1. Table 1

NJDEP Bureau of Release Prevention - Audit Checklist, PDF p. 4

RECORDKEEPING Citation (N.J.A.C. 7:1E)
Facility has a copy of the approved or conditionally approved plan on-site. 4.6(g)
All records are available for inspection upon request 2.15(e)
Training records maintained for three (3) years 2.15(a)1
Training records include identification of personnel trained, subjects covered and dates 2.12(e)
Facility inventory records maintained for three years 2.15(a)4
Drills are conducted once per calendar year, drill documentation includes: date. personnel involved, event chronology, critique, recommendations with schedule 4.3(b)4iv
Annual drill records maintained for three (3) years 2.15(a)4
Records of inspections of cleanup and removal equipment maintained for three (3) years 2.15(a)3
Facility maintains and makes available for review a copy of all current contracts or agreements for discharge cleanup organization emergency response services 4.3(b)5
Records of discharge confirmation reports maintained for ten (10) years 2.15(b)2
Documentation of financial responsibility is available on-site 4.4(a)
Financial responsibility is for the full amount 4.4(b)
Letter from the chief financial officer is worded as specified 4.4(g)
Guarantee is worded as specified 4.4(k)
Liability insurance is worded as specified 4.4(l)
Surety bond is worded as specified 4.4(m)
Letter of credit is worded as specified 4.4(n)
Copies of SDSs are readily available to employees 2.14(c)
Records of visual inspection document all of the following: inspection performed, the date, person performing the inspection, any problems found, including if no problems were found, and the subsequent correction of such problems 2.10(b)
Records of inspection and repair are maintained for ten years or the lifetime of all equipment, and detection or monitoring, prevention or safety devices related to discharge prevention and response. 2.15(c)1
Records of inspection and repair are maintained for ten years or the lifetime of all structures other than aboveground storage tanks 2.15(c)2
Records of daily visual inspections for ASTs are maintained for 10 years or the lifetime of the tank, whichever is shorter 2.15(d)1
Records of monthly visual inspections for ASTs are maintained for 10 years or the lifetime of the tank, whichever is shorter 2.15(d)2
All other records of integrity testing, inspection, and repair for ASTs are maintained for the lifetime of the tank 2.15(d)3
Source context and notes Use of this checklist by an owner or operator of a major facility does not relieve them of the need to comply with the DPHS rules and may not identify all violations present at a given facility. | RECORDKEEPING | Citation (N.J.A.C. 7:1E) | | --- | --- | | Facility has a copy of the approved or conditionally approved plan on-site. | 4.6(g) | | All records are available for inspection upon request | 2.15(e) | | Training records maintained for three (3) years | 2.15(a)1 | | Training records include identification of personnel trained, subjects covered and dates | 2.12(e) | | Facility inventory records maintained for three years | 2.15(a)4 | | Drills are conducted once per calendar year, drill documentation includes: date. personnel involved, event chronology, critique, recommendations with schedule | 4.3(b)4iv | | Annual drill records maintained for three (3) years | 2.15(a)4 | | Records of inspections of cleanup and removal equipment maintained for three (3) years | 2.15(a)3 | | Facility maintains and makes available for review a copy of all current contracts or agreements for discharge cleanup organization emergency response services | 4.3(b)5 | | Records of discharge confirmation reports maintained for ten (10) years | 2.15(b)2 | | Documentation of financial responsibility is available on-site | 4.4(a) | | Financial responsibility is for the full amount | 4.4(b) | | Letter from the chief financial officer is worded as specified | 4.4(g) | | Guarantee is worded as specified | 4.4(k) | | Liability insurance is worded as specified | 4.4(l) | | Surety bond is worded as specified | 4.4(m) | | Letter of credit is worded as specified | 4.4(n) | | Copies of SDSs are readily available to employees | 2.14(c) | | Records of visual inspection document all of the following: inspection performed, the date, person performing the inspection, any problems found, including if no problems were found, and the subsequent correction of such problems | 2.10(b) | | Records of inspection and repair are maintained for ten years or the lifetime of all equipment, and detection or monitoring, prevention or safety devices related to discharge prevention and response. | 2.15(c)1 | | Records of inspection and repair are maintained for ten years or the lifetime of all structures other than aboveground storage tanks | 2.15(c)2 | | Records of daily visual inspections for ASTs are maintained for 10 years or the lifetime of the tank, whichever is shorter | 2.15(d)1 | | Records of monthly visual inspections for ASTs are maintained for 10 years or the lifetime of the tank, whichever is shorter | 2.15(d)2 | | All other records of integrity testing, inspection, and repair for ASTs are maintained for the lifetime of the tank | 2.15(d)3 |

