provide information on the person reporting the discharge | 5.3(c)1 | $500 | $1,000 | $2,500 | M | 30 | | Failure to provide the location of the discharge | 5.3(c)2 | $500 | $1,000 | $2,500 | M | 30 | | Failure to provide the name of the hazardous substance discharged | 5.3(c)3 | $500 | $1,000 | $2,500 | M | 30 | | Failure to provide an estimated quantity of each hazardous substance discharged | 5.3(c)4 | $500 | $1,000 | $2,500 | M | 30 | | Failure to provide time and date information | 5.3(c)5 | $500 | $1,000 | $2,500 | M | 30 | | Failure to provide information on actions taken | 5.3(c)6 | $500 | $1,000 | $2,500 | M | 30 | | Failure to provide information on person(s) responsible | 5.3(c)7 | $500 | $1,000 | $ [1,250] 2,500 | M | 30 | | Failure to prominently display notification requirements | 5.3(d) | $1,000 | $2,000 | $5,000 | M | 30 | 14038. Table 38¶
N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 141
| Failure to maintain documentation | 5.3(e) | $1,000 | $2,000 | $5,000 | NM | 30 |
|---|---|---|---|---|---|---|
| Failure to notify the Department of a discharge of aircraft fuel | 5.4(a) | $6,000 | $12,000 | $30,000 | NM | |
| Failure to provide the person causing the discharge | 5.4(b)1 | $500 | $1,000 | $2,500 | M | 30 |
| Failure to provide the amount of hazardous substance discharged | 5.4(b)2 | $500 | $1,000 | $2,500 | M | 30 |
| Failure to provide the time the discharge occurred | 5.4(b)3 | $500 | $1,000 | $2,500 | M | 30 |
| Failure to provide the location of the discharge | 5.4(b)4 | $500 | $1,000 | $2,500 | M | 30 |
| Failure to provide wind speed and direction | 5.4(b)5 | $500 | $1,000 | $2,500 | M | 30 |
| Failure to provide the area likely to be affected by the discharge | 5.4(b)6 | $500 | $1,000 | $2,500 | M | 30 |
Source context and notes
| Failure to maintain documentation | 5.3(e) | $1,000 | $2,000 | $5,000 | NM | 30 | | --- | --- | --- | --- | --- | --- | --- | | Failure to notify the Department of a discharge of aircraft fuel | 5.4(a) | $6,000 | $12,000 | $30,000 | NM | | | Failure to provide the person causing the discharge | 5.4(b)1 | $500 | $1,000 | $2,500 | M | 30 | | Failure to provide the amount of hazardous substance discharged | 5.4(b)2 | $500 | $1,000 | $2,500 | M | 30 | | Failure to provide the time the discharge occurred | 5.4(b)3 | $500 | $1,000 | $2,500 | M | 30 | | Failure to provide the location of the discharge | 5.4(b)4 | $500 | $1,000 | $2,500 | M | 30 | | Failure to provide wind speed and direction | 5.4(b)5 | $500 | $1,000 | $2,500 | M | 30 | | Failure to provide the area likely to be affected by the discharge | 5.4(b)6 | $500 | $1,000 | $2,500 | M | 30 | 14139. Table 39¶
N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 142
| Failure to notify the Department of a malfunction in a discharge detection system | 5.5(a) | $4,000 | $8,000 | $20,000 | NM |
|---|---|---|---|---|---|
| Notification not immediate | 5.5(b) | $2,000 | $4,000 | $10,000 | NM |
| Failure to notify the Department of the status of a malfunctioning discharge detection system | 5.5(c) | $2,000 | $4,000 | $10,000 | NM |
| Failure to take immediate action to stop a discharge | 5.7(a)1 | $40,000 | $50,000 | $50,000 | NM |
| Failure to follow the DCR plan | 5.7(a)2i | $40,000 | $50,000 | $50,000 | NM |
| Failure to coordinate any remedial action with the Department | 5.7(a)3 | $4,000 | $8,000 | $20,000 | NM |
| Failure to submit a confirmation report | 5.8(a) | $4,000 | $8,000 | $20,000 | NM |
| Failure to include information on the individual that reported the discharge | 5.8(c)1 | $500 | $1,000 | $2,000 | M 30 |
Source context and notes
