| RPT01-C0009 |
15 |
Executive Summary |
sentence |
high |
verified |
E-11 |
njac_7_8 -> njac7_8_OCR p.1, 2026_BMP_9_7 -> `2026_... |
The January 2026 amendments to N.J.A.C. 7:8, issued alongside the January 2026 BMP Manual... |
| RPT01-C0014 |
23 |
1.1 Subchapter Organization |
sentence |
high |
verified |
|
njac_7_8 -> njac7_8_OCR p.1-2 |
The July 2023 version retained the five-subchapter structure carried into the January 202... |
| RPT01-C0015 |
25 |
1.1 Subchapter Organization |
bullet |
low |
verified |
|
njac_7_8 -> njac7_8_OCR p.3 |
Subchapter 1 - General Provisions |
| RPT01-C0016 |
26 |
1.1 Subchapter Organization |
bullet |
high |
verified |
|
njac_7_8 -> njac7_8_OCR p.1-2 |
Subchapter 2 - General Requirements for Stormwater Management Planning |
| RPT01-C0017 |
27 |
1.1 Subchapter Organization |
bullet |
medium |
verified |
|
njac_7_8 -> njac7_8_OCR p.1-2 |
Subchapter 3 - Regional Stormwater Management Planning |
| RPT01-C0018 |
28 |
1.1 Subchapter Organization |
bullet |
low |
verified |
|
njac_7_8 -> njac7_8_OCR p.1-2 |
Subchapter 4 - Municipal Stormwater Management Planning |
| RPT01-C0019 |
29 |
1.1 Subchapter Organization |
bullet |
low |
verified |
|
njac_7_8 -> njac7_8_OCR p.1-2 |
Subchapter 5 - Design and Performance Standards for Stormwater Management Measures |
| RPT01-C0020 |
37 |
1.1 Subchapter Organization |
sentence |
high |
verified |
|
njac_7_8 -> njac7_8_OCR p.28 |
The January 2026 amendments did not fundamentally reorder this subchapter hierarchy. The ... |
| RPT01-C0030 |
51 |
1.3 BMP Manual Reorganization and GI / ... |
sentence |
high |
verified |
|
2023_BMP_11_3 -> `2023_BMP_11_3_Manufactured_Treatment_... |
Both the 2023 and 2026 BMP Manuals organize practices into GI and Non-GI categories. The ... |
| RPT01-C0033 |
50 |
1.3 BMP Manual Reorganization and GI / ... |
sentence |
low |
verified |
|
2023_BMP_11_3 -> `2023_BMP_11_3_Manufactured_Treatment_... |
The BMP Manual chapter titles that carry GI/Non-GI designations are consistent across bot... |
| RPT01-C0035 |
54 |
1.3 BMP Manual Reorganization and GI / ... |
table_row |
high |
verified |
|
2023_BMP_11_3 -> `2023_BMP_11_3_Manufactured_Treatment_... |
Chapter 11.3 - Manufactured Treatment Devices (Non-GI) in both 2023 and 2026 |
| RPT01-C0036 |
55 |
1.3 BMP Manual Reorganization and GI / ... |
table_row |
high |
verified |
|
2023_BMP_11_6 -> 2023_BMP_11_6_Wet_Ponds p.1, `2026_B... |
Chapter 11.6 - Wet Ponds (Non-GI) in both 2023 and 2026 |
| RPT01-C0037 |
56 |
1.3 BMP Manual Reorganization and GI / ... |
table_row |
high |
verified |
|
2023_BMP_10_1 -> 2023_BMP_10_1_Bioretention_Systems p... |
Chapter 10.1 - Bioretention Systems (Large-Scale) in both 2023 and 2026 |
| RPT01-C0038 |
57 |
1.3 BMP Manual Reorganization and GI / ... |
table_row |
high |
verified |
|
2023_BMP_11_4 -> 2023_BMP_11_4_Sand_Filters p.1, `202... |
Chapter 11.4 - Sand Filters with Underdrains (Non-GI) in both 2023 and 2026 |
| RPT01-C0041 |
71 |
1.4 Applicability and Thresholds |
sentence |
high |
verified |
|
njac_7_8 -> njac7_8_OCR p.6-7 |
The 2026 amendments preserve the load-bearing major development thresholds rather than re... |
| RPT01-C0052 |
80 |
2.2 Water Quality Standards - TSS and N... |
sentence |
high |
verified |
E-05 |
njac_7_8 -> njac7_8_OCR p.39 |
The 2023 rules required 80% TSS removal from the Water Quality Design Storm runoff as the... |
| RPT01-C0061 |
92 |
2.3 Groundwater Recharge Standard |
sentence |
high |
verified |
E-08 |
njac_7_8 -> njac7_8_OCR p.44, 2026_BMP_5 -> `2026_B... |
In the cited recharge methodology, the pre-construction cover presumption is wooded land ... |
| RPT01-C0062 |
97 |
2.3 Groundwater Recharge Standard |
bullet |
high |
verified |
E-10 |
2023_BMP_6 -> 2023_BMP_6_Groundwater_Recharge p.17, `... |
Design permeability rate: Recharge and infiltration sizing must use a design permeability... |
| RPT01-C0063 |
98 |
2.3 Groundwater Recharge Standard |
bullet |
high |
verified |
E-01 |
njac_7_8 -> njac7_8_OCR p.33, 2023_BMP_9_8 -> `2023... |
Mounding analysis framing: The cited authority requires assessment of hydraulic impact on... |
| RPT01-C0065 |
102 |
2.4 Flood Control Standard |
sentence |
high |
verified |
E-02, E-07 |
njac_7_8 -> njac7_8_OCR p.42, njac_7_8 -> `njac7_8_... |
The flood control standard remained tied to all three design storms - 2-year, 10-year, an... |
| RPT01-C0072 |
113 |
2.5 Soil Testing Requirements |
bullet |
medium |
verified |
E-06 |
2023_BMP_12 -> 2023_BMP_12_Soil_Testing_Criteria p.27... |
Infiltration testing methodology: The cited guidance identifies recognized in-situ method... |
| RPT01-C0076 |
119 |
2.6 Design Storm |
sentence |
high |
verified |
E-07 |
njac_7_8 -> njac7_8_OCR p.39, njac_7_8 -> `njac7_8_... |
The Water Quality Design Storm remains 1.25 inches in 2 hours. For flood-control and rela... |
| RPT01-C0096 |
163 |
3.2 Terms and Concepts That Should Not ... |
sentence |
high |
verified |
E-03 |
2023_BMP_9_7 -> `2023_BMP_9_7_Small_Scale_Bioretention_... |
Bioretention System (Small-scale / large-scale distinction remains important, but the thr... |
| RPT01-C0143 |
243 |
Summary Table: Key Regulatory Changes a... |
table_row |
medium |
verified |
E-03 |
2023_BMP_9_7 -> `2023_BMP_9_7_Small_Scale_Bioretention_... |
Bioretention Scale |
| RPT01-C0148 |
233 |
Summary Table: Key Regulatory Changes a... |
table_row |
low |
verified |
E-01 |
njac_7_8 -> njac7_8_OCR p.33, 2023_BMP_9_8 -> `2023... |
Mounding Analysis Trigger |