2. Table 2

NJDEP Bureau of Release Prevention - Audit Checklist, PDF p. 5

ABOVEGROUND STORAGE TANKS Citation (N.J.A.C. 7:1E)
Integrity testing was performed on new field-erected tanks 2.16(b)1
Integrity testing was performed on new shop-built tanks 2.16(b)3
Integrity testing was performed on tanks returned to service or relocated 2.16(b)2
Facility is complying with API 653 2.16(d)1
Facility is complying with API 510 or ASME Section VIII, except that similar service and risk-based inspection scheduling set forth at API 519 are not permitted 2.16(d)2
Facility is complying with API 653 or SP001 for 2.16(e)
Facility is complying with FRP testing requirements 2.16(f)
Facility is complying with homogenous plastic tank testing requirements 2.16(g)
Facility is complying with five-year testing requirements 2.16(h)
Facility is complying with approved alternate testing requirements 2.16(i)
A storage tank failed an integrity test or inspection and was emptied and remains empty 2.16(j)
Pipes entering below the liquid level have remotely activated or readily accessible valves 2.2(a)3i
Pipes entering below the liquid level will prevent discharges outside of secondary containment 2.2(a)3i
Pipes entering below the liquid level do not impair the integrity of secondary containment 2.2(a)3ii
All AST's greater than 2,000 gallons have a high liquid level audible or visual alarm and one (1) of the following two required items 2.2(d)
High high liquid level pump cutoff device with a separate liquid level detector 2.2(d)1
Direct communication between tank gauger and personnel directly responsible for and in control of the filling operation (visual, phone or radio) 2.2(d)2
Overfill lines or vent lines are directed into secondary containment, other tanks or other appropriate holding areas 2.2(f)
DRUMS & OTHER STORAGE Citation (N.J.A.C. 7:1E)
--- ---
All container storage areas are equipped with adequate secondary containment or diversion systems 2.2(h)
Mobile or portable storage tanks are positioned or located so as to be protected by secondary containment and are not subject to periodic flooding or washout 2.2(g)
LOADING/UNLOADING AREAS Citation (N.J.A.C. 7:1E)
--- ---
All tank car or tank truck loading or unloading areas are equipped with secondary containment or diversion 2.3(a)
Source context and notes Use of this checklist by an owner or operator of a major facility does not relieve them of the need to comply with the DPHS rules and may not identify all violations present at a given facility. | ABOVEGROUND STORAGE TANKS | Citation (N.J.A.C. 7:1E) | | --- | --- | | Integrity testing was performed on new field-erected tanks | 2.16(b)1 | | Integrity testing was performed on new shop-built tanks | 2.16(b)3 | | Integrity testing was performed on tanks returned to service or relocated | 2.16(b)2 | | Facility is complying with API 653 | 2.16(d)1 | | Facility is complying with API 510 or ASME Section VIII, except that similar service and risk-based inspection scheduling set forth at API 519 are not permitted | 2.16(d)2 | | Facility is complying with API 653 or SP001 for | 2.16(e) | | | | | Facility is complying with FRP testing requirements | 2.16(f) | | Facility is complying with homogenous plastic tank testing requirements | 2.16(g) | | Facility is complying with five-year testing requirements | 2.16(h) | | Facility is complying with approved alternate testing requirements | 2.16(i) | | A storage tank failed an integrity test or inspection and was emptied and remains empty | 2.16(j) | | Pipes entering below the liquid level have remotely activated or readily accessible valves | 2.2(a)3i | | Pipes entering below the liquid level will prevent discharges outside of secondary containment | 2.2(a)3i | | Pipes entering below the liquid level do not impair the integrity of secondary containment | 2.2(a)3ii | | All AST's greater than 2,000 gallons have a high liquid level audible or visual alarm and one (1) of the following two required items | 2.2(d) | | High high liquid level pump cutoff device with a separate liquid level detector | 2.2(d)1 | | Direct communication between tank gauger and personnel directly responsible for and in control of the filling operation (visual, phone or radio) | 2.2(d)2 | | | | | Overfill lines or vent lines are directed into secondary containment, other tanks or other appropriate holding areas | 2.2(f) | | DRUMS & OTHER STORAGE | Citation (N.J.A.C. 7:1E) | | --- | --- | | All container storage areas are equipped with adequate secondary containment or diversion systems | 2.2(h) | | Mobile or portable storage tanks are positioned or located so as to be protected by secondary containment and are not subject to periodic flooding or washout | 2.2(g) | | LOADING/UNLOADING AREAS | Citation (N.J.A.C. 7:1E) | | --- | --- | | All tank car or tank truck loading or unloading areas are equipped with secondary containment or diversion | 2.3(a) |