| Failure to notify the Department of a malfunction in a discharge detection system | 5.5(a) | $4,000 | $8,000 | $20,000 | NM | | --- | --- | --- | --- | --- | --- | | Notification not immediate | 5.5(b) | $2,000 | $4,000 | $10,000 | NM | | Failure to notify the Department of the status of a malfunctioning discharge detection system | 5.5(c) | $2,000 | $4,000 | $10,000 | NM | | Failure to take immediate action to stop a discharge | 5.7(a)1 | $40,000 | $50,000 | $50,000 | NM | | Failure to follow the DCR plan | 5.7(a)2i | $40,000 | $50,000 | $50,000 | NM | | Failure to coordinate any remedial action with the Department | 5.7(a)3 | $4,000 | $8,000 | $20,000 | NM | | Failure to submit a confirmation report | 5.8(a) | $4,000 | $8,000 | $20,000 | NM | | Failure to include information on the individual that reported the discharge | 5.8(c)1 | $500 | $1,000 | $2,000 | M 30 | 14240. Table 40¶
N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 143
| Failure to include information on the individual submitting the report | 5.8(c)2 | $500 | $1,000 | $2,000 | M | 30 |
|---|---|---|---|---|---|---|
| Failure to include information on the owner(s) or operator(s) of where the discharge occurred | 5.8(c)3 | $500 | $1,000 | $2,000 | M | 30 |
| Failure to include the Communications Center number | 5.8(c)4 | $500 | $1,000 | $2,500 | M | 30 |
| Failure to include the source of the discharge | 5.8(c)5 | $500 | $1,000 | $2,000 | M | 30 |
| Failure to include the location of the discharge | 5.8(c)6 | $500 | $1,000 | $2,000 | M | 30 |
| Failure to include the name(s) and CAS number(s) of hazardous substance(s) discharged | 5.8(c)7 | $500 | $1,000 | $2,000 | M | 30 |
| Failure to include quantities of hazardous substances discharged | 5.8(c)8 | $500 | $1,000 | $2,000 | M | 30 |
Source context and notes
| Failure to include information on the individual submitting the report | 5.8(c)2 | $500 | $1,000 | $2,000 | M | 30 | | --- | --- | --- | --- | --- | --- | --- | | Failure to include information on the owner(s) or operator(s) of where the discharge occurred | 5.8(c)3 | $500 | $1,000 | $2,000 | M | 30 | | Failure to include the Communications Center number | 5.8(c)4 | $500 | $1,000 | $2,500 | M | 30 | | Failure to include the source of the discharge | 5.8(c)5 | $500 | $1,000 | $2,000 | M | 30 | | Failure to include the location of the discharge | 5.8(c)6 | $500 | $1,000 | $2,000 | M | 30 | | Failure to include the name(s) and CAS number(s) of hazardous substance(s) discharged | 5.8(c)7 | $500 | $1,000 | $2,000 | M | 30 | | Failure to include quantities of hazardous substances discharged | 5.8(c)8 | $500 | $1,000 | $2,000 | M | 30 | 14341. Table 41¶
N.J.A.C. 7:1E - Discharges of Petroleum and Other Hazardous Substances Rules, PDF p. 144
| Failure to include date and time information individual that reported the discharge | 5.8(c)9 | $500 | $1,000 | $2,000 | M | 30 |
|---|---|---|---|---|---|---|
| Failure to include a description of the measures taken and costs | 5.8(c)10 | $500 | $1,000 | $2,000 | M | 30 |
| Failure to include measures taken or proposed | 5.8(c)11 | $500 | $1,000 | $2,000 | M | 30 |
| Failure to include information on the entities involved in the cleanup | 5.8(c)12 | $500 | $1,000 | $2,000 | M | 30 |
| Failure to include supplemental information | 5.8(c)13 | $500 | $1,000 | $2,000 | M | 30 |
| Failure to include requested information | 5.8(c)14 | $500 | $1,000 | $2,000 | M | 30 |
| Failure to include certification | 5.8(c)15 | $500 | $1,000 | $2,000 | M | 30 |
| Failure to provide additional information | 5.8(d) | $500 | $1,000 | $2,000 | M | 30 |
| Failure to file a requested amendment following a discharge | 5.11 | $4,000 | $8,000 | $20,000 | NM |