Tables: Infiltration Basins (Large-Scale GI)

Back to source | Source PDF | Structured table records

Table fragments retain their source context. Refer to the original page for layout, figures, merged headings and notes.

1. Table 1

BMP 2026, Ch 10.2, p. 1

N.J.A.C. 7:8 Stormwater Management Rules – Applicable Design and Performance Standards
Green Infrastructure Yes
Stormwater Runoff Quantity Yes, when designed as an on-line system
GR Groundwater Recharge Only with a waiver or variance from N.J.A.C. 7:8-5.3
% Stormwater Runoff Quality Only with a waiver or variance from N.J.A.C. 7:8-5.3, 80% TSS Removal
Stormwater Runoff Quality Mechanisms and Corresponding Criteria
--- ---
Settling
Storage Volume Entire Water Quality Design Storm (WQDS) Volume
Infiltration
Maximum Design Storm Drain Time 72 hours, Using Slowest Design Permeability Rate
Permeability Rate Factor of Safety 2
Minimum Subsoil Design Permeability Rate 0.5 inches/hour
Maximum Design Permeability Rate 10 inches/hour
Soil Testing Consistent with Chapter 12: Soil Testing Criteria Required
Minimum Distance between Basin Bottom and Seasonal High Water Table 2 feet
Biological and Chemical Activity
Minimum Sand Layer Thickness 6 inches
Minimum Sand Layer Permeability Rate 20 inches/hour, tested per Chapter 12
Maximum % Fines in Sand Layer 15%
Source context and notes Source revision: January 2026. # 10.2 INFILTRATION BASINS (LARGE-SCALE) [Figure: img-0.jpeg (original PDF, p. 1)](SOURCE.pdf#page=1) Infiltration basins are stormwater management systems constructed with highly permeable components designed to both maximize the removal of pollutants from stormwater, promote groundwater recharge and address the quantity impacts of land development. Pollutants are treated through settling, filtration of the runoff through, and biological and chemical activity within, the components. The total suspended solids (TSS) removal rate is 80%. | N.J.A.C. 7:8 Stormwater Management Rules – Applicable Design and Performance Standards | | | | --- | --- | --- | | | Green Infrastructure | Yes | | | Stormwater Runoff Quantity | Yes, when designed as an on-line system | | GR | Groundwater Recharge | Only with a waiver or variance from N.J.A.C. 7:8-5.3 | | % | Stormwater Runoff Quality | Only with a waiver or variance from N.J.A.C. 7:8-5.3, 80% TSS Removal | | Stormwater Runoff Quality Mechanisms and Corresponding Criteria | | | --- | --- | | Settling | | | Storage Volume | Entire Water Quality Design Storm (WQDS) Volume | | Infiltration | | | Maximum Design Storm Drain Time | 72 hours, Using Slowest Design Permeability Rate | | Permeability Rate Factor of Safety | 2 | | Minimum Subsoil Design Permeability Rate | 0.5 inches/hour | | Maximum Design Permeability Rate | 10 inches/hour | | Soil Testing Consistent with Chapter 12: Soil Testing Criteria | Required | | Minimum Distance between Basin Bottom and Seasonal High Water Table | 2 feet | | Biological and Chemical Activity | | | Minimum Sand Layer Thickness | 6 inches | | Minimum Sand Layer Permeability Rate | 20 inches/hour, tested per Chapter 12 | | Maximum % Fines in Sand Layer | 15% |

2. Table 2

BMP 2026, Ch 10.2, p. 13

Inflow Drainage Area = 5 acre (motor vehicle surface)
Pavement NRCS Curve Number (CN) = 98
Tested Sand Permeability Rate = 40 inches/hour
Tested Subsoil Permeability Rate = 8 inches/hour
Maximum Design Storm Water Depth = 2 ft
Sand Layer Depth = 6 in
Source context and notes Source revision: January 2026. # Designing an Infiltration Basin The following examples show how to design various infiltration basins to treat the runoff generated by the WQDS. The examples below are two of many possible ways to configure these basins and are not intended to limit the design. Example 1 - Surface Infiltration Basin: For one acre of impervious pavement, design an infiltration basin to infiltrate the runoff generated by the WQDS. Runoff will receive pretreatment by a forebay designed in accordance with the criteria established in this chapter. Runoff volumes in excess of the WQDS generated volume will discharge via an emergency spillway. The following parameters apply: | Inflow Drainage Area = | 5 acre (motor vehicle surface) | | --- | --- | | Pavement NRCS Curve Number (CN) = | 98 | | Tested Sand Permeability Rate = | 40 inches/hour | | Tested Subsoil Permeability Rate = | 8 inches/hour | | Maximum Design Storm Water Depth = | 2 ft | | Sand Layer Depth = | 6 in | ## Step 1: Runoff Calculations Using the NRCS method described in National Engineering Handbook, Part 630 (NEH) and discussed in Chapter 5, the runoff volume for the WQDS was calculated to be 18,777 cf. ## Step 2: Forebay Sizing