3. Table 3

NJDEP Bureau of Release Prevention - Audit Checklist, PDF p. 6

A system to prevent tank car or tank truck departure before complete disconnect of loading or unloading lines is utilized in loading or unloading areas 2.3(e)
Tanks cars in the process of being loaded or unloaded are attended at reasonable intervals and during topping off 2.3(f)
Tanks trucks being loaded or unloaded are attended at all times 2.3(g)
IN-FACILITY PIPES Citation (N.J.A.C. 7:1E)
--- ---
In-facility pipes containing hazardous substances are sufficiently marked to identify the substances in them 2.4(a)
Out-of-service pipes are blank-flanged and marked as to origin or physically removed 2.4(e)
Means of minimizing chances of vehicular collision with overhead pipes are in place 2.4(g)
PROCESS AREAS Citation (N.J.A.C. 7:1E)
--- ---
Process areas are provided with a means of secondary containment or diversion 2.5(a)
SECONDARY CONTAINMENT Citation (N.J.A.C. 7:1E)
--- ---
Secondary containment blocks all probable routes by which leaked hazardous substances could reasonably expected to become discharges 2.6(c)1
Secondary containment systems are not used as backup storage systems or any other purpose that impairs the capacity to contain leaks 2.6(c)7
MARINE TRANSFER AREAS Citation (N.J.A.C. 7:1E)
--- ---
Facility keeps available a length of floatation boom or other containment device sufficient to totally enclose a vessel or vessels while engaged in transfer of hazardous substances 2.7(b)
Containment device is deployed, when conditions permit the effective use and safe deployment, prior to commencing the transfer of any non-miscible lighter-than-water hazardous substance with a flash point in excess of 100 degrees F. 2.7(c)
Containment devices are maintained on a standby basis, ready for rapid deployment when conditions prohibit immediate deployment 2.7(d)
When vessels are docked, and the dock acts as an effective barrier, the containment device encircles the rest of the vessel 2.7(e)
Containment device is maintained in a manner that minimizes the potential for any discharged hazardous substances from leaving the contained area 2.7(f)
Facility displays a copy of information required for discharge notification in a conspicuous format at any transfer areas and the operations center 2.7(j)
There is fixed lighting for each transfer connection point in use at the facility 2.8(a)1
There is fixed lighting for each hazardous substance transfer work area at the facility 2.8(a)3
Source context and notes Use of this checklist by an owner or operator of a major facility does not relieve them of the need to comply with the DPHS rules and may not identify all violations present at a given facility. | A system to prevent tank car or tank truck departure before complete disconnect of loading or unloading lines is utilized in loading or unloading areas | 2.3(e) | | --- | --- | | Tanks cars in the process of being loaded or unloaded are attended at reasonable intervals and during topping off | 2.3(f) | | Tanks trucks being loaded or unloaded are attended at all times | 2.3(g) | | IN-FACILITY PIPES | Citation (N.J.A.C. 7:1E) | | --- | --- | | In-facility pipes containing hazardous substances are sufficiently marked to identify the substances in them | 2.4(a) | | Out-of-service pipes are blank-flanged and marked as to origin or physically removed | 2.4(e) | | Means of minimizing chances of vehicular collision with overhead pipes are in place | 2.4(g) | | PROCESS AREAS | Citation (N.J.A.C. 7:1E) | | --- | --- | | Process areas are provided with a means of secondary containment or diversion | 2.5(a) | | SECONDARY CONTAINMENT | Citation (N.J.A.C. 7:1E) | | --- | --- | | Secondary containment blocks all probable routes by which leaked hazardous substances could reasonably expected to become discharges | 2.6(c)1 | | Secondary containment systems are not used as backup storage systems or any other purpose that impairs the capacity to contain leaks | 2.6(c)7 | | MARINE TRANSFER AREAS | Citation (N.J.A.C. 7:1E) | | --- | --- | | Facility keeps available a length of floatation boom or other containment device sufficient to totally enclose a vessel or vessels while engaged in transfer of hazardous substances | 2.7(b) | | Containment device is deployed, when conditions permit the effective use and safe deployment, prior to commencing the transfer of any non-miscible lighter-than-water hazardous substance with a flash point in excess of 100 degrees F. | 2.7(c) | | Containment devices are maintained on a standby basis, ready for rapid deployment when conditions prohibit immediate deployment | 2.7(d) | | When vessels are docked, and the dock acts as an effective barrier, the containment device encircles the rest of the vessel | 2.7(e) | | Containment device is maintained in a manner that minimizes the potential for any discharged hazardous substances from leaving the contained area | 2.7(f) | | Facility displays a copy of information required for discharge notification in a conspicuous format at any transfer areas and the operations center | 2.7(j) | | There is fixed lighting for each transfer connection point in use at the facility | 2.8(a)1 | | There is fixed lighting for each hazardous substance transfer work area at the facility | 2.8(a)3 |

