Extracted images: Low Impact Development Techniques¶
Printed revision: February 2004.
Back to source | Original PDF | Image metadata
Original Mistral crops are preserved byte for byte. A crop can be a figure, table, equation, or other visual; no visual content is inferred as a numerical rule. Record and table associations use the same PDF page unless a direct image placeholder is identified. Nearby OCR excerpts are context, not verified captions.
PDF page 16, image 1¶
Mistral ID: img-0.jpeg. Extraction bundle(s): 2023_BMP_2_Low_Impact_Development_Techniques. Original page | Image file

Surrounding OCR excerpt:
[OCR image]
Figure 2-1: Schematic of Lot with Connected Impervious Areas
# Reduction of Runoff Volumes Due to Reduced Impervious Surfaces
Note: The computations were done by evaluating the runoff from the pervious and the impervious areas separately, and summing the volumes.
# Example A
Given: A 32670 sf lot with 27470 sf lawn, HSG "B", CN = 61, 5200 sf impervious surface, CN = 98. No impervious cover is discon
PDF page 17, image 1¶
Mistral ID: img-1.jpeg. Extraction bundle(s): 2023_BMP_2_Low_Impact_Development_Techniques. Original page | Image file

Surrounding OCR excerpt:
[OCR image]
Figure 2-2: Schematic of Lot with Connected and Unconnected Impervious Areas
# Changes in Runoff Volumes Due to Disconnection of Impervious Surfaces
# Example C
Given: A 32670 sf lot with 29870 sf lawn, HSG "B", CN = 61, 2800 sf impervious surface of total impervious area, CN = 98.
2000 sf of impervious area discharges to 8900 sf of lawn, and 800 sf impervious area is directly connected
$\mathrm{P}
PDF page 18, image 1¶
Mistral ID: img-2.jpeg. Extraction bundle(s): 2023_BMP_2_Low_Impact_Development_Techniques. Original page | Image file

Tables on the same PDF page: Table 1
Surrounding OCR excerpt:
[OCR image]
Figure 2-3: Schematic of Existing Lot and Standard Development Lot
# Comparison of Changes in Runoff Due to Low Impact Development Techniques
# Predeveloped Condition
0.75 acre lot
20,650 sf woods, HSG "B"
12,020 sf woods, HSG "C"
$\mathrm{P}_2 = 3.3$ inches, $\mathrm{P}_{10} = 5.2$ inches, and $\mathrm{P}_{100} = 7.5$ inch
$\mathrm{Tc} = 0.52$ hours
125 If sheet flow, $1.3\%$ slope, $\
PDF page 19, image 1¶
Mistral ID: img-3.jpeg. Extraction bundle(s): 2023_BMP_2_Low_Impact_Development_Techniques. Original page | Image file

Tables on the same PDF page: Table 2 | Table 3
Surrounding OCR excerpt:
[OCR image]
Figure 2-4: Schematic of Lot With LID Techniques
# Postdeveloped Condition (With LID Techniques)
0.75 acre lot, 2800 sf of total impervious area
800 sf of impervious area, directly connected, $\mathrm{Tc} = 0.1$ hours
2000 sf of impervious area, unconnected, discharging to 8906 sf of lawn
$\mathrm{P}_2 = 3.3$ inches, $\mathrm{P}_{10} = 5.2$ inches, and $\mathrm{P}_{100} = 7.5$ inch
Nonstruc