4. Table 4

NJDEP Bureau of Release Prevention - Audit Checklist, PDF p. 7

FLOOD HAZARD AREAS Citation (N.J.A.C. 7:1E)
Hazardous substances stored within the tidal floodplain or the floodway are adequately protected 2.9(a)
Hazardous substances stored within an area known to be subject to flooding are adequately protected 2.9(b)
VISUAL INSPECTION & MONITORING Citation (N.J.A.C. 7:1E)
--- ---
Inspections are performed prior to each marine transfer and include: lighting, valves, pumps, flanges, flexible hoselines and connections to be used in the transfer 2.10(a)1
Inspection of AST secondary containment and diversion systems which are not impermeable, and the aboveground storage tanks within these systems, is performed daily and includes integrity and leaks 2.10(a)2
Inspection of loading or unloading areas is performed daily or prior to each use and includes: integrity, deterioration, leaks and flexible hoselines 2.10(a)3
Inspection of process areas is performed weekly and includes integrity and leaks 2.10(a)4
Inspection of all other AST, all other storage areas, all other secondary containment, or diversion systems and all aboveground pipes is performed monthly and includes integrity and leaks 2.10(a)5
Inspection of all other aboveground valves, pumps, flanges, connections and equipment is performed quarterly and includes integrity and leaks 2.10(a)6i
Inspection of all security items is performed quarterly and includes integrity 2.10(a)6ii
Inspection of all cleanup and removal equipment and supplies is performed quarterly and includes adequacy 2.10(a)6iii
HOUSEKEEPING & MAINTENANCE Citation (N.J.A.C. 7:1E)
--- ---
Hazardous substances are protected from the elements and the possibility of leakage 2.11(a)
Leaking equipment is promptly repaired, replaced or taken out of use 2.11(b)
Leaks are captured and contained 2.11(b)
All leaks are promptly cleaned up, loose quantities of hazardous substances are not allowed to persist on grounds, floors, walls, equipment or any other place within the facility 2.11(c)
All discharges are promptly cleaned up, loose quantities of hazardous substances are not allowed to persist on grounds, floors, walls, equipment or any other place within the facility 2.11(c)
Facility has on hand in convenient locations adequate quantities of cleanup materials sufficient to contain and clean up small leaks or discharges they will respond to 2.11(d)
Facility maintains an adequate supply of protective safety equipment 2.11(e)
Secondary containment is kept in good repair, free of cracks through which hazardous substances could be discharged 2.11(f)
Secondary containment is free of accumulated debris 2.11(f)
Source context and notes Use of this checklist by an owner or operator of a major facility does not relieve them of the need to comply with the DPHS rules and may not identify all violations present at a given facility. | FLOOD HAZARD AREAS | Citation (N.J.A.C. 7:1E) | | --- | --- | | Hazardous substances stored within the tidal floodplain or the floodway are adequately protected | 2.9(a) | | Hazardous substances stored within an area known to be subject to flooding are adequately protected | 2.9(b) | | VISUAL INSPECTION & MONITORING | Citation (N.J.A.C. 7:1E) | | --- | --- | | Inspections are performed prior to each marine transfer and include: lighting, valves, pumps, flanges, flexible hoselines and connections to be used in the transfer | 2.10(a)1 | | Inspection of AST secondary containment and diversion systems which are not impermeable, and the aboveground storage tanks within these systems, is performed daily and includes integrity and leaks | 2.10(a)2 | | Inspection of loading or unloading areas is performed daily or prior to each use and includes: integrity, deterioration, leaks and flexible hoselines | 2.10(a)3 | | Inspection of process areas is performed weekly and includes integrity and leaks | 2.10(a)4 | | Inspection of all other AST, all other storage areas, all other secondary containment, or diversion systems and all aboveground pipes is performed monthly and includes integrity and leaks | 2.10(a)5 | | Inspection of all other aboveground valves, pumps, flanges, connections and equipment is performed quarterly and includes integrity and leaks | 2.10(a)6i | | Inspection of all security items is performed quarterly and includes integrity | 2.10(a)6ii | | Inspection of all cleanup and removal equipment and supplies is performed quarterly and includes adequacy | 2.10(a)6iii | | HOUSEKEEPING & MAINTENANCE | Citation (N.J.A.C. 7:1E) | | --- | --- | | Hazardous substances are protected from the elements and the possibility of leakage | 2.11(a) | | Leaking equipment is promptly repaired, replaced or taken out of use | 2.11(b) | | Leaks are captured and contained | 2.11(b) | | All leaks are promptly cleaned up, loose quantities of hazardous substances are not allowed to persist on grounds, floors, walls, equipment or any other place within the facility | 2.11(c) | | All discharges are promptly cleaned up, loose quantities of hazardous substances are not allowed to persist on grounds, floors, walls, equipment or any other place within the facility | 2.11(c) | | Facility has on hand in convenient locations adequate quantities of cleanup materials sufficient to contain and clean up small leaks or discharges they will respond to | 2.11(d) | | Facility maintains an adequate supply of protective safety equipment | 2.11(e) | | Secondary containment is kept in good repair, free of cracks through which hazardous substances could be discharged | 2.11(f) | | Secondary containment is free of accumulated debris | 2.11(f) |

5. Table 5

NJDEP Bureau of Release Prevention - Audit Checklist, PDF p. 8

EMPLOYEE TRAINING PROGRAM Citation (N.J.A.C. 7:1E)
Training program implemented 2.12(a)
Training program written description maintained 2.12(a)
All new employees involved in the handling of hazardous substances receive general orientation and initial training. 2.12(c)1
All new employees receive job-specific training 2.12(c)2
Training provided covering updated or new SOPs 2.12(c)3
Refresher training conducted at least once per year and presents an overview and updated information pertaining to the employee’s duties and responsibilities related to hazardous substances 2.12(c)4
SECURITY Citation (N.J.A.C. 7:1E)
--- ---
Facility is adequately illuminated so that intruders, leaks or discharges can be detected 2.13(a)
Facility has security sufficient to prevent unauthorized persons from gaining access to hazardous substances 2.13(b)
STANDARD OPERATING PROCEDURES Citation (N.J.A.C. 7:1E)
--- ---
A current index of SOPs noting ID numbers and latest dates of issue is maintained and is readily available 2.14(h)
A copy of SOPs is readily available to employees 2.14(b)
SOPs are written in English and any other necessary language 2.14(a)
SOPs include a description of the operation, including all applicable requirements from N.J.A.C. 7:1E-2 2.14(d)1
SOPs include procedures for visual inspection of equipment 2.14(d)2
SOPs include procedures and conditions for normal operation 2.14(d)3
SOPs include leak or discharge information for the operation 2.14(d)5
SOPs include information on leak monitoring equipment and alarms 2.14(d)4
SOPs include simplified process flow sheets 2.14(e)1
SOPs include a description of abnormal conditions 2.14(e)2
SOPs include pre-startup procedures 2.14(e)3
SOPs include startup procedures 2.14(e)4
SOPs include shutdown procedures 2.14(e)5
SOPs include procedures to perform and inspect maintenance 2.14(e)6
SOPs include log sheets and checklists 2.14(e)7
Generic SOPs cover all hazardous substances utilized and delineate any special conditions 2.14(f)
Source context and notes Use of this checklist by an owner or operator of a major facility does not relieve them of the need to comply with the DPHS rules and may not identify all violations present at a given facility. | EMPLOYEE TRAINING PROGRAM | Citation (N.J.A.C. 7:1E) | | --- | --- | | Training program implemented | 2.12(a) | | Training program written description maintained | 2.12(a) | | All new employees involved in the handling of hazardous substances receive general orientation and initial training. | 2.12(c)1 | | All new employees receive job-specific training | 2.12(c)2 | | Training provided covering updated or new SOPs | 2.12(c)3 | | Refresher training conducted at least once per year and presents an overview and updated information pertaining to the employee’s duties and responsibilities related to hazardous substances | 2.12(c)4 | | SECURITY | Citation (N.J.A.C. 7:1E) | | --- | --- | | Facility is adequately illuminated so that intruders, leaks or discharges can be detected | 2.13(a) | | Facility has security sufficient to prevent unauthorized persons from gaining access to hazardous substances | 2.13(b) | | STANDARD OPERATING PROCEDURES | Citation (N.J.A.C. 7:1E) | | --- | --- | | A current index of SOPs noting ID numbers and latest dates of issue is maintained and is readily available | 2.14(h) | | A copy of SOPs is readily available to employees | 2.14(b) | | SOPs are written in English and any other necessary language | 2.14(a) | | SOPs include a description of the operation, including all applicable requirements from N.J.A.C. 7:1E-2 | 2.14(d)1 | | SOPs include procedures for visual inspection of equipment | 2.14(d)2 | | SOPs include procedures and conditions for normal operation | 2.14(d)3 | | SOPs include leak or discharge information for the operation | 2.14(d)5 | | SOPs include information on leak monitoring equipment and alarms | 2.14(d)4 | | SOPs include simplified process flow sheets | 2.14(e)1 | | SOPs include a description of abnormal conditions | 2.14(e)2 | | SOPs include pre-startup procedures | 2.14(e)3 | | SOPs include startup procedures | 2.14(e)4 | | SOPs include shutdown procedures | 2.14(e)5 | | SOPs include procedures to perform and inspect maintenance | 2.14(e)6 | | SOPs include log sheets and checklists | 2.14(e)7 | | Generic SOPs cover all hazardous substances utilized and delineate any special conditions | 2.14(f) |

6. Table 6

NJDEP Bureau of Release Prevention - Audit Checklist, PDF p. 9

EMPLOYEE PARTICIPATION
Notice or a copy of any Department notice, was conspicuously displayed in the area subject to the inspection or audit, immediately upon notification
Copy of posted notice provided to the employee representative
Employees were afforded an opportunity to participate in inspection or audit
Employee representative was afforded an opportunity to participate in inspection or audit
Employee(s) participated
Source context and notes Use of this checklist by an owner or operator of a major facility does not relieve them of the need to comply with the DPHS rules and may not identify all violations present at a given facility. | EMPLOYEE PARTICIPATION | | --- | | Notice or a copy of any Department notice, was conspicuously displayed in the area subject to the inspection or audit, immediately upon notification | | Copy of posted notice provided to the employee representative | | Employees were afforded an opportunity to participate in inspection or audit | | Employee representative was afforded an opportunity to participate in inspection or audit | | Employee(s) participated |